Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Reunión 2013-07-01 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C (2013-07-01) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Reunión  del 2013-07-01 al 2013-07-12

Lugar : Suiza [Ginebra]

Otras reuniones : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Resultados :440 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 90 ]  
 
Application scenarios for low-cost DWDM metro systems     Italy   Q6/15   2013-06-14
[ 89 ]  
 
Requirements for low-cost DWDM metro systems     Italy   Q6/15   2013-06-14
[ 88 ]  
 
Proposal about compatibility issues for the revision of G.65x Recommendations on optical fibres     Italy   Q5/15   2013-06-14
[ 87 ]  
 
Operational examples of 2-stage ODU SMP APS protocol     Tellabs Oy   Q9/15   2013-06-13
[ 86 ]  
 
Resource availability notifications in ODU shared mesh protection     Tellabs Oy   Q9/15   2013-06-13
[ 85 ]  
 
Proposed changes to Recommendation G.977 for 40G and 100G systems     Ciena Canada   Q8/15   2013-06-13
[ 84 ]  
 
Proposal for Update to G.977 considering 40G and 100G Coherent Systems     Ciena Canada   Q8/15   2013-06-13
[ 83 ]  
 
How to handle unused PTP fields in BMCA/G.781 [G.8275.1]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 82 ]  
 
Noise Generation & Noise Transfer Text [G.8273.2]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 81 ]  
 
Adding Applicable Interfaces to PRTC [G.8272]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 80 ]  
 
Wander Generation Variable Temperature [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 79 ]  
 
Clarification of Holdover Requirements for PEC-S [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 78 ]  
 
Using G.781 for Time Profile [G.827x]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 77 ]  
 
Compliant & Non-Compliant Networks (Re-routes, Outage, Congestion) with FPP [G.8260, G.8261.1]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 76 ]  
 
Proposal to change the approval process for G.8113.1 and G.8113.2 from TAP to AAP     Canada   Q10/15   2013-06-13
[ 75 ]  
 
Spectral excursion analysis for advanced modulation formats     Ciena Canada   Q6/15   2013-06-13
[ 74 ]  
 
Effective frequency slot characterisation     Ciena Canada   Q6/15, Q12/15   2013-06-13
[ 73 ]  
 
G.It: Discussion on accuracy of multi-component measurements     Microsemi Semiconductor Corporation   Q4/15   2013-06-13
[ 72 ]  
 
G.It: Request for revision of G.996.2 3-element capacitance measurement accuracies     Microsemi Semiconductor Corporation   Q4/15   2013-06-13
[ 71 ]  
 
G.8273.2 latest draft - editorial comments     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 70 ]  
 
G.8273 latest draft - editorial comments     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 69 ]  
 
G.8263 Holdover     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 68 ]  
(Rev.1-2) 
Proposal of SDN-based transport network standardization     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 67 ]  
(Rev.1-3) 
Proposal of research on NBI functionality of controller in SDN-based transport network     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 66 ]  
(Rev.1-2) 
The research of the functions features of the transport network controller     China Unicom , FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 65 ]  
(Rev.1-2) 
Proposal of research on transport network resource virtualization or abstraction     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 64 ]  
(Rev.1-2) 
Proposal of research resource partitioning of SDN-based transport network     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 63 ]  
(Rev.1-2) 
Proposal of research on coexistence and interworking between current transport network and SDN-based network     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 62 ]  
(Rev.1-2) 
Proposal of research Secure Channel in SDN-based transport network     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 61 ]  
(Rev.1-2) 
Proposal of research architecture for network management, controller and transport plane     China Unicom , FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 60 ]  
(Rev.1-3) 
Comments on CCCV mode in G.8121.2     FiberHome Technologies Group   Q10/15   2013-06-13
[ 59 ]  
 
G.8263 Wander Generation     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 58 ]  
(Rev.1-3) 
Comments on Ring Protection Function in G.8052     FiberHome Technologies Group   Q14/15   2013-06-13
[ 57 ]  
 
Security in Optical Transport Networks     Altera Newfoundland Technology Centre (Altera NTC)   Q11/15   2013-06-13
[ 56 ]  
 
Getting a 'point to point modem proof' PON ranging process     Orange   Q2/15   2013-06-13
[ 55 ]  
 
PON-Id fuelled power saving capabilities     Orange   Q2/15   2013-06-13
[ 54 ]  
 
Detection of point to point modems on a PON     Orange   Q2/15   2013-06-13
[ 53 ]  
 
Necessity to Support External Commands in ODU SMP Protocol     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q9/15   2013-06-13
[ 52 ]  
 
MPLS-TP shared ring protection(MSRP) implementation and test result     China Mobile Communications Corporation   Q9/15   2013-06-13
[ 51 ]  
 
PWE3 Dual-Homing Protection Requirements     China Mobile Communications Corporation   Q9/15   2013-06-13
[ 50 ]  
 
Proposal for PTP clockclasses     China Mobile Communications Corporation   Q13/15   2013-06-13
[ 49 ]  
 
Proposal for HRM hops and BC constant time error     China Mobile Communications Corporation   Q13/15   2013-06-13
[ 48 ]  
(Rev.1) 
Proposal to reserve Priority 1 in BMCA     China Mobile Communications Corporation   Q13/15   2013-06-13
[ 47 ]  
(Rev.1) 
ODU SMP with centralized control plane     China Mobile Communications Corporation   Q9/15   2013-06-13
[ 46 ]  
(Rev.1) 
Proposal for different correlation structures for SDN-based transport network controller and path computation element (PCE)     China Unicom   Q12/15   2013-06-13
[ 45 ]  
 
Optical transceiver performance for the new CWDM applications with multi sub-channel interface     Ericsson-LG , SK Telecom   Q6/15   2013-06-13
[ 44 ]  
(Rev.1) 
Proposal for revision of recommendation ITU-T L.60     FiberHome Technologies Group   Q16/15   2013-06-13
[ 43 ]  
 
Consideration for Interworking between Ethernet Linear Protection in G.MDSP     China Unicom   Q9/15   2013-06-13
[ 42 ]  
(Rev.1) 
Proposal to add related description of PMDQ in ITU-T Recommendation G.650.2(2007)     FiberHome Technologies Group , Ministry of Information and Industry of China   Q5/15   2013-06-13
[ 41 ]  
 
Definition of serial data interface comunication ME in G.988     FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q2/15   2013-06-13
Resultados :440 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-27