Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP1B : Contributions : 307 Ajoutés récemment -  Recherche de documents de réunion
   
[307]  Report of the 6th meeting of Working Party 1B (Geneva, 25 May - 1 June 2011)

Format

Taille

Mise à disposition

English

Word  

56077 octets 2011-06-22 [307] Annex 13- Preliminary draft revision of Recommendation ITU-R SM.1413-2 - Radiocommunication Data Dictionary (RDD)

Word  

61330 octets 2011-06-22 [307] Annex 12- Liaison statement to the International Standardization Organization and International Electrotechnical Commission (ISO/IEC JTC 1/SC 31) on a preliminary draft new Report ITU-R SM.[RFID] on Technical characteristics, standards, and frequency bands of opera

Word  

60065 octets 2011-06-22 [307] Annex 11- Liaison statement to ITU-T Study Groups 13, 16 and 17 on a preliminary draft new Report ITU-R SM.[RFID] on Technical characteristics, standards, and frequency bands of operation for RFID and potential harmonization opportunities

Word  

59517 octets 2011-06-22 [307] Annex 10- Reply liaison statement to ITU-T JCA-IOT on ITU-R involvement in JCA-IOT with regard to studies on short-range devices (SRDs) which include RFIDs

Word  

60678 octets 2011-06-14 [307] Annex 09- Correspondence Group on narrow-band wireless home networking - Terms of reference

Word  

61256 octets 2011-06-22 [307] Annex 08- Terms of reference for the correspondence Group on the revision of ITU Handbook on "National spectrum management"

Word  

62718 octets 2011-06-22 [307] Annex 07- Correspondence Group on the development of a preliminary draft new Report ITU-R SM.[MAJOR_EVENTS] on spectrum management and monitoring during major events - Terms of Reference

Word  

74541 octets 2011-06-09 [307] Annex 06- Review of ITU-R Recommendations, Reports, Questions, Handbook and ITU-R Resolutions assigned to WP 1B

Word  

3195793 octets 2011-06-09 [307] Annex 05- Working document towards a preliminary draft new Report ITU-R SM.[RES.951] - Studies on enhancing the international regulatory framework in relation to Resolution 951 (Rev. WRC-07)

Word  

201956 octets 2011-06-09 [307] Annex 04- Preliminary draft new Report ITU-R SM.[RFID] - Technical characteristics, standards, and frequency bands of operation for RFID and potential harmonization opportunities

Word  

127979 octets 2011-06-08 [307] Annex 03- Preliminary draft revision of Recommendation ITU-R SM.1370-1 - Design guidelines for developing advanced automated spectrum management systems

Word  

89455 octets 2011-06-10 [307] Annex 02- Preliminary draft revision of Recommendation ITU-R SM.1603 - Spectrum redeployment as a method of national spectrum management

Word  

62629 octets 2011-06-03 [307] Annex 01- Preliminary draft revision of Recommendation ITU-R SM.1047-1 - National spectrum management

Word  

83746 octets 2011-07-01 [307] - Report on the sixth meeting of Working Party 1B (Geneva, 25 May - 1 June 2011)
 

Document :

UIT-R WP1B  Contribution  307

Titre :

Report of the 6th meeting of Working Party 1B (Geneva, 25 May - 1 June 2011)

Reçu le :

2011-06-01

Source :

Chairman, WP 1B

Disponibilité :

Réservé aux utilisateurs TIES [UIT-R]

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2011-07-04