Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP7B : Contributions : 293 Ajoutés récemment -  Recherche de documents de réunion
   
[293]  Report of the meeting of Working Party 7B (Geneva, 6-13 May 2014)

Format

Taille

Mise à disposition

English

Word  

64927 octets 2014-05-16 [293] Annex 11- Proposed preliminary draft new Recommendation ITU-R SA.[SRS/FSS 37 GHz] - Frequency sharing between SRS and FSS (space-to-earth) systems in the 37.5-38 GHz band

Word  

50446 octets 2014-05-19 [293] Annex 10- Clarification of the definition of space research service (deep space) in Radio Regulations

Word  

54707 octets 2014-05-19 [293] Annex 09- A note to Chairman of Study Group 7 - Protection of SRS earth stations from aircraft stations in the 2 200-2 290 MHz band

Word  

182412 octets 2014-05-14 [293] Annex 08- Preliminary draft new Recommendation ITU-R SA.[SRS-AIRCRAFT 2 GHZ] - Protection of SRS earth stations from mobile (aircraft) stations in the 2 200-2 290 MHz band

Word  

138789 octets 2014-05-19 [293] Annex 07- Preliminary draft new Report ITU-R SA.[NANO/PICOSAT CURRENT PRACTICE] - Current practice and procedures for notifying space networks currently applicable to nanosatellites and picosatellites

Word  

78386 octets 2014-05-19 [293] Annex 06- Preliminary draft new Report ITU-R SA.[NANO/PICOSAT Characteristics] - Characteristics, definitions and spectrum requirements of nanosatellites and picosatellites, as well as systems composed of such satellites

Word  

58190 octets 2014-05-21 [293] Annex 05- Draft CPM text on WRC-15 agenda item 9.1, issue 9.1.8

Word  

58423 octets 2014-05-21 [293] Annex 04- Draft CPM text on WRC-15 agenda item 1.13

Word  

223617 octets 2014-05-19 [293] Annex 03- Working document toward a preliminary draft new Report - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies and for conducting sharing studies

Word  

2491359 octets 2014-05-20 [293] Annex 02- Preliminary draft new Report ITU-R SA.[EESS-SPACE-7GHZ] - Compatibility between EESS (Earth-to-space) and the space research service or the space operation service in the band 7 100-7 235 MHz

Word  

125507 octets 2014-05-21 [293] Annex 01- Draft CPM Report, Chapter 2 on WRC-15 agenda item 1.11

Word  

84745 octets 2014-05-26 [293] - Report on the May 2014 meeting of Working Party 7B with a view to its next meeting (October 2014) (Geneva, 6-13 May 2014)
 

Document :

UIT-R WP7B  Contribution  293

Titre :

Report of the meeting of Working Party 7B (Geneva, 6-13 May 2014)

Reçu le :

2014-05-13

Source :

Chairman, WP 7B

Disponibilité :

Réservé aux utilisateurs TIES [UIT-R]

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2014-06-20