Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Resultados :474 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Siguiente Next
Contribuciones  [ AI/Cuestión: Q13/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 720 ]  
 
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - use of all 1's for targetPortIdentity     Iometrix, Inc.   Q13/15   2014-03-11
[ 701 ]  
 
Transparent clock model of 1588 over OTN     ZTE Corporation , Ministry of Industry and Information Technology (MIIT)   Q13/15, Q11/15   2014-03-11
[ 700 ]  
 
Requirement of 1588 Transparent Clock function in OTN     China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15, Q11/15   2014-03-11
[ 699 ]  
 
Withdrawn by submitter     N/A (no se aplica)   Q13/15   2014-03-11
[ 687 ]  
 
Consideration for 1588 over OTN by ESC     Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-03-11
[ 686 ]  
 
Suggestions for time interface connection between OTN and Package Switching / Transport Network     Calnex Solutions Limited , China Unicom   Q13/15, Q11/15   2014-03-11
[ 685 ]  
 
Test and analysis about PTP over OTN by transparent mode     Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-03-11
[ 680 ]  
 
Considerations for PTP over OTN network     Ministry of Industry and Information Technology (MIIT) , China Telecommunications Corporation , China Unicom   Q13/15   2014-03-11
[ 660 ]  
 
G.8275.1: Frequency based ClockClasses for Option II and III networks     Alcatel-Lucent USA Inc.   Q13/15   2014-03-10
[ 647 ]  
 
PDV Templates for testing Partial-Timing Support     Microsemi   Q13/15   2014-03-10
[ 646 ]  
 
Key Performance Indices for APTSC     Microsemi   Q13/15   2014-03-10
[ 645 ]  
 
Explanations regarding Time-Stability Metrics     Ixia , Microsemi   Q13/15   2014-03-10
[ 644 ]  
 
Use of MATIE on Time Error     Ixia , Microsemi   Q13/15   2014-03-10
[ 643 ]  
 
G.8273.2: Measurement Appendix     Calnex Solutions Limited   Q13/15   2014-03-10
[ 642 ]  
 
Time Error Deviation (TEDEV)     Ixia , Microsemi   Q13/15   2014-03-10
[ 641 ]  
 
G.8273.2: Holdover     Calnex Solutions Limited   Q13/15   2014-03-10
[ 640 ]  
 
Maximum Absolute Average Time Error (MAATE)     Ixia , Microsemi   Q13/15   2014-03-10
[ 639 ]  
(Rev.1) 
Synchronization over OTN network     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-03-10
[ 638 ]  
 
Test error of PRTC of G.8272     Huawei Technologies Co. Ltd.   Q13/15   2014-03-10
[ 637 ]  
 
Proposals for G.8275.1     Huawei Technologies Co. Ltd.   Q13/15   2014-03-10
[ 636 ]  
(Rev.1) 
Effect of lower network limit on PTP slave clock     Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-03-10
[ 635 ]  
 
SyncE transient measurement method for G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-03-10
[ 634 ]  
 
Consideration of second-order filtering of T-BC for output transient due to SyncE rearrangement, plus several corrections for Appendix II/G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-03-10
[ 633 ]  
 
Physical layer frequency to PTP noise transfer gain peaking in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-03-10
[ 632 ]  
 
Initial Results for Dynamic Time Error MTIE and TDEV at G.8271.1 Reference Point C     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-03-10
[ 631 ]  
 
Proposal on 21 hops of G.8271.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2014-03-10
[ 627 ]  
 
G.8263 Appendix I - Flicker/gamma equation formatting fixes     Microsemi   Q13/15   2014-03-10
[ 626 ]  
 
G8263 Appendix I - TDEV illustrating flicker load     Microsemi   Q13/15   2014-03-10
[ 625 ]  
 
Two-way metric Offset Max     Microsemi   Q13/15   2014-03-10
[ 624 ]  
 
Framework for Temperature Performance     Microsemi   Q13/15   2014-03-10
[ 609 ]  
 
NE Phase/Time Synchronization Supply Management     Deutsche Telekom AG   Q14/15, Q13/15   2014-03-10
[ 601 ]  
 
T-BC Performance with/without SyncE [G.8273.2]     Vitesse Semiconductor Corporation   Q13/15   2014-03-10
[ 599 ]  
 
G.8273.2: T-TSC Specification     Calnex Solutions Limited   Q13/15   2014-03-10
[ 598 ]  
 
G.8273.2: 1pps Performance Requirements     Calnex Solutions Limited   Q13/15   2014-03-10
[ 597 ]  
 
G.8273.2: Noise Generation     Calnex Solutions Limited   Q13/15   2014-03-10
[ 596 ]  
 
G.8273 Annex A Equations     Calnex Solutions Limited   Q13/15   2014-03-10
[ 595 ]  
 
G.8271.1: MTIE Limit for Dynamic Time Error     Calnex Solutions Limited   Q13/15   2014-03-10
[ 594 ]  
 
G.8262: Jitter for Multilane, 40G and 100G Interfaces     Calnex Solutions Limited   Q13/15   2014-03-10
[ 593 ]  
 
G.8260: Definitions of Dynamic Time Error and Maximum Time Error     Calnex Solutions Limited   Q13/15   2014-03-10
[ 592 ]  
 
T-BC Time/phase noise generation [G.8273.2, G.8271.1]     Vitesse Semiconductor Corporation   Q13/15   2014-03-10
[ 586 ]  
 
Proposal for time synchronization requirements     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q2/15, Q13/15   2014-03-10
[ 556 ]  
 
Thermal Profiles for Telecom Equipment     Sprint Corporation , Rakon, UK   Q13/15   2014-03-10
[ 554 ]  
 
G.8271.2: SOAM Assisted Partial Timing Support     Sprint Corporation , ADVA, Israel   Q13/15   2014-03-10
[ 552 ]  
 
G.8271.2: Budget proposal for Assisted Partial Timing Support     Sprint Corporation , Calnex, UK   Q13/15   2014-03-10
[ 549 ]  
 
Assisted Partial Timing Support Clock     Sprint Corporation   Q13/15   2014-03-10
[ 525 ]  
 
G.8261 Synchronous Ethernet Network Jitter Specification beyond 10GE     Deutsche Telekom AG   Q13/15   2014-03-08
[ 524 ]  
 
G.8262 Synchronous Ethernet Equipment Jitter Specification beyond 10GE     Deutsche Telekom AG   Q13/15   2014-03-08
[ 519 ]  
 
Updates in the G.8271.1     Telefon AB - LM Ericsson   Q13/15   2014-03-08
[ 516 ]  
 
Timing Distribution with PTP-over-OTN Overhead Proposal     PMC-Sierra, Inc.   Q13/15, Q11/15   2014-03-08
[ 498 ]  
 
Clarification of clockClass table [G.8275.1]     Microsemi   Q13/15   2014-03-07
Resultados :474 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-26