Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 1938 ]
|
Additional SDN use case from ORCHESTRA Project
|
Telecom Italia S.p.A.
|
Q14/15, Q12/15
|
2016-09-02 |
|
[ 1937 ]
|
Considerations on sync in fronthaul
|
Telefon AB - LM Ericsson
|
Q13/15
|
2016-09-02 |
|
[ 1936 ]
|
SyncE Master ID (G.8264)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2016-09-02 |
|
[ 1935 ]
|
T-TSC Physical layer frequency to PTP noise transfer specification (G.8273.2)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2016-09-02 |
|
[ 1934 ]
|
Enhanced SyncE Network Limits (G.8261) and Clock (G.8262.1)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2016-09-02 |
|
[ 1933 ]
|
considerations about the wavelength plan of G.metro
|
ZTE Corporation
|
Q6/15
|
2016-09-02 |
|
[ 1932 ]
|
Considerations on the EVM in the G.698.2
|
ZTE Corporation
,
CAICT
,
Ministry of Industry and Information Technology (MIIT)
|
Q6/15
|
2016-09-02 |
|
[ 1931 ]
|
Need for all-optical inter-cloud and intra-cloud network architecture
|
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
|
Q12/15
|
2016-09-02 |
|
[ 1930 ]
|
Starting with Sub-Lambda Photonic Switching Network (SLPSN) Standardization, definition of the scope
|
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
,
Orange
|
Q12/15
|
2016-09-02 |
|
[ 1929 ]
|
Comments on draft G.8152 (clause 3 and 4)
|
Fujitsu Limited
|
Q3/15, Q14/15
|
2016-09-02 |
|
[ 1928 ]
|
Some corrections to G.8121 series
|
Fujitsu Limited
|
Q10/15
|
2016-09-02 |
|
[ 1927 ]
|
IaDI/IrDI in PTN (G.8012 and G.8112)
|
Fujitsu Limited
|
Q3/15, Q11/15, Q10/15
|
2016-09-02 |
|
[ 1926 ]
|
Interface definition for OTN
|
Fujitsu Limited
|
Q12/15, Q11/15
|
2016-09-02 |
|
[ 1925 ]
|
Modelling consideration on Alarm and Reporting for Notification
|
Fujitsu Limited
|
Q14/15
|
2016-09-02 |
|
[ 1924 ]
|
Clarification for EMF
|
Fujitsu Limited
|
Q14/15
|
2016-09-02 |
|
[ 1923 ]
|
Consideration on IaDI FlexO
|
KDDI Corporation
|
Q11/15
|
2016-09-02 |
|
[ 1922 ]
|
Proposal for Multiservice G.RoF optical architecture and configuration
Duplicate of C1967
|
Telekom Malaysia Berhad
|
Q2/15
|
2016-09-02 |
|
[ 1921 ]
|
Physical Layer Implementation Guidance for "Open Line Systems"
|
Xtera Communications, Inc.
|
Q6/15
|
2016-09-01 |
|
[ 1920 ]
|
Media Control Annex for G.cca
|
Xtera Communications, Inc.
|
Q14/15, Q12/15
|
2016-09-01 |
|
[ 1919 ]
|
Impact of pilot tone and message channel on the payload in G.metro
|
ADVA Optical Networking
|
Q6/15
|
2016-09-01 |
|
[ 1918 ]
|
Proposal to start a new project to specify CPRI over OTN phase 2
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-01 |
|
[ 1917 ]
(Rev.1-2) |
CPRI over OTN phase II extension
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
,
Intel Corporation
,
IP Light
,
Xilinx Incorporation
|
Q11/15
|
2016-09-01 |
|
[ 1916 ]
|
Use of a Persistency Filter in ODUk SNC/S Protected Domains
|
Alcatel-Lucent International
|
Q9/15
|
2016-09-01 |
|
[ 1915 ]
|
100G/B100G multi-vendor FlexO based SOTUm interface family
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-01 |
|
[ 1914 ]
|
Proposed corrections to Table 8-1/G.874 and 7-1/G.806
|
Huawei Technologies Co., Ltd.
|
Q14/15, Q11/15
|
2016-09-01 |
|
[ 1913 ]
|
OTN connections and protected connections
|
Huawei Technologies Co., Ltd.
|
Q9/15, Q12/15, Q11/15
|
2016-09-01 |
|
[ 1912 ]
|
Atomic function specification text proposal of FlexE
|
Huawei Technologies Co., Ltd.
|
Q11/15, Q10/15
|
2016-09-01 |
|
[ 1911 ]
|
FlexE and xGE interoperability update
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-01 |
|
[ 1910 ]
|
Atomic function specification text proposal of the interworking between ETCx and ETCflex
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-01 |
|
[ 1909 ]
|
Atomic function specification text proposal of mapping a 64b/66b PCS coded signal into OPUflex
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-01 |
|
[ 1908 ]
|
ETC Naming Proposal
|
Huawei Technologies Co., Ltd.
|
Q11/15, Q10/15
|
2016-09-01 |
|
[ 1907 ]
|
Comments on the open issues with the ETY_TT description in G.8021
|
Huawei Technologies Co., Ltd.
|
Q11/15, Q10/15
|
2016-09-01 |
|
[ 1906 ]
|
G.hn: Interoperability of different secure admission mechanisms
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q18/15
|
2016-09-01 |
|
[ 1905 ]
(Rev.1-2) |
Draft new Recommendation ITU-T L.osp
|
OFS Fitel, LLC
|
Q16/15
|
2016-08-31 |
|
[ 1904 ]
(Rev.1) |
Proposed modifications to draft new Recommendation G.808
|
Coriant GmbH & Co. KG
|
Q9/15
|
2016-08-31 |
|
[ 1903 ]
|
Proposed appendix to G.798 related to media layer protection
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-08-31 |
|
[ 1902 ]
|
Proposed updates to G.873.1 Appendix III
|
Coriant GmbH & Co. KG
|
Q9/15
|
2016-08-31 |
|
[ 1901 ]
|
Modelling media layer protection using the new G.872 model
|
Coriant GmbH & Co. KG
|
Q9/15, Q12/15, Q11/15
|
2016-08-31 |
|
[ 1900 ]
|
Comments on Clause 8 of draft new Recommendation G.cca
|
Alcatel-Lucent USA Inc.
|
Q12/15
|
2016-08-31 |
|
[ 1899 ]
|
Response on redundant model in TD549
|
Ciena Canada
|
Q13/15
|
2016-08-31 |
|
[ 1898 ]
|
G.8263 Amd. 2 - Typos
|
Ciena Canada
|
Q13/15
|
2016-08-31 |
|
[ 1897 ]
|
Comments on Clause 3 of draft new Recommendation G.cca
|
Alcatel-Lucent USA Inc.
|
Q12/15
|
2016-08-31 |
|
[ 1896 ]
(Rev.1) |
G.8262.1 short term phase transient response for parameter C
|
Ciena Canada
|
Q13/15
|
2016-08-31 |
|
[ 1895 ]
|
Proposed changes to Series G Supplement 41 for coherent systems
|
Ciena Canada
|
Q8/15
|
2016-08-31 |
|
[ 1894 ]
|
Line System Specification Table for G.976
|
Ciena Canada
|
Q8/15
|
2016-08-31 |
|
[ 1893 ]
|
Proposal to Define Open Cable Wet-Plants
|
Ciena Canada
|
Q8/15
|
2016-08-31 |
|
[ 1892 ]
|
G.8275.2 - Deny of service requests
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-08-31 |
|
[ 1891 ]
(Rev.1) |
G.8275.1 T-BC phase/time traceability information
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-08-31 |
|
[ 1890 ]
|
G.cca - Comments on Clause 11
|
Ciena Canada
|
Q14/15, Q12/15
|
2016-08-31 |
|
[ 1889 ]
|
G.cca - Comments on Clause 8.3
|
Ciena Canada
|
Q14/15, Q12/15
|
2016-08-31 |
Resultados :2210 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):