Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 1060 ]
|
Editorial Comments to the current text for BNM in draft G.8021
|
Huawei Technologies Co. Ltd.
|
Q10/15
|
2014-11-11 |
|
[ 1059 ]
|
Ethernet Protection over Dual Parented Type B (TDM/TDMA) PON
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-11-11 |
|
[ 1058 ]
|
Editorial Comments to the current text for BNM in draft G.8013
|
Huawei Technologies Co. Ltd.
|
Q10/15
|
2014-11-11 |
|
[ 1057 ]
|
Support of the DiffServ Uniform Model in G.8121
|
Huawei Technologies Co. Ltd.
|
Q10/15
|
2014-11-11 |
|
[ 1056 ]
|
Need for P/CoS information for 1DM Sink processing in G.8021 and G.8121
|
Huawei Technologies Co. Ltd.
|
Q14/15, Q10/15
|
2014-11-11 |
|
[ 1055 ]
|
Editorial Comments to MEP compound functions notes in G.8121, G.8152, G.8021 and G.8052
|
Huawei Technologies Co. Ltd.
|
Q14/15, Q10/15
|
2014-11-11 |
|
[ 1054 ]
|
Comments about dFOP and cFOP definitions in G.8121 and G.8021
|
Huawei Technologies Co. Ltd.
|
Q10/15
|
2014-11-11 |
|
[ 1053 ]
|
On DRRus report format to support queue fill and traffic arrival triggers for LPM state changes
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-11-11 |
|
[ 1052 ]
(Rev.1) |
G.989.3 Rogue Modifications
|
Alcatel-Lucent USA Inc.
|
Q2/15
|
2014-11-11 |
|
[ 1051 ]
|
Draft new recommendation for PRIME 1.4 networks
|
STMicroelectronics
|
Q15/15
|
2014-11-11 |
|
[ 1050 ]
|
G.vdsl,G.inp: Format for tone grouping in L2-SRA message
|
Broadcom Corporation
|
Q4/15
|
2014-11-11 |
|
[ 1049 ]
|
Interferometric crosstalk measurement and model
|
Telefon AB - LM Ericsson
|
Q6/15
|
2014-11-11 |
|
[ 1048 ]
(Rev.1) |
Multiple radio signal downlink transmission based on IF-band RoF transmission scheme
|
Electronics and Telecommunications Research Institute (ETRI)
,
SK Telecom
|
Q2/15
|
2014-11-11 |
|
[ 1047 ]
|
G.fast: need for information to other organisations
|
Swisscom SA
|
Q4/15
|
2014-11-11 |
|
[ 1046 ]
|
G.fast: Compatibility Issues with multi-mode VDSL2/G.fast FTTdp equipment.
|
Swisscom SA
|
Q4/15
|
2014-11-11 |
|
[ 1045 ]
|
Proposal for test plan for parameters related to EVM
|
ADVA Optical Networking
,
Coriant GmbH & Co. KG
|
Q6/15
|
2014-11-11 |
|
[ 1044 ]
|
Proposal on Clause 10 (OTN MDSP) of G.mdsp
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2014-11-11 |
|
[ 1043 ]
|
Editorial comments on G.873.2
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2014-11-11 |
|
[ 1042 ]
|
Proposal to add a new type of ODNs topologies in G.multi
|
FiberHome Technologies Group
|
Q2/15
|
2014-11-11 |
|
[ 1041 ]
|
Clarifications on G.8262
|
Rakon Limited
|
Q13/15
|
2014-11-11 |
|
[ 1040 ]
|
Comments on G.654.E fibre category proposal
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q5/15
|
2014-11-11 |
|
[ 1039 ]
|
Proposal to add PON-ID checking in G.989.3
|
FiberHome Technologies Group
|
Q2/15
|
2014-11-11 |
|
[ 1038 ]
|
Proposal of ODU SMP
|
ZTE Corporation
|
Q9/15
|
2014-11-11 |
|
[ 1037 ]
|
Proposed protection for a failure of interconnected link in G.MDSP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2014-11-11 |
|
[ 1036 ]
|
Consideration on network objective in G.mdsp
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2014-11-11 |
|
[ 1035 ]
|
G.vdsl: New VDSL2 Band Plan for China
|
Futurewei Technologies US R&D Center
,
Metanoia Technologies, Inc.
|
Q4/15
|
2014-11-11 |
|
[ 1034 ]
|
Calculation of Hlog
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2014-11-11 |
|
[ 1033 ]
|
G.fast: Symbol transmission in L2.2 state
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2014-11-11 |
|
[ 1032 ]
|
ONU power levelling for G.989.3
|
Alcatel-Lucent USA Inc.
,
Electronics and Telecommunications Research Institute (ETRI)
|
Q2/15
|
2014-11-11 |
|
[ 1031 ]
|
Proposal for EECv2 specifications
|
Rakon Limited
|
Q13/15
|
2014-11-11 |
|
[ 1030 ]
|
Withdrawn
Reposted as TD116/WP2, "G.972: Living list"
|
N/A (no se aplica)
|
|
2014-11-11 |
|
[ 1029 ]
|
Proposal to revise G.suppl.41 considering 100G application
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
|
Q8/15
|
2014-11-11 |
|
[ 1028 ]
|
Proposal to revise G.973.1 considering 100G application
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
|
Q8/15
|
2014-11-11 |
|
[ 1027 ]
|
Proposal to revise G.973 considering 100G application
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
|
Q8/15
|
2014-11-11 |
|
[ 1026 ]
|
G.993.2: Proposed additions to G.993.2 Amendment 6
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-11-11 |
|
[ 1025 ]
|
G.993.2, G.hn: The role of DSL protection mode in DSL-PLT coexistence
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-11-11 |
|
[ 1024 ]
|
G.993.2, G.hn: On the VDSL2-PLT coordination procedure
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-11-11 |
|
[ 1023 ]
|
G.993.2, G.hn: Protocol structure for support DSL-PLT coexistence
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-11-11 |
|
[ 1022 ]
|
G.993.2, G.fast: Improving services from VDSL2 17A cabinets using G.fast
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-11-11 |
|
[ 1021 ]
|
Amendment of G.7041- considerations of PTP & SyncO over OTN
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-11-11 |
|
[ 1020 ]
|
Amendment of G.709- considerations of PTP & SyncO over OTN
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-11-11 |
|
[ 1019 ]
|
Proposal for Clause 13 and Appendix II
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q2/15
|
2014-11-11 |
|
[ 1018 ]
|
Conclusions of "PTP only" and "SyncE+PTP" network test
|
China Unicom
|
Q13/15
|
2014-11-11 |
|
[ 1017 ]
|
Proposed Edits to Draft Amendment 4 to Recommendation ITU-T G.998.4 (2010)
|
TQ DELTA. LLC
|
Q4/15
|
2014-11-11 |
|
[ 1016 ]
|
Test experience and requirements of intelligent node elements in optical fiber networks
|
China Unicom
|
Q16/15
|
2014-11-11 |
|
[ 1015 ]
|
Consideration on the interconnected link at the domain boundary
|
China Unicom
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2014-11-11 |
|
[ 1014 ]
|
Consideration on the Back-to-Back interconnection scenarios of G.MDSP
|
China Unicom
|
Q9/15
|
2014-11-11 |
|
[ 1013 ]
|
Requirement of one to one and bidirectional switching protection of optical layer
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group
|
Q9/15
|
2014-11-11 |
|
[ 1012 ]
|
On Operation of G.hn technology over the phone line medium in the presence of neighbouring domains
|
KT Corporation
|
Q18/15
|
2014-11-11 |
|
[ 1011 ]
|
Proposal of left questions in G.873.1 Amendment 1
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-11-11 |
Resultados :2210 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):