Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2007-06-04 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2007-06-04) 

UIT-T SG15

Infrastructures des réseaux optiques et autres réseaux de transport

Période d'études 2005

Réunion  du 2007-06-04 au 2007-06-15

Lieu : Suisse [Genève]

Autres réunions : 2008-12-01  2008-02-11  2006-10-30  2006-02-06  2005-05-16  2004-11-29 

Resultats:332 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 449 ]  
 
Proposal of transmission of a phase information using OAM messages     France Telecom   Q13/15   2007-05-24
[ 448 ]  
 
G.Paclock - Split of the recommendation into two documents.     France Telecom   Q13/15   2007-05-24
[ 447 ]  
 
Synchronous Ethernet SSM - list of issues     France Telecom   Q13/15   2007-05-24
[ 446 ]  
 
Corrections in G.8261 latest draft     France Telecom   Q13/15   2007-05-24
[ 445 ]  
 
Proposal for new signalling for preventing undesirable operational events in ASON     Nippon Telegraph & Telephone Corp. (NTT)   Q14/15   2007-05-24
[ 444 ]  
 
Proposal for 40G jitter standardization     Nippon Telegraph & Telephone Corp. (NTT)   Q6, 13/15   2007-05-24
[ 443 ]  
 
Proposal of actions for future ASON standardization that involve other standard bodies     Nippon Telegraph & Telephone Corp. (NTT)   Q12, 14/15   2007-05-24
[ 442 ]  
 
Proposal to separate existing ASON control plane recommendation (G.8080) for SDH/OTN from T-MPLS control plane recommendation     Nippon Telegraph & Telephone Corp. (NTT)   Q12, 14/15   2007-05-24
[ 441 ]  
 
Proposal to adopt a channel passband width parameter in G.otf for future high speed networks     KDDI   Q6/15   2007-05-24
[ 440 ]  
 
Clarification of EXER and RR operation on G.8031     NEC Corporation   Q9/15   2007-05-24
[ 439 ]  
 
Proposal on the protection switching mechanisms on G.8032     NEC Corporation   Q9/15   2007-05-24
[ 438 ]  
 
Proposal of 40G format for G.dapp2 application     France Telecom   Q6/15   2007-05-24
[ 437 ]  
 
G.paclock: proposal for jitter tolerance section 5.5.2     Alcatel-Lucent   Q13/15   2007-05-24
[ 436 ]  
 
Influence of the SSM rate on the reconfiguration time     Alcatel-Lucent   Q13/15   2007-05-24
[ 435 ]  
 
Proposal for modification of section 5.1 of G.paclock     Alcatel-Lucent   Q13/15   2007-05-24
[ 434 ]  
 
Notion of skewness     Semtech   Q13/15   2007-05-25
[ 433 ]  
 
Proposal on how external protection could be met via G-PON     China Mobile Communication Corp. (CMCC) , China Unicom Corporation , China Netcom Corporation , China Telecom Corporation , China Ministry of Information Industry (MII)   Q2/15   2007-05-24
[ 432 ]  
 
Proposals to add directory service component into G.8080     ZTE Corporation   Q12/15   2007-05-24
[ 431 ]  
 
G.VDSL2: Proposal on on-line reconfiguration     ZTE Corp, China Netcom   Q4/15   2007-05-24
[ 430 ]  
 
Proposal for Key Management in GPON System     ZTE Corporation, China Netcom   Q2/15   2007-05-24
[ 429 ]  
 
Proposal for considering dispersion compensation module in PXCs and OADMs in G.otf     ZTE Corporation, China   Q6/15   2007-05-24
[ 428 ]  
 
Proposed Mechanism of Ethernet Smart Ring Protection ( For G.8032)     ZTE Corporation, China   Q9/15   2007-05-24
[ 427 ]  
 
Comments to G.tmpls_mgmt     ZTE   Q14/15   2007-05-24
[ 426 ]  
 
Suggestion to information model definition of T-MPLS     ZTE   Q14/15   2007-05-24
[ 425 ]  
 
Modify definition of SNP states in G.8080 and G.7713     ZTE Corporation   Q12,14/15   2007-05-24
[ 424 ]  
 
Comparing the extended linear protection mechanisms with the wrapping and steering in the T-MPLS ring     ZTE Corporation   Q9/15   2007-05-24
[ 423 ]  
 
Applying the extended linear protection switching mechanisms in the T-MPLS ring     ZTE Corporation   Q9/15   2007-05-24
[ 422 ]  
 
An extension of the bit rate agnostic mapping method for constant bit rate signals     ZTE   Q11/15   2007-05-24
[ 421 ]  
 
Correcting the binding relationship between different control plane components in G.7716     ZTE Corporation   Q14/15   2007-05-24
[ 420 ]  
 
A proposed description of Ethernet Virtual Private Rooted Multipoint (EVP-RMP) service     Alcatel Shanghai Bell, LSI Corp   Q11/15   2007-05-24
[ 419 ]  
(Rev.1) 
Definition of rooted multipoint service     Alcatell Shanghai Bell, LSI Corp   Q11/15   2007-05-24
[ 418 ]  
 
Proposed modification of accounting management to G.7718     China, Telecom   Q14/15   2007-05-24
[ 417 ]  
 
Proposals for control plane performance monitoring parameters     China Academy of Telecommunications Research (MII)   Q14/15, Q12/15   2007-05-24
[ 416 ]  
 
Timing Requirements for packet-based methods     Semtech   Q13/15   2007-05-24
[ 415 ]  
 
Metrics related to QoS and QoE related to timing     Semtech   Q13/15   2007-05-24
[ 414 ]  
 
Traffic Models in G.8261 - Part 2     Semtech   Q13/15   2007-05-24
[ 413 ]  
 
Traffic Models in G.8261 - Part 1     Semtech   Q13/15   2007-05-24
[ 412 ]  
 
Support of manageable multicast in G.984.4     Ministry of Information Industry of P.R. China   Q2/15   2007-05-24
[ 411 ]  
 
Proposed text for section 6, 9.3 and 11.2.1 of G.7716 v0.7 draft     Ministry of Information Industry of P.R. China   Q14/15   2007-05-24
[ 410 ]  
 
Proposed text for section 5 of G.7716 v0.7 draft     Ministry of Information Industry of P.R. China   Q14/15   2007-05-24
[ 409 ]  
 
Proposals of new interface to LRM component in G.8080     Ministry of Information Industry of P.R. China   Q12/15   2007-05-24
[ 408 ]  
 
Explanations to ASON directly support VCAT and LCAS (For Information)     Ministry of Information Industry of P.R. China   Q12/15   2007-05-24
[ 407 ]  
 
Support point to multi point connection in G.8080     Ministry of Information Industry of P.R. China   Q12/15   2007-05-24
[ 406 ]  
 
Proposed new section 14 in G.7716 v0.7 draft     Ministry of Information Industry of P.R. China   Q14/15   2007-05-24
[ 405 ]  
 
Proposed text for section 10.3 of G.7716 v0.7 draft     Ministry of Information Industry of P.R. China   Q14/15   2007-05-24
[ 404 ]  
 
Proposal to table 1 of section 8.1 of G.7716 v0.7 draft     Ministry of Information Industry of P.R. China   Q14/15   2007-05-24
[ 403 ]  
 
WITHDRAWN - See C476     N/A     N/A
[ 402 ]  
 
G.paclock Synchronisation Selection     BT plc   Q13/15   2007-05-24
[ 401 ]  
 
Synchronous Ethernet - Synchronisation Status Message (SSM) Transport Requirements     BT plc   Q13/15   2007-05-24
[ 400 ]  
 
Framework for Extracting Timing Metrics from a Packet-Based Network     Symmetricom   Q13/15   2007-05-22
Resultats:332 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-5-6