Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 112 ]
+Ann.1-8 |
Report on the tenth meeting of Working Party 5C (Geneva, 5 - 14 November 2012)
|
Chairman, WP 5C
|
|
2012-11-14 |
|
[ 111 ]
|
Final List of Participants, ITU-R Working Party 5C, Geneva, 5 - 14 November 2012
|
Director, BR
|
|
2012-11-14 |
|
[ 110 ]
|
Assignment of a document submitted to Study Group 5 - Activities of Correspondence Group 3K3 concerning Recommendation ITU-R P.528-3 and propagation model IF-77
|
Chairman, SG 5
|
|
2012-11-12 |
|
[ 109 ]
|
Liaison statement to Working Party 5B (copy for information to Working Parties 1B, 3M, 5C, 7B, 7D) - Information on amateur service systems at 77.5-78 GHz for use in sharing studies for WRC-15 Agenda item 1.18
|
WP 5A
|
|
2012-11-12 |
|
[ 108 ]
(Rev.1) |
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems
|
WP 5B
|
|
2012-11-09 |
|
[ 107 ]
|
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)
|
WP 5B
|
|
2012-11-09 |
|
[ 106 ]
|
List of documents issued (Documents 5C/47 - 5C/106)
|
BR Study Groups Department
|
|
2012-11-02 |
|
[ 105 ]
|
Liaison statement to Working Party 5A with copy to Working Parties 5C, 5D and 1B on further studies on cognitive radio systems (CRS)
|
WP 6A
|
|
2012-11-02 |
|
[ 104 ]
|
Liaison statement to Working Party 3K (copy to JTG 4-5-6-7, Working Parties 5A, 5C and 5D for information) on the correlation of short-term interfering signals
|
WP 6A
|
|
2012-11-02 |
|
[ 103 ]
|
Proposed working document towards a preliminary draft new Report ITU-R F.[FS/RADAR COEXISTENCE IN 71-86 GHZ] and proposed draft liaison statement to Working Party 5A and Working Party 5B - Coexistence between fixed service operating in 71-76 GHz and 81-86 GHz and vehicular collision avoidance radar operating in the bands 76-77 GHz and 77-81 GHz
|
Canada
|
|
2012-10-29 |
|
[ 102 ]
|
Proposed liaison statement to Working Parties 4A and 4C - Fixed service characteristics, protection criteria for WRC-15 Agenda item 1.9.1, 1.9.2 and 1.10
|
France
,
Germany (Federal Republic of)
,
Ireland
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
|
|
2012-10-29 |
|
[ 101 ]
|
Draft revisions of Recommendations ITU-R F.1247-2, ITU-R F.1249-2 and ITU-R F.1509-1
|
Japan
|
|
2012-10-29 |
|
[ 100 ]
|
Working document towards a preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
Japan
|
|
2012-10-29 |
|
[ 99 ]
|
Applicability of the sectoral antenna reference patterns in Recommendation ITU-R F.1336-3 to the frequency range below 1 GHz
|
Japan
|
242-1/5
|
2012-10-29 |
|
[ 98 ]
|
Proposals for draft revision of Recommendations ITU-R F.383-8, ITU-R F.635-6 and ITU-R F.1099-4 and consequential updating of Recommendation ITU-R F.746-10
|
Japan
|
247-1/5
|
2012-10-29 |
|
[ 97 ]
|
Review of certain SF-series Recommendations
|
Japan
|
|
2012-10-29 |
|
[ 96 ]
|
Proposed revision of Recommendation ITU-R F.557-4 and editorial updates of certain F-Series Recommendations
|
Japan
|
|
2012-10-29 |
|
[ 95 ]
|
Working document towards a preliminary draft new Report ITU-R SA.[EESS-FS-7GHz] - Sharing between the EESS (Earth to-space) and the fixed service in the 7-8 GHz range
|
France
,
European Space Agency
|
|
2012-10-28 |
|
[ 94 ]
|
Working document towards a preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
Canada
|
|
2012-10-18 |
|
[ 93 ]
|
Preliminary draft new Report ITU-R F.[HF-NETWORK RELIABILITY] - Reliability calculations for adaptive HF fixed service network
|
Canada
|
|
2012-10-18 |
|
[ 92 ]
|
Preliminary draft revision of Recommendation ITU-R F.339-7 - Bandwidths, signal-to-noise ratios and fading allowances in HF fixed and land mobile radiocommunication systems
|
Canada
|
|
2012-10-18 |
|
[ 91 ]
|
Liaison statement to ITU-D Study Group 2, ITU-T Study Group 13 Question 15/13 and ITU-R Working Parties 4B and 5C - Appointment of Sub-Working Group Handbook Chairman and work progress
|
WP 5D
|
|
2012-10-16 |
|
[ 90 ]
|
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1
|
WP 5D
|
|
2012-10-16 |
|
[ 89 ]
|
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1
|
WP 5D
|
|
2012-10-16 |
|
[ 88 ]
|
Liaison statement to Working Parties 5A and 5C - Applicability of the sectoral antenna pattern approximations in Recommendation ITU-R F.1336-3 to the frequency range below 1 GHz
|
WP 5D
|
|
2012-10-16 |
|
[ 87 ]
|
Note to Study Group 5 (copy for information to WPs 5A, 5B and 5C) - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications
|
WP 5D
|
|
2012-10-16 |
|
[ 86 ]
|
Liaison statement to Working Party 5B - (copy to WPs 5A and 5C for information) - WRC-15 Agenda item 1.15
|
WP 5D
|
|
2012-10-15 |
|
[ 85 ]
|
Reply liaison statement to Working Party 5C - Characteristics of and protection criteria for stations operating in the fixed service in the frequency bands 8 700-8 750 MHz and 10 000-10 500 MHz
|
WP 7C
|
|
2012-10-15 |
|
[ 84 ]
|
Progress report of Joint Correspondence Group Activity
|
Chairman, JCG 5A/5C
|
|
2012-10-15 |
|
[ 83 ]
|
US comments on cross-border coordination Handbook (Document 5A-5C/4)
|
United States of America
|
|
2012-10-06 |
|
[ 82 ]
|
Liaison statement to ITU-R Working Parties 5A and 5C - Sharing the 7-8 GHz band between proposed EESS (Earth-to-space) under WRC-15 Agenda item 1.11 and existing terrestrial services
|
WP 7B
|
|
2012-10-05 |
|
[ 81 ]
|
Liaison statement to Working Party 5C - Protection criteria and modelling for WRC-15 Agenda item 1.13
|
WP 7B
|
|
2012-10-05 |
|
[ 80 ]
|
Liaison statement to Working Parties 5A and 5C (for action) and Working Parties 4C, 5B, 7A, 7B, 7C and 7D (for information) - WRC-15 Agenda item 1.8
|
WP 4A
|
|
2012-10-05 |
|
[ 79 ]
|
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B, 7C and 7D (copy to Working Parties 3M and 6B for information) - WRC-15 Agenda item 1.6
|
WP 4A
|
|
2012-10-05 |
|
[ 78 ]
|
Liaison statement to Study Group 5 and note to the Director, Radiocommunication Bureau - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications
|
SG 4
|
|
2012-10-04 |
|
[ 77 ]
|
Liaison statement to Working Party 5C - Fixed service characteristics and criteria in relation with WRC-15 Agenda item 1.9.1
|
WP 4A
|
|
2012-10-03 |
|
[ 76 ]
|
Progress of the studies in response to ITU-R Resolutions
|
Chairman, SG 5
|
|
2012-09-24 |
|
[ 75 ]
|
Liaison statement to Working Parties 3M, 5A, 5C, 7B - WRC-15 Agenda item 1.9.1
|
WP 4A
|
|
2012-09-24 |
|
[ 74 ]
|
Liaison statement to Working Parties 5A, 5C and 5D - Working document towards a preliminary draft new Report ITU-R M.[RDSS & MSS COORD]
|
WP 4C
|
|
2012-09-19 |
|
[ 73 ]
|
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 Agenda item 1.10
|
WP 4C
|
|
2012-09-18 |
|
[ 72 ]
|
Liaison statement to Working Party 5C - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda items 1.9.2 and 1.10
|
WP 4C
|
|
2012-09-17 |
|
[ 71 ]
|
Liaison statement to Working Parties 4A, 5A, 5C, 7B (copy for information to Working Parties 3M, 4B, 5B) - WRC-15 Agenda item 1.9.2
|
WP 4C
|
|
2012-09-14 |
|
[ 70 ]
|
Proposal on the arrangement of ITU-R Recommendations of the "M"-series
|
Russian Federation
|
|
2012-08-29 |
|
[ 69 ]
|
Draft revision of Recommendation ITU-R F.749-3 - Radio-frequency arrangements for systems of the fixed service operating in sub-bands in the 36-40.5 GHz band
|
Iran (Islamic Republic of)
|
|
2012-08-27 |
|
[ 68 ]
|
Liaison statement to ITU-D Study Group 2, ITU-T Study Group 13 Question 15/13 and ITU-R Working Party 4B and Working Party 5C
|
WP 5D
|
|
2012-07-23 |
|
[ 67 ]
|
Results of the 19th RAG meeting
|
Chairman, SG 5
|
|
2012-07-03 |
|
[ 66 ]
|
Liaison statement to Working Parties 6A and 5C - Future revision of Recommendation ITU-R P.842
|
WP 3L
|
|
2012-07-02 |
|
[ 65 ]
(Rev.1) |
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and Joint Task Group 4-5-6-7 - Handbook on ITU-R propagation prediction methods for interference and sharing studies
|
WP 3M
|
|
2012-06-29 |
|
[ 64 ]
|
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS)
|
WPs 1A and 1B
|
|
2012-06-25 |
|
[ 63 ]
|
Liaison statement to Working Parties 5A, 5C and 5D - WRC-15 Agenda item 9.1, issue 9.1.6
|
WP 1B
|
|
2012-06-22 |
Resultats:437 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):