Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Resultados :30 documentos
Contribuciones  [ Origen: FiberHome Technologies Group ]  [ AI/Cuestión: Q9/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1738 ]  
 
Physical and logical node in G.MDSP     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1737 ]  
(Rev.1) 
ERP consideration in G.MDSP     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1736 ]  
 
Protection method for DNI scenario in G.mdsp     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1735 ]  
(Rev.1) 
Proposals for Interconnection use case in Appendix I of G.MDSP     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1689 ]  
 
Consideration of ERP Management in G.Sup52     FiberHome Technologies Group   Q9/15, Q14/15   2016-02-01
[ 1684 ]  
 
ERP Management Requirements of G.8032     FiberHome Technologies Group   Q9/15, Q14/15   2016-02-01
[ 1632 ]  
 
Proposal of initial a new standardization for Port-based protection in OTN network     Bharti Airtel Limited , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q9/15   2016-02-01
[ 1630 ]  
 
Proposal to restart working on G.8132 aligned with MPLS working group, IETF     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q9/15   2016-02-01
[ 1609 ]  
 
Proposals about centralized recovery for SDN controlled transport network     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1433 ]  
(Rev.1) 
Consideration on DNI fault scenarios in G.MDSP     FiberHome Technologies Group   Q9/15   2015-06-09
[ 1417 ]  
 
Proposals for the latest draft of G.mdsp     China Unicom , FiberHome Technologies Group   Q9/15   2015-06-09
[ 1387 ]  
 
Consideration Hybrid Interconnection in G.MDSP     FiberHome Technologies Group   Q9/15   2015-06-09
[ 1371 ]  
 
Consideration DNI architecture in G.MDSP     FiberHome Technologies Group   Q9/15   2015-06-09
[ 1368 ]  
 
Requirement analysis of optical layer protection in metro WDM networks     China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Q9/15   2015-06-09
[ 1013 ]  
 
Requirement of one to one and bidirectional switching protection of optical layer     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Q9/15   2014-11-11
[ 908 ]  
 
clarification of protected domain an protected subnetwork for G.MDSP     FiberHome Technologies Group   Q9/15   2014-11-10
[ 907 ]  
 
Recovery scenario consideration in G.msdp     FiberHome Technologies Group   Q9/15   2014-11-10
[ 906 ]  
 
Ethernet ring DNI function model for MDSP     FiberHome Technologies Group   Q9/15   2014-11-10
[ 905 ]  
(Rev.1) 
Considerations about vertical links between interconnected nodes     FiberHome Technologies Group   Q9/15   2014-11-10
[ 708 ]  
 
Proposal of starting a new work item or modify the existing recommendations on optical layer protection     China Unicom , FiberHome Technologies Group   Q9/15   2014-03-11
[ 570 ]  
(Rev.1) 
consideration of recovery network sinario in MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 569 ]  
 
Different switching types in each domain of MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 568 ]  
(Rev.1) 
Consideration of Network Objectives in the latest draft of G.mdsp     FiberHome Technologies Group   Q9/15   2014-03-10
[ 394 ]  
 
Selection of protection transport entities in m1 SMP architecture     FiberHome Technologies Group   Q9/15   2013-06-18
[ 393 ]  
 
Editorial suggestions for G.8131.1     FiberHome Technologies Group   Q9/15   2013-06-18
[ 390 ]  
 
Definition for Broadcast Bridge in G.8131.1     FiberHome Technologies Group   Q9/15   2013-06-18
[ 356 ]  
 
Modification of pre-emption principles in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 354 ]  
 
some editorial suggestions for G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 353 ]  
 
proposal text about network objective of configuration inconsistance in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 351 ]  
 
priority consideration for preemption in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
Resultados :30 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-28