Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2005-05-16 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  TD-WP2 (2005-05-16) 

UIT-T SG15

Infrastructures des réseaux optiques et autres réseaux de transport

Période d'études 2005

Réunion  du 2005-05-16 au 2005-05-27

Lieu : Suisse [Genève]

Autres réunions : 2008-12-01  2008-02-11  2007-06-04  2006-10-30  2006-02-06  [ 2005-05-16 ]  2004-11-29 

Resultats:56 documents
Résultats :   -  1 - 2  -  Next
Documents Temporaires  (WP2)   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 74-WP2 ]  
 
Application code criteria for draft new Rec. G.fso     Editor Rec. G.fso   Q6/15   2005-05-15
[ 73-WP2 ]  
 
Draft agenda for the Q6/15 meeting     Rapporteur Q6/15   Q6/15   2005-05-15
[ 72-WP2 ]  
 
Open issues for Draft New Recommendation G.666 (ex G.PMDC) based on Q.7/15 e-mail correspondence     Editor Rec. G.666   Q7/15   2005-05-15
[ 71-WP2 ]  
 
Status of Q.6/15 correspondence simulations for G.696.1 based on WD6 41     Correspondence Simulation Group G.696.1-WD6-41   Q6/15   2005-05-15
[ 70-WP2 ]  
 
Draft New Recommendation G.666 (version 2.1) (ex G.PMDC) (for consent)     Editor Rec. G.666   Q7/15   2005-05-13
[ 69-WP2 ]  
 
Report of correspondence on maximum spectral excursion for G.dapp     Spectral excursion correspondence coordinator   Q6/15   2005-05-13
[ 68-WP2 ]  
 
Application parameters under consideration for the next version of G.693     Editor Rec. G.693   Q6/15   2005-05-13
[ 67-WP2 ]  
 
Status Report for Q8/15     Rapporteur Q8/15   Q8/15   2005-05-13
[ 66-WP2 ]  
 
Proposal of new Recommendation     Rapporteur Q8/15   Q8/15   2005-05-13
[ 65-WP2 ]  
 
Draft agenda for Q.8/15 meeting     Rapporteur Q8/15   Q8/15   2005-05-13
[ 64-WP2 ]  
 
New study items for optical fibre submarine cable systems     Rapporteur Q8/15   Q8/15   2005-05-13
[ 63-WP2 ]  
 
Proposed revised text for G.664 related to APR for Raman systems     Editor Rec. G.664   Q6/15   2005-05-13
[ 62-WP2 ]  
 
Proposed text on alternative measurement at BER=10-6 for G.sup39     Correspondence Group Leader   Q6/15   2005-05-13
[ 61-WP2 ]  
 
Agenda for the Q10/15 experts meeting     Rapporteur Q10/15   Q10/15   2005-05-12
[ 60-WP2 ]  
 
Application parameters for G.959.1 version 2.0     Editor Rec. G.959.1   Q6/15   2005-05-11
[ 59-WP2 ]  
 
Proposal for Section 9 of Sup.dsnsub     Editor Rec. G.Sup.dsnsub   Q8/15   2005-05-11
[ 58-WP2 ]  
 
Q6/15 Guideline for managing a set of measurements in a Correspondence Group     Chairman WP2/15   Q6/15   2005-05-10
[ 57-WP2 ]  
 
Agenda for Question 5/15     Rapporteur Q5/15   Q5/15   2005-05-06
[ 56-WP2 ]  
 
LS - Request for liaison and documents     Convener of IEC SC86C/WG1   Q5/15   2005-05-03
[ 55-WP2 ]  
(Rev.1) 
LS - Highlights of the April, 2005 IEC SC86A working group meetings     Liaison Officer for IEC SC86A   Q10/15, Q5/15   2005-05-03
[ 54-WP2 ]  
 
LS - Report of the highlights of the February 2005 meeting of SG6     ITU-T SG6 Liaison Officer   Q10/15, Q5/15   2005-05-03
[ 53-WP2 ]  
 
Draft Recommendation G.Sup.dsnsub     Editor Rec. G.Sup.dsnsub   Q8/15   2005-05-02
[ 52-WP2 ]  
 
Draft New Recommendation G.otf-version 0.2     Editor Rec. G.otf   Q6/15   2005-05-02
[ 51-WP2 ]  
 
Draft structure of new Recommendation G.650.3     Editor Rec. G.650.3   Q5/15   2005-05-02
[ 50-WP2 ]  
 
Draft Revised Recommendation G.959.1 version 8.3     Editor Rec. G.959.1   Q6/15   2005-05-01
[ 49-WP2 ]  
 
Report of the Q6/15 Rapporteur Group meeting (Vimercate, 15-18 March 2005)     Rapporteur Q6/15   Q6/15   2005-05-01
[ 48-WP2 ]  
 
Report of Question 7/15 Experts meeting (Vimercate, Italy, 14-18 March 2005)     Rapporteur Q7/15   Q7/15   2005-04-21
[ 47-WP2 ]  
 
LS from OIF: OIF's EDC and MLM projects     OIF   Q6/15   2005-02-22
[ 46-WP2 ]  
 
LS from ITU-T SG6: Relationship and liaison between SG6 (Q9/6) and SG15 (Q7/15)     ITU-T SG6   Q7/15   2005-02-14
[ 45-WP2 ]  
 
WITHDRAWN  
Old Q7/15 transferred to SG 16
 
N/A   Q7/15   2005-01-21
[ 44-WP2 ]  
 
WP 2/15 Agenda     Chairman WP2/15   Q10/15, Q8/15, Q7/15, Q6/15, Q5/15   2005-04-12
Resultats:56 documents
Résultats :   -  1 - 2  -  Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-9-23