Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 295 ]
|
Contribution to the preliminary draft new Report addressing coexistence between different IMT systems in the UHF band
|
Nigeria (Federal Republic of)
|
|
2013-07-03 |
|
[ 294 ]
|
Work on Agenda item 1.2
|
ECOWAS
,
Cameroon (Republic of)
|
|
2013-07-03 |
|
[ 293 ]
|
Revision of the working document towards a preliminary draft revision of Report ITU-R M.2039-2
|
Telefon AB - LM Ericsson
|
|
2013-07-03 |
|
[ 292 ]
|
Revision of the working document towards a preliminary draft new Report ITU-R M.[IMT.ANTENNA]
|
Telefon AB - LM Ericsson
|
|
2013-07-03 |
|
[ 291 ]
|
Proposed parameters for IMT networks in the 5-6 GHz range to be used in sharing studies for Agenda item 1.1
|
Telefon AB - LM Ericsson
|
|
2013-07-03 |
|
[ 290 ]
|
Parameters for sectoral antenna pattern approximations in Recomendation ITU-R F.1336-3
|
Telefon AB - LM Ericsson
|
|
2013-07-03 |
|
[ 289 ]
|
Reducing the number of proposed channelling options for the 700 MHz frequency band in Region 1
|
Angola (Republic of)
,
Botswana (Republic of)
,
Democratic Republic of the Congo
,
Lesotho (Kingdom of)
,
Malawi
,
Mozambique (Republic of)
,
Namibia (Republic of)
,
South Africa (Republic of)
,
Swaziland (Kingdom of)
|
|
2013-07-03 |
|
[ 288 ]
|
Preferred frequency arrangement for the 700 MHz band
|
Orange
|
|
2013-07-03 |
|
[ 287 ]
|
Technical suitability of bands above 6 GHz for IMT under Agenda item 1.1
|
GSM Association
|
|
2013-07-03 |
|
[ 286 ]
|
Proposed deployment parameters for IMT networks to be used in compatibility/sharing studies for Agenda item 1.1
|
GSM Association
|
|
2013-07-03 |
|
[ 285 ]
|
Scope of the compatibility study for the coexistence between different IMT systems in the UHF band
|
Orange
|
|
2013-07-03 |
|
[ 284 ]
|
LTE & LTE-A system parameters for sharing study
|
Orange
|
|
2013-07-03 |
|
[ 283 ]
|
The use of frequencies inbands in ranges above 10 GHz for future mobile broadband communications systems - Study on IMT vision for 2020 and beyond
|
Nokia Siemens Networks Oy
,
Nokia Corporation
|
|
2013-07-03 |
|
[ 282 ]
|
Proposal to extend the terrestrial channelling arrangements for IMT in the 2.1 GHs band
|
Egypt (Arab Republic of)
|
|
2013-07-03 |
|
[ 281 ]
|
Proposals on the channelling arrangements of the 700 MHz band in Region 1, under Agenda item 1.2 of WRC-15
|
United Arab Emirates
|
|
2013-07-03 |
|
[ 280 ]
|
Proposals for answers to questions regarding IMT spectrum requirement and frequency arrangement
|
United Arab Emirates
|
|
2013-07-03 |
|
[ 279 ]
|
Proposed changes to working document on compiled elements to be included in a reply liaison statement to liaise information to Joint Task Group 4-5-6-7 on spectrum requirements (Document 5D/300 Attachment 4.3): Aspects of coverage, capacity, performance, asymmetry and spectrum efficiency
|
United Kingdom of Great Britain and Northern Ireland
|
|
2013-07-03 |
|
[ 278 ]
|
Proposed changes to working document to liaise information to Joint Task Group 4-5-6-7 on spectrum requirements as set out in Resolution 233 (Document 5D/300 Attachment 4.2)
|
United Kingdom of Great Britain and Northern Ireland
|
|
2013-07-03 |
|
[ 277 ]
|
Mobile spectrum requirementss in the UK
|
United Kingdom of Great Britain and Northern Ireland
|
|
2013-07-03 |
|
[ 276 ]
|
IMT base station antenna height for sharing study
|
France
|
|
2013-07-03 |
|
[ 275 ]
|
WRC-15 Agenda item 1.2 : Proposals for frequency arrangements
|
France
|
|
2013-07-03 |
|
[ 274 ]
|
Base station antenna heights for IMT-Advanced systems for use in studies in bands below 1 GHz under WRC-15 Agenda item 1.1
|
United Kingdom of Great Britain and Northern Ireland
|
|
2013-07-03 |
|
[ 273 ]
|
Comments on the working document towards a preliminary draft new Report[IMT.BROAD.PPDR]
|
United Kingdom of Great Britain and Northern Ireland
|
|
2013-07-03 |
|
[ 272 ]
|
Proposed revisions to the working document towards a preliminary draft new Report ITU-R M.[IMT.VISION] - "Framework and overall objectives of the future development of IMT for 2020 and beyond"
|
Alcatel-Lucent France
,
Alcatel-Lucent USA Inc.
|
|
2013-07-03 |
|
[ 271 ]
|
Proposed revisions to the working document towards a preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS] - "Future technology trends of terrestrial IMT systems"
|
Alcatel-Lucent France
,
Alcatel-Lucent USA Inc.
|
|
2013-07-03 |
|
[ 270 ]
|
Proposed liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1
|
Korea (Republic of)
|
|
2013-07-03 |
|
[ 269 ]
|
Proposed liaison statement to Joint Task Group 4-5-6-7 on spectrum requirement for performance
|
Korea (Republic of)
|
|
2013-07-03 |
|
[ 268 ]
|
Further information on technical feasibility of IMT in the bands above 6 GHz
|
Korea (Republic of)
|
|
2013-07-03 |
|
[ 267 ]
|
Initial sharing studies between fixed service and mobile service in the band 27-29.5 GHz
|
Korea (Republic of)
|
|
2013-07-03 |
|
[ 266 ]
|
Proposal on future IMT vision
|
Korea (Republic of)
,
Japan
|
|
2013-07-03 |
|
[ 265 ]
|
Proposed text for the working document towards future technology trends of IMT systems
|
Korea (Republic of)
|
|
2013-07-03 |
|
[ 264 ]
|
Proposal on a working document towards a Handbook on "Global trends in IMT" - [IMT.HANDBOOK]
|
Korea (Republic of)
,
Japan
|
|
2013-07-03 |
|
[ 263 ]
|
Reply liaison statement - Parameters for LTE-Advanced and WirelessMAN-Advanced
for use in sharing studies
|
WiMAX Forum
|
|
2013-07-03 |
|
[ 262 ]
|
Working document towards a preliminary draft revision of Report ITU-R M.2039-2
|
WiMAX Forum
|
|
2013-07-03 |
|
[ 261 ]
|
Answer to liaison statement to external organizations engaged in Recommendation ITU-R M.1457 related to revision of Recommendations ITU-R M.1580-4 AND ITU-R M.1581-4
|
Alcatel-Lucent France
,
Alcatel-Lucent Shanghai Bell
,
Alcatel-Lucent USA Inc.
,
AT&T, Inc.
,
Hitachi Ltd
,
Huawei Technologies Co. Ltd.
,
Motorola Mobility LLC
,
NTT DoCoMo, Inc.
,
Telecom Italia S.p.A.
|
|
2013-07-03 |
|
[ 260 ]
|
Technical and operational aspects of passive and activer base station antennas for IMT systems
|
Alcatel-Lucent France
,
Alcatel-Lucent Shanghai Bell
,
Alcatel-Lucent USA Inc.
,
AT&T, Inc.
,
Hitachi, Ltd.
,
Huawei Technologies Co. Ltd.
,
NTT DoCoMo, Inc.
,
Telecom Italia S.p.A.
,
Telefon AB - LM Ericsson
|
|
2013-07-03 |
|
[ 259 ]
|
System design information and dynamic data measurements of operating characteristics for a commercial IMT mobile broadband system in consideration of sharing study parameters
|
AT&T, Inc.
|
|
2013-07-03 |
|
[ 258 ]
|
Proposed texts and modification to working document towards a Handbook on "Global trends in IMT", [IMT.HANDBOOK]
|
Japan
|
|
2013-07-03 |
|
[ 257 ]
|
Proposals on further work for future IMT vision
|
Japan
|
|
2013-07-03 |
|
[ 256 ]
|
Proposal on deployment-related parameters for sharing studies to be conducted by Joint Task Group 4-5-6-7 under WRC-15 Agenda item 1.1
|
Japan
|
|
2013-07-03 |
|
[ 255 ]
|
Proposed liaison statement to JTG 4-5-6-7 on spectrum requirements for WRC-15 Agenda item 1.1
|
Japan
|
|
2013-07-03 |
|
[ 254 ]
|
Proposal on the revision of Recommendation ITU-R M.1579-1
|
Japan
|
|
2013-07-03 |
|
[ 253 ]
|
Reconsideration on developing a new Recommendation for IMT-Advanced OOBE characteristics
|
Japan
|
|
2013-07-03 |
|
[ 252 ]
|
Input towards further development of preliminary draft new Recommendation ITU-R M.[IMT.VISION]
|
Intel Corporation
,
Samsung Electronics Co., Ltd.
|
|
2013-07-02 |
|
[ 251 ]
|
Proposals on text for the preliminary draft new Recommendation ITU-R M.[IMT.VISION]
|
China (People's Republic of)
|
|
2013-07-02 |
|
[ 250 ]
|
Proposals on Annex for the preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS]
|
Huawei Technologies Co. Ltd.
|
|
2013-07-02 |
|
[ 249 ]
|
Proposals on text for the preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS]
|
China (People's Republic of)
|
|
2013-07-02 |
|
[ 248 ]
|
Proposal on PDNReport ITU-R M.[IMT.SMALL CELL]
|
China (People's Republic of)
|
|
2013-07-02 |
|
[ 247 ]
|
Further clarification on small cell
|
Huawei Technologies Co. Ltd.
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
|
|
2013-07-02 |
|
[ 246 ]
|
Consideration on handling of national spectrum requirements towards the liaison statement for JTG 4-5-6-7 on WRC-15 Agenda item 1.1
|
China (People's Republic of)
|
|
2013-07-02 |
Resultats:694 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):