Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Reunión 2013-07-01 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C (2013-07-01) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Reunión  del 2013-07-01 al 2013-07-12

Lugar : Suiza [Ginebra]

Otras reuniones : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Resultados :57 documentos
Resultados :  1 - 2  - Siguiente Next
Contribuciones  [ Origen: Huawei Technologies Co. Ltd. ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 296 ]  
 
Revision of network limits in G.8271.1     Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Telefon AB - LM Ericsson   Q13/15   2013-06-17
[ 275 ]  
 
Re-arrangement times for G.8271.1 HRM topologies     Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 263 ]  
 
proposal for study on requirements for wavelength selective reflector in in-service fibre test system application     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q17/15   2013-06-17
[ 255 ]  
 
OTUCn/ODUCn proposal after Q11/15's Feb 2013 meeting     China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 254 ]  
 
N*100G flexible bit rate OTUCn proposal     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd. , Infinera Corporation   Q11/15   2013-06-17
[ 253 ]  
 
Static noise generation of G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 252 ]  
 
Delay_Req Transmission Requirements in G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 251 ]  
 
Proposals for G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 250 ]  
 
Proposal for default value for offsetScaledLogVariance, for G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 249 ]  
 
Discussion of Noise Tolerance in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 248 ]  
 
Proposal for Time Noise Transfer in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 247 ]  
 
Proposed Text for Method 3 of G.8263-Testing     Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG , Orange   Q13/15   2013-06-17
[ 246 ]  
 
Proposed Correction to Annex C of ITU-T Rec. O.172     Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 245 ]  
 
PLL bandwidth requirement for G.8261.1 network limit test     Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 244 ]  
 
Delay asymmetry test result using different traffic generation methods     Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 243 ]  
 
Proposals for Transient and Holdover Specifications for G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 241 ]  
 
The time noise generation of T-BC in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 240 ]  
 
Explanation of Time Selector Block in G.8273.2 Functional Model     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 239 ]  
 
Network limit and HRM hops of G.8271.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 238 ]  
 
HRM2 SyncE transients of G.8271.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 237 ]  
 
Clock Classes for G.8275.1 and T-BC/T-TSC Models     Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 236 ]  
 
Proposed text in G.MDSP     China Unicom , Huawei Technologies Co. Ltd.   Q9/15   2013-06-17
[ 235 ]  
 
APS Behavior in 1-stage ODU SMP Proposal     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-17
[ 234 ]  
 
Discussion about Single Failure and its Potential Affect in ODU SMP     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-17
[ 233 ]  
 
Proposed description for the alternative OSNR measurement method in G.697     Huawei Technologies Co. Ltd.   Q6/15   2013-06-17
[ 232 ]  
 
Proposal on adding bandwidth degradation message in Y.1731     Huawei Technologies Co. Ltd.   Q10/15   2013-06-17
[ 231 ]  
 
Measurement results of spectral excursion for 100G applications in G.698.2     Huawei Technologies Co. Ltd.   Q6/15   2013-06-17
[ 230 ]  
 
Consideration on the service protection of an MD-ROADM in G.672     Huawei Technologies Co. Ltd.   Q7/15   2013-06-17
[ 229 ]  
 
Analysis of Supporting External Commands in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2013-06-17
[ 228 ]  
 
Extension of OTN hybrid equipment     China Mobile Communications Corporation , China Unicom , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 227 ]  
 
Enhancements of OTN hybrid equipment     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q11/15, Q10/15   2013-06-17
[ 226 ]  
 
Multilayer protocol stack of OTN interface     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 225 ]  
 
Comparison of OTU4Cn vs OTUCn     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 224 ]  
 
Beyond 100G use case and design considerations     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 223 ]  
 
Answers to B100G questions from Q11/15 rapporteur (TD22/GEN)     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2013-06-17
[ 222 ]  
 
Multi-carrier OCh signal and connection behaviour under optical layer faults     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 220 ]  
 
OTM-1 multi vendor IaDI management capability requirements     Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 219 ]  
 
Proposal to add a description of a multi-carrier OCh for the transport of an OTUk     Huawei Technologies Co. Ltd.   Q14/15, Q11/15   2013-06-17
[ 218 ]  
 
The APS command exercise is not optional     Huawei Technologies Co. Ltd.   Q3/15   2013-06-17
[ 217 ]  
 
Use of BIP monitors behind a HD or SD FEC process     Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 216 ]  
 
Block diagram example of n x OTU4 and OTUCn framer     Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 215 ]  
 
Beyond 100G tributary slot structure considerations     Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 214 ]  
 
Proposal to add HAO capable ODUflex to MPLS-TP adaptation function     Huawei Technologies Co. Ltd.   Q11/15, Q10/15   2013-06-17
[ 189 ]  
 
Multilayer protocol stack of OTN interface  
Withdrawn: Duplicate of C-0226
 
China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q11/15   2013-06-17
[ 145 ]  
 
ODU SMP Activation Time     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
[ 144 ]  
 
Improved Encoding/processing of Messages for 1-Stage ODU SMP Protocol     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
[ 143 ]  
 
Determining the Time Position of Upstream Probe Sequence     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 142 ]  
 
G.fast: On Discontinuous Operation     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 141 ]  
 
On Transition From L2.2 to Other States     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 140 ]  
 
Probe Sequence Modulation and Error Signal Feedback     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
Resultados :57 documentos
Resultados :  1 - 2  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-28