Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2008-02-11 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2008-02-11) 

UIT-T SG15

Infrastructures des réseaux optiques et autres réseaux de transport

Période d'études 2005

Réunion  du 2008-02-11 au 2008-02-22

Lieu : Suisse [Genève]

Autres réunions : 2009-09-28  2008-12-01  2007-06-04  2006-10-30  2006-02-06  2005-05-16  2004-11-29 

Resultats:22 documents
Contributions  [ Source: NTT ]   Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 913 ]  
 
2008-02-06 NTT   Some concerns about and proposals for the future direction of ASON     Q14/15, Q12/15  
[ 912 ]  
 
2008-02-06 NTT   Proposal to start discussion on power consumption and its reduction in optical transmission systems     Q7/15, Q6/15  
[ 875 ]  
 
2008-02-01 NTT , Nokia Siemens Networks   G.8032 Non-Revertive Operation behaviour     Q9/15  
[ 864 ]  
 
2008-02-01 NTT , Nokia siemens Networks   G.8032 State Machine Proposal     Q9/15  
[ 860 ]  
 
2008-02-01 NTT , Nokia Siemens Networks GmbH & Co. KG   Usage and reservation of new multicast group addresses for R-APS message     Q9/15  
[ 859 ]  
 
2008-02-01 NTT , Nokia Siemens Networks GmbH & Co. KG   G.8032 Manual Switch Behaviour     Q9/15  
[ 787 ]  
 
2008-01-31 NTT   Proposal of PMD value that should be considered in 40Gb/s modulation formats     Q6/15  
[ 786 ]  
 
2008-01-31 NTT   40 GbE MTTFPA when using 512B/513B transcoding     Q11/15  
[ 785 ]  
 
2008-01-31 NTT   OTN enhancement accommodating Ethernet clients with bit transparency as well as block code transparency     Q11/15  
[ 782 ]  
 
2008-01-31 NTT   Proposed study items for packet based transport technologies for the next study period (2009-2012)     QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15  
[ 781 ]  
 
2008-01-31 NTT   Proposed update for "Optical Transport Networks & Technologies Standardization Work Plan"     Q3/15  
[ 780 ]  
 
2008-01-31 NTT   Information on Raman gain distribution measurement technique     Q8/15  
[ 779 ]  
 
2008-01-31 NTT   Proposal regarding Q8/15 study items for the 2009-2012 study period     Q8/15  
[ 778 ]  
 
2008-01-31 NTT   Proposal regarding Q5/15 study items for the 2009-2012 study period     Q5/15  
[ 777 ]  
 
2008-01-31 NTT   Proposal of a draft for a new supplement regarding the general characteristics of optical fibre under actual use conditions     Q5/15  
[ 776 ]  
 
2008-01-31 NTT   Summary of correspondence activity on a new supplement regarding the general characteristics of an optical fibre under actual use conditions     Q5/15  
[ 708 ]  
 
2008-01-30 NTT, Mitsubishi   The scope of G.hnta and G.hn     Q4/15, Q2/15, Q1/15  
[ 707 ]  
 
2008-01-30 Mitsubishi, NTT   Proposal of discussion on G.hntreq for technical requirements     Q4/15, Q2/15, Q1/15  
[ 706 ]  
 
2008-01-30 Mitsubishi, NTT   Proposal of distribution of information for home network QoS and applications     Q4/15, Q2/15, Q1/15  
[ 705 ]  
 
2008-01-30 NTT, Mitsubishi.   Proposed update of Clause 8 "High level requirements" of G.hnta     Q4/15, Q2/15, Q1/15  
[ 704 ]  
 
2008-01-30 NTT, Mitsubishi   Proposed update of Clauses 1, 6 and 7 of G.hnta     Q4/15, Q2/15, Q1/15  
[ 682 ]  
 
2008-01-30 NTT & France Telecom   Proposal for a silent start mode for ONUs     Q2/15  
Resultats:22 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

 

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2014-8-2