Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2008-02-11 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2008-02-11) 

UIT-T SG15

Infrastructures des réseaux optiques et autres réseaux de transport

Période d'études 2005

Réunion  du 2008-02-11 au 2008-02-22

Lieu : Suisse [Genève]

Autres réunions : 2009-09-28  2008-12-01  2007-06-04  2006-10-30  2006-02-06  2005-05-16  2004-11-29 

Resultats:24 documents
Contributions  [ Questions: Q12/15 ]   Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 913 ]  
 
2008-02-06 NTT   Some concerns about and proposals for the future direction of ASON     Q14/15, Q12/15  
[ 908 ]  
 
2008-02-03 Deutsche Telekom   Layer model of Ethernet     Q12/15  
[ 856 ]  
 
2008-02-01 Alcatel-Lucent   Change Proposal for G.7712 re the T-MPLS Management Communication Channel     Q12/15, Q14/15  
[ 843 ]  
 
2008-02-01 CMCC , Alcatel Shangai Bell , CU , CATR MII China   Requirement of MS-PW over T-MPLS     Q12/15, Q11/15, Q9/15  
[ 830 ]  
 
2008-02-01 Huawei   G.pacmod-bis: Test results of the new timing distribution mechanism     Q14/15, Q13/15, Q12/15  
[ 828 ]  
 
2008-01-31 Huawei   Requirements for Network Automatic Configuration     Q14/15, Q12/15  
[ 826 ]  
 
2008-01-31 Huawei   Corrections to FD/FDFr Usage in G.8010     Q12/15  
[ 823 ]  
 
2008-01-31 Huawei   PBB Model for G.8010     Q12/15  
[ 822 ]  
 
2008-01-31 Huawei   G.800 Term for Interconnect Transport Entities     Q12/15  
[ 821 ]  
 
2008-01-31 Huawei   G.800 description modification     Q12/15  
[ 815 ]  
 
2008-01-31 Huawei , Nokia Siemens Networks   Annex of G.8010v2 to describe the PVT network application     Q12/15  
[ 797 ]  
 
2008-01-31 Fujitsu   Consideration on IP/MPLS and T-MPLS interworking     Q12/15  
[ 788 ]  
 
2008-01-31 BT   Complexity, Scalability, Independency, and Transparency     Q12/15  
[ 782 ]  
 
2008-01-31 NTT   Proposed study items for packet based transport technologies for the next study period (2009-2012)     QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15  
[ 738 ]  
 
2008-01-30 ZTE   Combination of protection and restoration in G.8080     Q12/15  
[ 734 ]  
 
2008-01-30 ZTE   Clarification for FP partitioning in G.8010     Q12/15  
[ 730 ]  
 
2008-01-30 ZTE   Proposal for adding definition of control component topology in ASON     Q12/15  
[ 713 ]  
 
2008-01-30 BT, Nortel Networks (Europe)   VLAN model in G.8010     Q12/15  
[ 712 ]  
 
2008-01-30 BT, Nortel Networks (Europe)   PBB model for G.8010     Q12/15  
[ 711 ]  
 
2008-01-30 BT, Nortel Networks (Europe)   Approach to modelling in G.pbb-te     Q12/15  
[ 677 ]  
 
2008-01-29 Nortel Networks (Canada)   Proposed liaison response for PCE     Q14/15, Q12/15  
[ 654 ]  
 
2008-01-29 Ciena Corp   DCN Architecture and Gateways     Q14/15, Q12/15  
[ 653 ]  
 
2008-01-29 Ciena Corp   Problems with G.8010     Q14/15, Q12/15, Q9/15  
[ 651 ]  
 
2008-01-29 Ciena Corp, Nortel Networks (USA)   The future of G.7716     Q12/15  
Resultats:24 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

 

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2014-7-13