Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Resultados :2210 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Fecha Origen Título AI/Cuestión
[ 1938 ]  
 
2016-09-02 Telecom Italia S.p.A.   Additional SDN use case from ORCHESTRA Project     Q14/15, Q12/15  
[ 1937 ]  
 
2016-09-02 Telefon AB - LM Ericsson   Considerations on sync in fronthaul     Q13/15  
[ 1936 ]  
 
2016-09-02 Telefon AB - LM Ericsson   SyncE Master ID (G.8264)     Q13/15  
[ 1935 ]  
 
2016-09-02 Telefon AB - LM Ericsson   T-TSC Physical layer frequency to PTP noise transfer specification (G.8273.2)     Q13/15  
[ 1934 ]  
 
2016-09-02 Telefon AB - LM Ericsson   Enhanced SyncE Network Limits (G.8261) and Clock (G.8262.1)     Q13/15  
[ 1933 ]  
 
2016-09-02 ZTE Corporation   considerations about the wavelength plan of G.metro     Q6/15  
[ 1932 ]  
 
2016-09-02 ZTE Corporation , CAICT , Ministry of Industry and Information Technology (MIIT)   Considerations on the EVM in the G.698.2     Q6/15  
[ 1931 ]  
 
2016-09-02 Electronics and Telecommunications Research Institute (ETRI) , KT Corporation   Need for all-optical inter-cloud and intra-cloud network architecture     Q12/15  
[ 1930 ]  
 
2016-09-02 Electronics and Telecommunications Research Institute (ETRI) , KT Corporation , Orange   Starting with Sub-Lambda Photonic Switching Network (SLPSN) Standardization, definition of the scope     Q12/15  
[ 1929 ]  
 
2016-09-02 Fujitsu Limited   Comments on draft G.8152 (clause 3 and 4)     Q3/15, Q14/15  
[ 1928 ]  
 
2016-09-02 Fujitsu Limited   Some corrections to G.8121 series     Q10/15  
[ 1927 ]  
 
2016-09-02 Fujitsu Limited   IaDI/IrDI in PTN (G.8012 and G.8112)     Q3/15, Q11/15, Q10/15  
[ 1926 ]  
 
2016-09-02 Fujitsu Limited   Interface definition for OTN     Q12/15, Q11/15  
[ 1925 ]  
 
2016-09-02 Fujitsu Limited   Modelling consideration on Alarm and Reporting for Notification     Q14/15  
[ 1924 ]  
 
2016-09-02 Fujitsu Limited   Clarification for EMF     Q14/15  
[ 1923 ]  
 
2016-09-02 KDDI Corporation   Consideration on IaDI FlexO     Q11/15  
[ 1922 ]  
 
2016-09-02 Telekom Malaysia Berhad   Proposal for Multiservice G.RoF optical architecture and configuration  
Duplicate of C1967
 
Q2/15  
[ 1921 ]  
 
2016-09-01 Xtera Communications, Inc.   Physical Layer Implementation Guidance for "Open Line Systems"     Q6/15  
[ 1920 ]  
 
2016-09-01 Xtera Communications, Inc.   Media Control Annex for G.cca     Q14/15, Q12/15  
[ 1919 ]  
 
2016-09-01 ADVA Optical Networking   Impact of pilot tone and message channel on the payload in G.metro     Q6/15  
[ 1918 ]  
 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Proposal to start a new project to specify CPRI over OTN phase 2     Q11/15  
[ 1917 ]  
(Rev.1-2) 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd. , Intel Corporation , IP Light , Xilinx Incorporation   CPRI over OTN phase II extension     Q11/15  
[ 1916 ]  
 
2016-09-01 Alcatel-Lucent International   Use of a Persistency Filter in ODUk SNC/S Protected Domains     Q9/15  
[ 1915 ]  
 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   100G/B100G multi-vendor FlexO based SOTUm interface family     Q11/15  
[ 1914 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Proposed corrections to Table 8-1/G.874 and 7-1/G.806     Q14/15, Q11/15  
[ 1913 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   OTN connections and protected connections     Q9/15, Q12/15, Q11/15  
[ 1912 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Atomic function specification text proposal of FlexE     Q11/15, Q10/15  
[ 1911 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   FlexE and xGE interoperability update     Q11/15  
[ 1910 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Atomic function specification text proposal of the interworking between ETCx and ETCflex     Q11/15  
[ 1909 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Atomic function specification text proposal of mapping a 64b/66b PCS coded signal into OPUflex     Q11/15  
[ 1908 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   ETC Naming Proposal     Q11/15, Q10/15  
[ 1907 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Comments on the open issues with the ETY_TT description in G.8021     Q11/15, Q10/15  
[ 1906 ]  
 
2016-09-01 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   G.hn: Interoperability of different secure admission mechanisms     Q18/15  
[ 1905 ]  
(Rev.1-2) 
2016-08-31 OFS Fitel, LLC   Draft new Recommendation ITU-T L.osp     Q16/15  
[ 1904 ]  
(Rev.1) 
2016-08-31 Coriant GmbH & Co. KG   Proposed modifications to draft new Recommendation G.808     Q9/15  
[ 1903 ]  
 
2016-08-31 Coriant GmbH & Co. KG   Proposed appendix to G.798 related to media layer protection     Q11/15  
[ 1902 ]  
 
2016-08-31 Coriant GmbH & Co. KG   Proposed updates to G.873.1 Appendix III     Q9/15  
[ 1901 ]  
 
2016-08-31 Coriant GmbH & Co. KG   Modelling media layer protection using the new G.872 model     Q9/15, Q12/15, Q11/15  
[ 1900 ]  
 
2016-08-31 Alcatel-Lucent USA Inc.   Comments on Clause 8 of draft new Recommendation G.cca     Q12/15  
[ 1899 ]  
 
2016-08-31 Ciena Canada   Response on redundant model in TD549     Q13/15  
[ 1898 ]  
 
2016-08-31 Ciena Canada   G.8263 Amd. 2 - Typos     Q13/15  
[ 1897 ]  
 
2016-08-31 Alcatel-Lucent USA Inc.   Comments on Clause 3 of draft new Recommendation G.cca     Q12/15  
[ 1896 ]  
(Rev.1) 
2016-08-31 Ciena Canada   G.8262.1 short term phase transient response for parameter C     Q13/15  
[ 1895 ]  
 
2016-08-31 Ciena Canada   Proposed changes to Series G Supplement 41 for coherent systems     Q8/15  
[ 1894 ]  
 
2016-08-31 Ciena Canada   Line System Specification Table for G.976     Q8/15  
[ 1893 ]  
 
2016-08-31 Ciena Canada   Proposal to Define Open Cable Wet-Plants     Q8/15  
[ 1892 ]  
 
2016-08-31 Integrated Device Technology (IDT)   G.8275.2 - Deny of service requests     Q13/15  
[ 1891 ]  
(Rev.1) 
2016-08-31 Integrated Device Technology (IDT)   G.8275.1 T-BC phase/time traceability information     Q13/15  
[ 1890 ]  
 
2016-08-31 Ciena Canada   G.cca - Comments on Clause 11     Q14/15, Q12/15  
[ 1889 ]  
 
2016-08-31 Ciena Canada   G.cca - Comments on Clause 8.3     Q14/15, Q12/15  
Resultados :2210 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2016-09-28