Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 312 ]
|
Liaison statement to ITU-T Study Group 15 and CENELEC (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference
|
WP 1A
|
|
2014-06-20 |
|
[ 311 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
|
WP 1B
|
|
2014-06-19 |
|
[ 310 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
|
WP 1A
|
|
2014-06-19 |
|
[ 309 ]
|
Liaison statement to Working Party 5B (copy for information to Working Parties 5A and 5C) - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
|
WP 1C
|
240/5
|
2014-06-17 |
|
[ 308 ]
|
Liaison statement to Working Parties 5B and 5C (copy for information to Working Party 3L) - WRC-15 agenda item 1.4 - Status of studies and draft CPM text for WRC-15 agenda item 1.4
|
WP 5A
|
|
2014-06-04 |
|
[ 307 ]
|
Liaison statement to Working Party 4C (copied for information to Working Parties 3M, 4A, 4B, 5C, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
|
WP 5A
|
|
2014-06-03 |
|
[ 306 ]
|
Liaison statement to ITU-T FG Innovation, TSAG and Study Group 17 (copy for information to ITU-R Study Group 5, Working Parties 5B, 5C and 5D) - New standardization activities for the International Telecommunication Union - Standardization Sector (ITU-T)
|
WP 5A
|
|
2014-06-03 |
|
[ 305 ]
|
Liaison statement on coexistence of wired telecommunications with radiocommunication systems (reply to COM5-LS45)
|
ITU-T SG 9
|
|
2014-06-02 |
|
[ 304 ]
|
Liaison statement on additional information on regional regulations related to coexistence of wired telecommunication with radiocommunication systems
|
ITU-T SG 9
|
|
2014-06-02 |
|
[ 303 ]
|
Liaison statement to Working Parties 1A, 5A, 5C and 5D regarding development of a Report on out-of-band emissions in the 2 700-2 900 MHz frequency band from service operating below 2 690 MHz
|
WP 5B
|
|
2014-05-30 |
|
[ 302 ]
|
Reply liaison statement to Working Party 5C - Potential impact to the fixed service from automotive collision avoidance radar in adjacent frequency bands 76-77 GHz and 77-81 GHz
|
WP 5B
|
|
2014-05-30 |
|
[ 301 ]
|
Liaison statement to Working Party 1B (copied to Working Parties 5B, 5C and 5D for information) - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
|
WP 5A
|
|
2014-05-30 |
|
[ 300 ]
|
Liaison statement to ITU-T Study Groups 5, 9, 15 and ITU-R Working Party 1A (copied for information to ITU-R Working Parties 5A, 5C, 5D and 6A) - Liaison statement on coexistence of wired telecommunications with radiocommunication systems
|
WP 5B
|
|
2014-05-30 |
|
[ 299 ]
|
Liaison statement to Working Party 1B (copied for information to ITU-R Working Parties 5A, 5C and 5D) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
|
WP 5B
|
|
2014-05-30 |
|
[ 298 ]
+Ann.1-9 |
Report of the thirteenth meeting of Working Party 5C (Geneva, 19-28 May 2014)
|
Chairman, WP 5C
|
|
2014-05-28 |
|
[ 297 ]
|
Final list of participants - Working Party 5C (Geneva, 19-28 May 2014)
|
Director, BR
|
|
2014-05-28 |
|
[ 296 ]
|
Liaison statement on Recommendation ITU-R F.1105-3 (Fixed wireless systems for disaster mitigation and relief operations)
|
ITU-T FG DR&NRR
|
|
2014-05-26 |
|
[ 295 ]
|
Reply liaison statement - Potential impact to the fixed service from automotive collision avoidance radar in adjacent frequency bands 76-77 GHz and 77-81 GHz
|
WP 5A
|
|
2014-05-23 |
|
[ 294 ]
|
List of documents issued (Documents 5C/235 - 5C/294)
|
BR Study Groups Department
|
|
2014-05-16 |
|
[ 293 ]
|
Liaison statement to Working Party 5C (WRC-15 agenda item 1.12) - Sharing studies between the earth exploration-satellite service (active) and the fixed service in the frequency bands 8 700-8 750 MHz and 10 000-10 500 MHz
|
WP 7C
|
|
2014-05-15 |
|
[ 292 ]
|
Reply liaison statement to Working Party 5C - Revisions of Recommendations ITU-R F.1247-3, ITU-R F.1249-3 and ITU-R F.1509-2
|
WP 7B
|
|
2014-05-13 |
|
[ 291 ]
|
Reply liaison statement to Working Party 5C - Proposed revision to Recommendation ITU-R SA.1154 - Updating of characteristics of current digital ENG systems and their usage/deployment
|
WP 7B
|
|
2014-05-13 |
|
[ 290 ]
|
Satellite component of the VDES for agenda item 1.16 (WRC-15)
|
France
,
European Space Agency
|
|
2014-05-12 |
|
[ 289 ]
|
Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
Japan
|
|
2014-05-12 |
|
[ 288 ]
|
Proposed revision of working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial [mobile] broadband systems
|
Japan
|
253/5, 247/5
|
2014-05-12 |
|
[ 287 ]
|
Proposed revision of working document towards preliminary draft new Recommendation ITU-R F.[FS DEPLOY] - Deployment scenarios of point-to-point systems in the fixed service
|
Japan
|
252/5
|
2014-05-12 |
|
[ 286 ]
|
Working document toward a preliminary draft new Report ITU-R F.[FS USE-TRENDS]
|
Viet Nam (Socialist Republic of)
|
|
2014-05-12 |
|
[ 285 ]
|
Report on the Correspondence Group on fixed service use and future trends - Fixed service use and future trends
|
Chairman, CG FS-trends
|
|
2014-05-12 |
|
[ 284 ]
|
Comments for inclusion in a liaison statement to Working Party 4A regarding WRC-15 agenda item 1.8
|
United States of America
|
|
2014-05-09 |
|
[ 283 ]
|
Proposed draft reply liaison statement to Working Party 5B WRC-15 agenda item 1.17
|
United States of America
|
|
2014-05-09 |
|
[ 282 ]
|
Proposed revisions to working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB]
|
United States of America
|
|
2014-05-09 |
|
[ 281 ]
|
Proposed revisions to preliminary draft new Report ITU-R F.[FS USE-TRENDS], "Fixed service use and future trends"
|
United States of America
|
|
2014-05-09 |
|
[ 280 ]
|
Statistical information on point-to-point fixed service deployment in Poland
|
Orange Polska S.A.
,
Poland (Republic of)
|
|
2014-05-09 |
|
[ 279 ]
|
Progress Report of Joint Correspondence Group Activity
|
Chairman, JCG 5A/5C
|
|
2014-05-08 |
|
[ 278 ]
|
Review of the Study Group 5 Questions assigned to the Working Parties
|
Chairman, SG 5
|
|
2014-05-08 |
|
[ 277 ]
|
Studies on WRC-15 agenda item 1.16 in particular a compatibility with fixed service for which 160 MHz band is allocated on a primary basis
|
Russian Federation
|
|
2014-05-08 |
|
[ 276 ]
|
Preliminary draft revision Report ITU-R F.2108 - "Fixed service system parameters for different frequency bands"
|
Russian Federation
|
|
2014-05-08 |
|
[ 275 ]
|
Proposed supplement towards Handbook on frequency-adaptive communication systems and networks in the MF/HF bands
|
China (People's Republic of)
|
|
2014-05-07 |
|
[ 274 ]
|
Guidance on studies related to fixed point-to-point wireless systems used in packet-based networks
|
Canada
|
|
2014-05-06 |
|
[ 273 ]
|
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5C, 5D, ITU-T Study Group 15 Question 1 and ITU-T Study Group 13 Question 15 - Access technology for broadband telecommunications including IMT, for developing countries
|
ITU-D SG 2
|
|
2014-04-29 |
|
[ 272 ]
|
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan
|
ITU-T SG 15
|
|
2014-04-22 |
|
[ 271 ]
|
Liaison statement on considerations on wired telecommunication systems being developed under G.fast
|
ITU-T SG 15
|
|
2014-04-22 |
|
[ 270 ]
|
Liaison statement on development of a draft new Report ITU-R F.[FS.IMT/BB]
|
ITU-T SG 15
|
|
2014-04-17 |
|
[ 269 ]
|
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4B, 4C, 5A, 5C and 5D) - Development of draft new Recommendation on main functionalities of consumer receivers for worldwide broadcasting roaming
|
WP 6A
|
|
2014-04-11 |
|
[ 268 ]
|
Liaison statement to Working Party 1A - Copy to Working Parties 1C, 5A, 5B, 5C and ITU-T Study Group 5 - Recommendations ITU-T K.60 and K.mhn - Coexistence of wired and wireless communication systems
|
WP 6A
|
|
2014-04-10 |
|
[ 267 ]
|
Liaison statement to Working Party 5A (copy for information to Working Parties 5C and 5D) - The use of mobile broadband networks for Electronic news gathering (ENG) applications in the mobile service
|
WP 6A
|
|
2014-04-10 |
|
[ 266 ]
|
Liaison statement on fixed service backhaul networks for IMT and other terrestrial mobile broadband systems
|
ITU-T SG 13
|
|
2014-04-07 |
|
[ 265 ]
|
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10
|
WP 4C
|
|
2014-03-24 |
|
[ 264 ]
|
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5B, 5C and 7B - WRC-15 agenda item 1.9.2
|
WP 4C
|
|
2014-03-24 |
|
[ 263 ]
|
Liaison statement to Working Party 5C - Studies to assist coordination between RDSS and MSS and the fixed service in the 2 483.5-2 500 MHz band
|
WP 4C
|
|
2014-03-07 |
Resultats:437 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):