Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Resultados :2210 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1838 ]  
 
G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission     Futurewei Technologies US R&D Center , Metanoia Technologies, Inc.   Q4/15   2016-02-02
[ 1837 ]  
 
Proposed definition and text for ODUCn GMP ?CnD CRC-9 overhead in G.709     Microsemi Corporation   Q11/15   2016-02-02
[ 1836 ]  
 
G.vlc: Proposed Dimming Control Scheme for Low-Speed VLC     Futurewei Technologies US R&D Center   Q18/15   2016-02-02
[ 1835 ]  
 
G.vlc: OOK for Indoor Low-Speed VLC     Futurewei Technologies US R&D Center   Q18/15   2016-02-02
[ 1834 ]  
 
G.vlc: On Optical Wireless Communication Channel Model     Futurewei Technologies US R&D Center   Q18/15   2016-02-02
[ 1833 ]  
 
G.vlc: OFDM with Dimming Control for High-Speed VLC     Futurewei Technologies US R&D Center   Q18/15   2016-02-02
[ 1832 ]  
 
G.vlc: OFDM for Indoor High-Speed VLC     Futurewei Technologies US R&D Center   Q18/15   2016-02-02
[ 1831 ]  
 
G.vlc: Multiple Asymmetrically Clipped Optical OFDM     Futurewei Technologies US R&D Center   Q18/15   2016-02-02
[ 1830 ]  
 
G.vlc: Feasibility of Specifying VLC as a Profile of G.hn Recommendations     Futurewei Technologies US R&D Center   Q18/15   2016-02-02
[ 1829 ]  
 
GPON Time Error Transfer performance and interface mapping     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2016-02-02
[ 1828 ]  
 
Transport / Access Time Phase HRM     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2016-02-02
[ 1827 ]  
 
Transmission of non-G.8275.1 PTP messages     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-02-02
[ 1826 ]  
 
Extended SSM message of OTN     Huawei Technologies Co., Ltd. , China Mobile Communications Corporation , Orange   Q13/15, Q11/15   2016-02-02
[ 1825 ]  
 
Frequency and phase/time Synchronization of partial scenario     Huawei Technologies Co., Ltd.   Q13/15   2016-02-02
[ 1824 ]  
 
PRTC+ MTIE and TDEV masks     Huawei Technologies Co., Ltd.   Q13/15   2016-02-02
[ 1823 ]  
 
New Simulation Results for RMS Frequency Offset for Transport of a CPRI Client over OTN     Huawei Technologies Co., Ltd.   Q13/15, Q11/15   2016-02-02
[ 1822 ]  
 
Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN - Computational Considerations     Huawei Technologies Co., Ltd.   Q13/15, Q11/15   2016-02-02
[ 1821 ]  
 
Consideration of CPRI clock transport over OTN     Huawei Technologies Co., Ltd.   Q13/15, Q11/15   2016-02-02
[ 1820 ]  
 
ToD protocol     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q13/15   2016-02-02
[ 1819 ]  
 
Wander Accumulation Simulation Results for Transport of a 1 GB Ethernet Client over B100G OTN based on Multiple Replications     Huawei Technologies Co., Ltd.   Q13/15   2016-02-02
[ 1818 ]  
 
10Mhz interface     Huawei Technologies Co., Ltd.   Q13/15   2016-02-02
[ 1817 ]  
 
G.fast: Reduction of number VF samples reporting formats     Broadcom Corporation , Sckipio Technologies S.I. Ltd.   Q4/15   2016-02-02
[ 1816 ]  
 
G.fast: Clarification on byte order in SOC and EOC messages.     Broadcom Corporation , Sckipio Technologies S.I. Ltd.   Q4/15   2016-02-02
[ 1815 ]  
 
OOC-PSD mask in NG-PON2     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2016-02-02
[ 1814 ]  
 
Proposal precautions for the use of GNSS receivers     Orange   Q13/15   2016-02-02
[ 1813 ]  
 
Observed GPS UTC information malfunction - for information     Orange   Q13/15   2016-02-02
[ 1812 ]  
 
G.fast: G.9701 test parameters text improvements     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1811 ]  
 
Proposal for G.654.E fibre     OFS Fitel, LLC   Q6/15, Q5/15   2016-02-02
[ 1810 ]  
 
G.fast: Various text updates to G.9701 Amd1 Low power mode     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1809 ]  
 
G.fast: Proposal to restrict upstream transmit power for 8dBm profile     Broadcom Corporation   Q4/15   2016-02-02
[ 1808 ]  
 
G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1807 ]  
 
G.vdsl: Mis-estimation of SNR during MEDLEY     Broadcom Corporation , Intel Corporation , Qualcomm, Inc.   Q4/15   2016-02-02
[ 1806 ]  
 
Future work on G.fast recommendations     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1805 ]  
 
G.fast, Editorial Correction to Figure Z-2.1     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1804 ]  
 
G.fast: G.fast XLOG test parameter     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1803 ]  
 
G.vlc: Modulations formats for G.vlc     Marvell Semiconductor Inc.   Q18/15   2016-02-02
[ 1802 ]  
 
G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1801 ]  
 
G.ploam, G.fast: Clarification on Unavailable State for corrigendum     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1800 ]  
 
G.ploam: Test parameter update time stamps in G.997.2 Amd1     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1799 ]  
 
G.fast, G.ploam: Corrigenda to G.9701 and G.997.2     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1798 ]  
 
G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1797 ]  
 
G.ploam: Missing lom failure in G.997.1     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1796 ]  
 
Considerations on the evolution of Module Framer and DSP Framer Interfaces (MFI/DFI)     Huawei Technologies Co., Ltd.   Q11/15   2016-02-02
[ 1795 ]  
 
G.hn: On the use of G.hn over twisted pair cables     Marvell Semiconductor Inc.   Q18/15   2016-02-02
[ 1794 ]  
 
Cascaded and nested protection     China Unicom , Huawei Technologies Co., Ltd.   Q9/15, Q11/15   2016-02-02
[ 1793 ]  
 
Optical Media SDN Control Dependencies     Xtera Communications, Inc.   Q14/15, Q12/15   2016-02-02
[ 1792 ]  
 
G.vector: Considerations about Multi-Vendor Vectoring standardization     Telecom Italia S.p.A.   Q4/15   2016-02-02
[ 1791 ]  
 
G.fast: On data rate reporting     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1790 ]  
 
Test result for multi-domain nested protection     China Unicom   Q9/15   2016-02-02
[ 1789 ]  
 
G.hn: Implementation on the agreements on centralized coordination of neighbouring domains     Marvell Semiconductor Inc.   Q18/15   2016-02-02
Resultados :2210 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2016-09-28