Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : SC : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R SC  C 

UIT-R SC

Commission spéciale

Resultats:47 documents
Contributions  Documents / Contributions
 
Numéro 
Titre Source Date
[ 47 ]  
+Ann.1 
Report on the meeting of the Special Committee (Geneva, 1-5 November 2010)     Chairman, SC   2010-11-05
[ 46 ]  
 
Final List of Participants - Special Committee (Geneva, 1-5 November 2010)     Director, BR   2010-11-05
[ 45 ]  
 
List of documents issued     BR Study Group Department   2010-10-29
[ 44 ]  
 
WRC-12 Agenda item 7 - Suspension period in Appendix 30/30A     Luxembourg   2010-10-25
[ 43 ]  
 
WRC-12 Agenda item 7 - Proposed draft CPM Text on bringing into use of assignments to geostationary satellite networks in certain radio services and frequency bands     France   2010-10-25
[ 42 ]  
 
WRC-12 Agenda item 8.1.2 - Editorial corrections to the Radio Regulations     France   2010-10-25
[ 41 ]  
 
WRC-12 Agenda item 7 - Proposed draft CPM Text on the review of the bands listed in Table 5-1 of Appendix 5 for Nos. 9.11 and 9.19     France   2010-10-25
[ 40 ]  
 
WRC-12 Agenda item 7 - Proposed draft CPM text on comments under Nos. 9.51 and 9.52 as applied to coordination under No. 9.7 of the Radio Regulations (RR)     France   2010-10-25
[ 39 ]  
 
WRC-12 Agenda item 7 - Proposed draft CPM Text on the list of satellite networks with which coordination needs to be effected (application of No. 9.36 of the Radio Regulations)     France   2010-10-25
[ 38 ]  
 
WRC-12 Agenda item 7 - Proposed draft CPM text on API of a satellite network or system not subject to coordination procedure under Section II of Article 9 of the Radio Regulations     France   2010-10-25
[ 37 ]  
 
WRC-12 Agenda item 7 - Proposed draft CPM Text on addition in Appendix 4 of the Radio Regulations of data elements about occurrence of transmissions of a non-geostationary satellite network     France   2010-10-25
[ 36 ]  
 
Proposed draft text on regulatory and procedural matters regarding sharing between BSS receiving earth stations and transmitting stations in fixed and mobile services under WRC-12 Agenda item 1.13     Japan   2010-10-25
[ 35 ]  
 
Proposed draft text on regulatory and procedural consideration in relation to WRC-12 Agenda item 1.25 (Section 5/1.25/6.2 of the draft CPM Report)     Japan   2010-10-25
[ 34 ]  
 
Consideration of the issue C of Agenda item 7 - Application of the coordination ARC trigger and of RR No. 9.41 in the GSO/GSO FSS coordination under RR No. 9.7 in the frequency bands 6/4 GHz and 14/10/11/12 GHz - (WRC-12 Agenda item 7)     Japan   2010-10-25
[ 33 ]  
 
WRC-12 Agenda item 7 - Bringing into use of assignments to satellite networks     United Kingdom of Great Britain and Northern Ireland   2010-10-25
[ 32 ]  
 
AsiaSat views and proposals on the application of Nos. 11.41 and 11.42 (provisional/definitive recording of frequency assignments)     Asia Satellite Telecommunications Co. Ltd.   2010-10-25
[ 31 ]  
 
List of satellite networks with which coordination needs to be effected (Application of No. 9.36 of the Radio Regulations)     Asia Satellite Telecommunications Co. Ltd.   2010-10-25
[ 30 ]  
 
Regulatory elements for draft CPM Text for WRC-12 Agenda item 1.25     United Arab Emirates   2010-10-25
[ 29 ]  
 
The proposal on steerable beams (Annex 2 to Appendix 4 of the Radio Regulations)     China (People's Republic of)   2010-10-25
[ 28 ]  
 
The proposal on antenna gain contour covering area beyond submitted service area (Annex 2 to Appendix 4 of the Radio Regulations)     China (People's Republic of)   2010-10-25
[ 27 ]  
 
Considerations on addition of an indicator about occurrence of transmissions of a non-GSO satellite network in Appendix 4 of the Radio Regulations     China (People's Republic of)   2010-10-25
[ 26 ]  
 
Considerations on application of Nos. 11.41 and 11.42 of the Radio Regulations (provisional/definitive recording of frequency assignments)     China (People's Republic of)   2010-10-25
[ 25 ]  
 
Identification of satellite networks with which a newly submitted satellite network has to effect coordination     United States of America   2010-10-23
[ 24 ]  
 
Application of Nos. 9.51 and 9.52 with respect to coordination under No. 9.7     United States of America   2010-10-23
[ 23 ]  
 
Draft CPM Text on WRC-12 Agenda item 7 - The application of Nos. 11.41, 11.42 and 11.43C to Space Services Frequency Assignments     United States of America   2010-10-23
[ 22 ]  
 
Additional considerations related to the review of the bands listed in Table 5-1 of Appendix 5 of the Radio Regulations for Nos. 9.11 and 9.19     United States of America   2010-10-23
[ 21 ]  
 
Draft CPM Text on WRC-12 Agenda item 1.7 - Analyses of draft "Methods to satisfy the Agenda item"     United States of America   2010-10-23
[ 20 ]  
 
Draft CPM text on WRC-12 Agenda item 7 - Interim procedures for notification and recording of complementary ground components of integrated MSS systems in the 1 525-1 559 MHz and 1 626.5-1 660.5 MHz bands     United States of America   2010-10-23
[ 19 ]  
 
Draft CPM Text on WRC-12 Agenda item 4     United States of America   2010-10-23
[ 18 ]  
 
Draft CPM text on WRC-12 Agenda item 1.7 - Example regulatory text to provide for a new Resolution to develop an agreed methodology to determine AMS(R)S spectrum requirements     United States of America   2010-10-23
[ 17 ]  
 
Modification of Section 5/1.25/6 of the draft CPM Report ot provide example regulatory text for Agenda item 1.25     United States of America   2010-10-23
[ 16 ]  
 
WRC-12 Agenda item 8.1.2 - Radio Regulations inconsistency related to MSS     Canada   2010-10-22
[ 15 ]  
 
WRC-12 Agenda item 1.18 - Modification of Section 5/1.18/6 of the draft CPM Report     Canada   2010-10-22
[ 14 ]  
 
Draft CPM text on WRC-12 Agenda item 1.7 - Proposed modifications to Section 5/1.7/6.4 of the draft CPM Report     Canada   2010-10-22
[ 13 ]  
 
WRC-12 Agenda item 1.16 - Section 4/1.16/6 of the draft CPM Report     Canada   2010-10-22
[ 12 ]  
 
WRC-12 Agenda item 1.6 Resolution 950 (Rev.WRC-07) - Proposal regarding section 4/1.6/1.6 of the draft CPM Report     Canada   2010-10-22
[ 11 ]  
 
WRC-12 Agenda item 1.2 - Clarification regarding sections 6/1.2/6.1.3 and 6/1.2/6.2.2 of the draft CPM Report     Canada   2010-10-22
[ 10 ]  
 
Comments on some issues identified by the Working Party of the Special Committee - Issue Application of No 11.41 and No. 11.42 (Provisional/definitive recording of frequency assignments)     Korea (Republic of)   2010-10-22
[ 9 ]  
 
Revision of draft CPM text for Agenda item 1.13     Korea (Republic of)   2010-10-22
[ 8 ]  
 
Liaison statement to the Special Committee - Compatibility between the space research service (Earth-to space) and fixed service systems in the band 22.55-23.15 GHz     WP 7B   2010-10-15
[ 7 ]  
 
Draft correction of the draft Resolutions [C113-TECHN PARAMS] and [E113-GUARANTEED ACCESS] of the draft CPM Report     Russian Federation   2010-10-13
[ 6 ]  
(Rev.1) 
Application of RR Nos. 11.41 and 11.42 in respect of satellite networks     Norway   2010-09-16
[ 5 ]  
 
Liaison statement to the Special Committee - List of satellite networks identified under RR No. 9.36.2 (WRC-12 Agenda item 7)     WP 4A   2010-07-26
[ 4 ]  
 
Extraits du projet de Rapport de la RPC qui seront examint'es par la Commissions spécilae chargée d'examiner les questions réglementaires et de procédure     BR Study Group Department   2010-07-26
[ 3 ]  
 
Rapport analytique de la première et de la deuxième réunion du Groupe de travail de la Commission spéciale chargée d'examiner les questions réglementaires et de procédure (Genève, 25-28 novembre 2008 et 9-11 décembre 2009)     Chairman, SC-WP   2010-05-21
[ 2 ]  
 
Liaison statement to the Special Committee - Points taken into account in the context of the studies associated with WRC-12 Agenda item 1.17     Chairman, Joint Task Group 5-6   2010-05-19
[ 1 ]  
 
Liaison statement to Study Group 4 and the Special Committee on Regulatory and Procedural Matters on Resolution 80 (Rev.WRC-07)     Director, Radiocommunication Bureau   2008-03-14
Resultats:47 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2008-03-18