Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 92 ]
|
Liaison statement from ITU-D Study Group 2 to the next meeting of ITU-R Radiocommunication Advisory Group (RAG) and to ITU-R Study Group 1 Working Party 1A (31 October - 4 November 2005)
|
ITU-D SG 2
|
|
2005-09-27 |
|
[ 91 ]
|
List of documents issued
|
BR Study Group Department
|
|
2005-09-23 |
|
[ 90 ]
|
Text for revision of Recommendation ITU-R SM.337-4 - Frequency and distance separations
|
Korea (Republic of)
|
|
2005-09-22 |
|
[ 89 ]
|
Proposal of deletion of Question ITU-R Q.211/1 (1997)
|
France
|
|
2005-09-16 |
|
[ 88 ]
|
Proposal of Revision SM.1235 (1997)
|
France
|
|
2005-09-16 |
|
[ 87 ]
|
Proposal of suppression of Recommendation SM. 669-1 (1993)
|
France
|
|
2005-09-16 |
|
[ 86 ]
|
Proposed amendments of Recommendation ITU-R SM.328-10 - Spectra and bandwidth of emissions
|
Korea (Republic of)
|
76/1
|
2005-09-19 |
|
[ 85 ]
|
Proposal of activation of the SG 1 Group of Redaction
|
SG 1 Rapporteur to the CCV
|
|
2005-09-19 |
|
[ 84 ]
|
Impact of high-speed data rate telecommunication systems using electrical power lines on broadcasting receivers and other systems
|
Brazil (Federative Republic of)
|
|
2005-09-20 |
|
[ 83 ]
|
Draft revision to working document toward a preliminary draft Report on the consideration of the use of frequencies between 275 and 3 000 GHz
|
United States of America
|
|
2005-09-20 |
|
[ 82 ]
|
Energy problems and prevention of global warming (Question ITU-R 210/1)
|
Japan Aerospace Exploration Agency (JAXA)
|
210/1
|
2005-09-16 |
|
[ 81 ]
|
Proposal of the extension regardin gthe termination year of Question ITU-R 210/1 to 2010 from 2005 - A response to Question ITU-R 210/1 and interference analyses between SSPS in the ISM bands and existing radio services
|
Japan Aerospace Exploration Agency (JAXA)
|
210/1
|
2005-09-16 |
|
[ 80 ]
|
Liaison statement to Working Parties 1A, 4A and 8D - Comments regarding the use of the OOB domain masks in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1/9 (Agenda item 1.20)
|
TG 1/9
|
|
2005-09-19 |
|
[ 79 ]
|
ITU-R SM. Series Recommendations under responsibility of WP 1A
|
France
|
|
2005-08-02 |
|
[ 78 ]
|
Questions assigned to Study Group 1 and corresponding ITU-R SM.series Recommendation in force
|
France
|
|
2005-08-02 |
|
[ 77 ]
|
Joint Rapporteur Group - Report of the Second Meeting, May 24-26, 2004
|
JRG 1A-1C-8B
|
|
2005-07-28 |
|
[ 76 ]
|
Proposed amendments to Recommendation ITU-R SM.328-10 - Spectra and bandwidth of emissions
|
Russian Federation
|
|
2005-07-27 |
|
[ 75 ]
|
Liaison statement to Working Parties 1A, 7D, 8A, 8B and 9D
|
IPG
|
|
2005-07-22 |
|
[ 74 ]
|
Liaison statement to Working Party 1A (Copy to study Group 7) - Bands above 275 GHz
|
WP 8A
|
|
2005-05-16 |
|
[ 73 ]
|
Liaison statement to Working Party 1A - Protection criteria for fixed service systems below 30 MHz from high data rate telecommunication systems using electricity power supply distribution wiring
|
WP 9C
|
221/1
|
2005-05-16 |
|
[ 72 ]
|
Liaison statement to Working Parties 1A, 1B, 4A, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and to Task Groups 1/8 and 1/9, and Joint Task Group 6-8-9 - Revision of Recommendation ITU-R F.1336
|
WP 9D
|
|
2005-05-02 |
|
[ 71 ]
|
Draft Revision of Recommendation ITU-R BS.1660-1 - Technical basis for planning of terrestrial digital sound broadcasting in the VHF band
|
WP 6E
|
56/6
|
2005-04-29 |
|
[ 70 ]
|
Liaison statement to Working Party 1A - Protection requirements of broadcasting systems against interference caused by wired telecommunication systems, using an electric power supply
|
WP 6E
|
32/6
|
2005-04-21 |
|
[ 69 ]
|
Liaison statement to WP 1A - Proposal of OoB domain emission limits for ISDB-T system to be included in Recommendation ITU-R SM.1541-1, Annex 6
|
WP 6E
|
|
2005-04-12 |
|
[ 68 ]
|
Liaison statement to WPs 1A, 3L and 6E - Impact of cable and power line telecommunications systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 7D
|
221/1
|
2005-03-29 |
|
[ 67 ]
|
Reply to liaison statement to WP 1A and copy to WP 3L for information - Impact of cable and power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 6E
|
|
2004-11-24 |
|
[ 66 ]
|
Reply to liaison statement from WP 1A concerning draft revision of Recommendation ITU-R SM.1541-Annex 7
|
WP 6E
|
|
2004-11-23 |
|
[ 65 ]
|
Liaison statement to WP 1A - Impact of cable and power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 3L
|
|
2004-11-16 |
|
[ 64 ]
|
Liaison statement to WP 1A - Recommendations ITU-R P.620 and ITU-R SM.1448
|
WP 3M
|
|
2004-11-09 |
|
[ 63 ]
|
Liaison statement to WP 1A - Bandwidth measurement at monitoring stations
|
WP 1C
|
|
2004-10-18 |
|
[ 62 ]
+Ann.1-15 |
Chairman's report on the meeting of Working Party 1A, Geneva, 11-14 October 2004
|
Chairman, WP 1A
|
|
2004-10-15 |
|
[ 61 ]
|
Final list of Participants
|
Director, BR
|
|
2004-10-14 |
|
[ 60 ]
|
List of documents issued
|
BR Study Group Department
|
|
2004-10-08 |
|
[ 59 ]
|
Liaison statement to WP 1A - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distributing wiring
|
WP 7A
|
|
2004-10-06 |
|
[ 58 ]
|
Liaison statement - Information on radio astronomy activities between 275 and 3 000 GHz
|
WP 7D
|
|
2004-10-05 |
|
[ 57 ]
|
Liaison statement to Working Party 1A - Assessment of compatibility between radio astronomy stations and high data rate power-line communication systems
|
WP 7D
|
221/1, 218/1
|
2004-10-04 |
|
[ 56 ]
|
Liaison statement to Working Party 1A - Bands above 3 000 GHz
|
WP 7D
|
|
2004-10-04 |
|
[ 55 ]
|
Liaison statement to Working Party 1A - Methodology for protection of the fixed service from interference caused by high data rate communications using the electricity supply wiring
|
WP 9C
|
|
2004-10-04 |
|
[ 54 ]
|
Levels of unwanted emissions from mobile-satellite service feeder links near 1.4 GHz
|
United States of America
|
|
2004-10-04 |
|
[ 53 ]
|
Present status of wireless power transmission toward space experiments
|
JAXA
|
210/1
|
2004-10-01 |
|
[ 52 ]
|
Information from the 2004 CISPR meeting
|
France
|
|
2004-09-23 |
|
[ 51 ]
|
Note to the Chairman of Working Party 1A - Request for studies
|
Chairman, SG 1
|
|
2004-09-21 |
|
[ 50 ]
|
Proposed modifications to the Chairman's Report of the 2003 meeting of Working Party 1A, Annex 21, preliminary draft revision of Recommendation ITU-R SM.328-10 "Spectra and bandwidth of emissions"
|
United States of America
|
|
2004-09-10 |
|
[ 49 ]
|
Report on the first meeting of JRG 1A-1C-8B (13-15 July 2004)
|
Rapporteur, 1A-1C-8B
|
|
2004-08-04 |
|
[ 48 ]
|
Definition of the spectral properties of transmitter emissions
|
Russian Federation
|
222/1
|
2004-06-23 |
|
[ 47 ]
|
Reply to the liaison statement from WP 1A concerning draft revision of Recommendation ITU-R SM.1541 - Annex 7
|
WP 6E
|
|
2004-05-13 |
|
[ 46 ]
|
Reply to the liaison statement from WP 1A requesting technical characteristics on broadcast receivers, antenna types and gain
|
WP 6E
|
|
2004-05-13 |
|
[ 45 ]
|
Liaison statement to Working Parties 1A and 8D - Unwanted emission control for feeder links of the mobile-satellite service in bands near 1.4 GHz
|
WP 4A
|
|
2004-05-04 |
|
[ 44 ]
|
Liaison statement to Working Party 1A - Bands above 275 GHz
|
WP 4A
|
|
2004-05-04 |
|
[ 43 ]
|
Reply to the liaison statement from WP 1B on the application of a uniform criterion for evaluating interference between radiocommunication systems, operating in shared frequency bands
|
WP 6S
|
|
2004-05-04 |
Resultats:167 documents Résultats :
Précédent -
1 -
2 -
3 -
4
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):