Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Resultados :2210 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1938 ]  
 
Additional SDN use case from ORCHESTRA Project     Telecom Italia S.p.A.   Q14/15, Q12/15   2016-09-02
[ 1937 ]  
 
Considerations on sync in fronthaul     Telefon AB - LM Ericsson   Q13/15   2016-09-02
[ 1936 ]  
 
SyncE Master ID (G.8264)     Telefon AB - LM Ericsson   Q13/15   2016-09-02
[ 1935 ]  
 
T-TSC Physical layer frequency to PTP noise transfer specification (G.8273.2)     Telefon AB - LM Ericsson   Q13/15   2016-09-02
[ 1934 ]  
 
Enhanced SyncE Network Limits (G.8261) and Clock (G.8262.1)     Telefon AB - LM Ericsson   Q13/15   2016-09-02
[ 1933 ]  
 
considerations about the wavelength plan of G.metro     ZTE Corporation   Q6/15   2016-09-02
[ 1932 ]  
 
Considerations on the EVM in the G.698.2     ZTE Corporation , CAICT , Ministry of Industry and Information Technology (MIIT)   Q6/15   2016-09-02
[ 1931 ]  
 
Need for all-optical inter-cloud and intra-cloud network architecture     Electronics and Telecommunications Research Institute (ETRI) , KT Corporation   Q12/15   2016-09-02
[ 1930 ]  
 
Starting with Sub-Lambda Photonic Switching Network (SLPSN) Standardization, definition of the scope     Electronics and Telecommunications Research Institute (ETRI) , KT Corporation , Orange   Q12/15   2016-09-02
[ 1929 ]  
 
Comments on draft G.8152 (clause 3 and 4)     Fujitsu Limited   Q3/15, Q14/15   2016-09-02
[ 1928 ]  
 
Some corrections to G.8121 series     Fujitsu Limited   Q10/15   2016-09-02
[ 1927 ]  
 
IaDI/IrDI in PTN (G.8012 and G.8112)     Fujitsu Limited   Q3/15, Q11/15, Q10/15   2016-09-02
[ 1926 ]  
 
Interface definition for OTN     Fujitsu Limited   Q12/15, Q11/15   2016-09-02
[ 1925 ]  
 
Modelling consideration on Alarm and Reporting for Notification     Fujitsu Limited   Q14/15   2016-09-02
[ 1924 ]  
 
Clarification for EMF     Fujitsu Limited   Q14/15   2016-09-02
[ 1923 ]  
 
Consideration on IaDI FlexO     KDDI Corporation   Q11/15   2016-09-02
[ 1922 ]  
 
Proposal for Multiservice G.RoF optical architecture and configuration  
Duplicate of C1967
 
Telekom Malaysia Berhad   Q2/15   2016-09-02
[ 1921 ]  
 
Physical Layer Implementation Guidance for "Open Line Systems"     Xtera Communications, Inc.   Q6/15   2016-09-01
[ 1920 ]  
 
Media Control Annex for G.cca     Xtera Communications, Inc.   Q14/15, Q12/15   2016-09-01
[ 1919 ]  
 
Impact of pilot tone and message channel on the payload in G.metro     ADVA Optical Networking   Q6/15   2016-09-01
[ 1918 ]  
 
Proposal to start a new project to specify CPRI over OTN phase 2     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-09-01
[ 1917 ]  
(Rev.1-2) 
CPRI over OTN phase II extension     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd. , Intel Corporation , IP Light , Xilinx Incorporation   Q11/15   2016-09-01
[ 1916 ]  
 
Use of a Persistency Filter in ODUk SNC/S Protected Domains     Alcatel-Lucent International   Q9/15   2016-09-01
[ 1915 ]  
 
100G/B100G multi-vendor FlexO based SOTUm interface family     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-09-01
[ 1914 ]  
 
Proposed corrections to Table 8-1/G.874 and 7-1/G.806     Huawei Technologies Co., Ltd.   Q14/15, Q11/15   2016-09-01
[ 1913 ]  
 
OTN connections and protected connections     Huawei Technologies Co., Ltd.   Q9/15, Q12/15, Q11/15   2016-09-01
[ 1912 ]  
 
Atomic function specification text proposal of FlexE     Huawei Technologies Co., Ltd.   Q11/15, Q10/15   2016-09-01
[ 1911 ]  
 
FlexE and xGE interoperability update     Huawei Technologies Co., Ltd.   Q11/15   2016-09-01
[ 1910 ]  
 
Atomic function specification text proposal of the interworking between ETCx and ETCflex     Huawei Technologies Co., Ltd.   Q11/15   2016-09-01
[ 1909 ]  
 
Atomic function specification text proposal of mapping a 64b/66b PCS coded signal into OPUflex     Huawei Technologies Co., Ltd.   Q11/15   2016-09-01
[ 1908 ]  
 
ETC Naming Proposal     Huawei Technologies Co., Ltd.   Q11/15, Q10/15   2016-09-01
[ 1907 ]  
 
Comments on the open issues with the ETY_TT description in G.8021     Huawei Technologies Co., Ltd.   Q11/15, Q10/15   2016-09-01
[ 1906 ]  
 
G.hn: Interoperability of different secure admission mechanisms     China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q18/15   2016-09-01
[ 1905 ]  
(Rev.1-2) 
Draft new Recommendation ITU-T L.osp     OFS Fitel, LLC   Q16/15   2016-08-31
[ 1904 ]  
(Rev.1) 
Proposed modifications to draft new Recommendation G.808     Coriant GmbH & Co. KG   Q9/15   2016-08-31
[ 1903 ]  
 
Proposed appendix to G.798 related to media layer protection     Coriant GmbH & Co. KG   Q11/15   2016-08-31
[ 1902 ]  
 
Proposed updates to G.873.1 Appendix III     Coriant GmbH & Co. KG   Q9/15   2016-08-31
[ 1901 ]  
 
Modelling media layer protection using the new G.872 model     Coriant GmbH & Co. KG   Q9/15, Q12/15, Q11/15   2016-08-31
[ 1900 ]  
 
Comments on Clause 8 of draft new Recommendation G.cca     Alcatel-Lucent USA Inc.   Q12/15   2016-08-31
[ 1899 ]  
 
Response on redundant model in TD549     Ciena Canada   Q13/15   2016-08-31
[ 1898 ]  
 
G.8263 Amd. 2 - Typos     Ciena Canada   Q13/15   2016-08-31
[ 1897 ]  
 
Comments on Clause 3 of draft new Recommendation G.cca     Alcatel-Lucent USA Inc.   Q12/15   2016-08-31
[ 1896 ]  
(Rev.1) 
G.8262.1 short term phase transient response for parameter C     Ciena Canada   Q13/15   2016-08-31
[ 1895 ]  
 
Proposed changes to Series G Supplement 41 for coherent systems     Ciena Canada   Q8/15   2016-08-31
[ 1894 ]  
 
Line System Specification Table for G.976     Ciena Canada   Q8/15   2016-08-31
[ 1893 ]  
 
Proposal to Define Open Cable Wet-Plants     Ciena Canada   Q8/15   2016-08-31
[ 1892 ]  
 
G.8275.2 - Deny of service requests     Integrated Device Technology (IDT)   Q13/15   2016-08-31
[ 1891 ]  
(Rev.1) 
G.8275.1 T-BC phase/time traceability information     Integrated Device Technology (IDT)   Q13/15   2016-08-31
[ 1890 ]  
 
G.cca - Comments on Clause 11     Ciena Canada   Q14/15, Q12/15   2016-08-31
[ 1889 ]  
 
G.cca - Comments on Clause 8.3     Ciena Canada   Q14/15, Q12/15   2016-08-31
Resultados :2210 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2016-09-28