Contributions
Numéro
Titre
Source
AI/Question
Filtre...
101/5
101-4/5
136/9
141-1/5
17/15
202/9
202-3/3
205/5
205/8
205-4/5
209-3/5
212/5
212-2/8
212-3/5
214-3/3
215/5
221/1
221-1/1
225-5/3
229/8
229-2/5
230-2/5
232/7
238/5
238/8
238-1/5
238-1/8
240/5
241/5
241/8
241-1/5
250/5
282/5
7-6/5
89/6
Effacer filtre
Date
[ 245 ]
Proposed revision to working document towards a preliminary draft new Report ITU-R M.[LMS.PPDR.VHF/UHF TECH]
China (People's Republic of)
2009-05-11
[ 244 ]
Information to assist the work of WRC-11 Agenda item 1.23
China (People's Republic of)
2009-05-11
[ 243 ]
On the revision of Report ITU-R M.2116 and the parameters to be used in sharing studies for the IEEE 802.16E technology
WiMAX Forum
2009-05-08
[ 242 ]
Response to the liaison statement on preliminary BWA characteristics for use in compatibility studies with fixed-satellite service systems in the 3 400-4 200 MHz band, and initial comments on the related preliminary draft new Report
WiMAX Forum
2009-05-08
[ 241 ]
Progression of the working document towards a preliminary draft new Report on cognitive radio systems in the land mobile service
Canada
141-1/5
2009-05-07
[ 240 ]
Proposed revisions to Recommendation ITU-R M.1452 - Millimetre wave radiocommunication systems for ITS Applications
Canada
205-4/5
2009-05-07
[ 239 ]
Progression of the working document towards a preliminary draft new Recommendation "Performance and availability requirements and objectives for wireless access systems"
Canada
101-4/5
2009-05-07
[ 238 ]
Proposed reply liaison to Working Party 5B - Mobile services use of the 138-144 and 154-156 MHz bands related to WRC-11 Agenda item 1.14
Canada
2009-05-07
[ 237 ]
Working document towards draft CPM text - WRC-11 Agenda item 1.23
Canada
2009-05-07
[ 236 ]
Proposed draft liaison statement to Working Party 5B on studies related to WRC-11 Agenda item 1.23
Canada
2009-05-07
[ 235 ]
Liaison statement to relevant ITU-R and ITU-T Study Groups and the ITU Coordination Committee for Vocabulary (CCV) regarding draft list of terminology on emergency telecommunications
ITU-D SG2
2009-05-07
[ 234 ]
Analysis of WARC-79, WRC-95 and WRC-97 decisions related to the coordination procedure of frequency assignments for a station of fixed and land mobile services
Russian Federation
2009-05-06
[ 233 ]
Proposals for modification of preliminary draft new Recommendation
ITU-R M.[LMS.PPDR.UHF]
Russian Federation
2009-05-06
[ 232 ]
Analysis of possible protection criteria of land mobile service in accordance with WRC-11 Agenda item 1.14
Russian Federation
2009-05-06
[ 231 ]
Response to liaison statement received from ITU-R Working Party 5A requesting input for a revision of Recommendation ITU-R M.1801
ETSI
2009-05-05
[ 230 ]
ITU-R Study Group 4 Question to be brought to the attention of Study Groups 5 and 7
BR Study Group Department
2009-05-04
[ 229 ]
Preliminary draft revision of Recommendation ITU-R M.1801
Director BR
2009-04-29
[ 228 ]
Liaison statement to Coordination Committee for Vocabulary (CCV), Working Parties 4A, 4A, 5A and 5C - Proposed definitions for "integrated MSS system" and "hybrid satellite/terrestrial system"
WP 4B
2009-04-28
[ 227 ]
Response to liaison to external organizations - Request for input for a revision of Recommendation ITU-R M.1801
Alliance for Telecommunications Industry Solutions
2009-04-27
[ 226 ]
Response to liaison to external organizations - Invitation for contributions on the proposed draft new Report ITU-R M.[LMS.PPDR.UHF TECH]
Alliance for Telecommunications Industry Solutions
2009-04-27
[ 225 ]
Clarification of the responsibility for the work on land mobile systems below 3 MHz
Chairmen, WP 5A and WP 5C
2009-04-24
[ 224 ]
Liaison statement - Draft ITU-T Recommendation on requirements for land mobile alerting broadcast capabilities for civic purposes
ITU-T SG 2
2009-04-15
[ 223 ]
Results from the second meeting of Study Group 5 (10-11 November 2008) of interest to Working Party 5A
Chairman, WP 5A
2009-04-14
[ 222 ]
Liaison statement on leading role of SG 2 on service definition
ITU-T SG 2
2009-04-08
[ 221 ]
Broadcast wireless access characteristics for compatibility studies with fixed-satellite service systems in the 3 400-4 200 MHz band
Director, BR
2009-04-09
[ 220 ]
Preliminary draft new Question ITU-R [AM-TEMP OP] - Amateur service temporary operation in other countries
International Amateur Radio Union (IARU)
2009-04-08
[ 219 ]
ITU-R Study Group 6 Question to be brought to the attention of Study Group 5
BR Study Group Department
2009-04-06
[ 218 ]
Report of the Correspondence Group activity on cognitive radio systems
Convenor, WP 5A CG on CRS
2009-04-03
[ 217 ]
Information on activities and output documents of ITU-T Focus Group ICTs & CC
Chairman ITU-T FG ICTs & CC
2009-04-02
[ 216 ]
Outdated references in the ITU-R Recommendations dealing with maritime and radiodetermination issues
Director, BR
2009-04-01
[ 215 ]
Reply to liaison statement on performance and availability requirements and objectives for wireless access systems
ITU-T SG 12
2009-03-27
[ 214 ]
Response to liaison statement from Working Party 5A on invitation for contributions on the proposed draft new Report ITU-R M.[LMS.PPDR/UHF.TECH]
IEEE
2009-03-24
[ 213 ]
Draft revision of Recommendation ITU-R M.1801
IEEE
238-1/5
2009-03-24
[ 212 ]
Response to liaison statement from Working Party 5A on BWA characteristics for use in compatibility studies with fixed-satellite service systems in the 3 400-4 200 MHz band
IEEE
2009-03-24
[ 211 ]
Revision of Recommendation ITU-R M.1450-3
IEEE
238/5 , 212/5
2009-03-21
[ 210 ]
Liaison statement to Radiocommunication Study Groups and Working Parties
Chairman, CCV
2009-03-20
[ 209 ]
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 6A, 7C, 7D (copy to WPs 5C, 5D, 6C and 7B for information) on the study of software-defined radio and cognitive radio systems
WP 1B
2009-03-19
[ 208 ]
Reply liaison statement - The study of mobile access systems providing radiocommunications to a large number of ubiquitous sensors and/or actuators scattered over wide areas
WP 1B
2009-03-18
[ 207 ]
Liaison statement - Progress on WRC-11 Agenda item 1.11 - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz
WP 7B
2009-03-18
[ 206 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 6A, 7C and 7D on WRC-11 Agenda item 1.22
WP 1A
2009-03-17
[ 205 ]
Liaison statement to Working Parties 5A and 5B - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
WP 1A
2009-03-17
[ 204 ]
Liaison statement to Working Parties 4A and 5C (copy to Working Party 5A for information) - Draft CPM text on WRC-11 Agenda item 1.12
WP 7B
2009-03-17
[ 203 ]
Liaison statement (copy to Working Parties 3M, 5A and 5C for information) - Study of in-band sharing and adjacent band protection of HIBLEO-2 type non-GSO-to-non-GSO inter-satellite links from the emissions of SRS earth stations in the 23 GHz band
WP 7B
2009-03-17
[ 202 ]
Liaison statement (copy to Working Parties 5A and 5B for information) - Draft CPM text on WRC-11 Agenda item 1.24
WP 7B
2009-03-17
[ 201 ]
Result of the Study Group 5 meeting in relation to Document 5/114 proposing the texts for scopes of certain Recommendations
Chairman, SG 5
2009-03-11
[ 200 ]
ITU-R Study Group 7 Recommendation to be brought to the attention of Study Group 5
BR Study Group Department
2009-03-10
[ 199 ]
Liaison statement to Working Party 5B (Copy to Working Parties 5A and 6A for information) -
IMT parameters in the 790-862 MHz frequency band
WP 5D
2009-03-10
[ 198 ]
Liaison statement to WP 4A (copy to WP 5A) - Methodologies for determining whether an IMT station could transmit in the band 3 400-3 600 MHz without exceeding the PFD limits in Nos. 5.430A, 5.432A, 5.432B and 5.433A of the Radio Regulations
WP 5D
2009-03-10
[ 197 ]
Liaison statement to Working Party 5A - Update of Report ITU-R M.2039
WP 5D
2009-03-10
[ 196 ]
Liaison statement to Working Parties 5A and 5C - Copy to Working Party 5B for information -
Use of Recommendation ITU-R F.1336-2 for the 790 862 MHz band
WP 5D
2009-03-10
Resultats:795 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16
- Suivant
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):