Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 11 : Reunión 2015-12-02 : Documentos Temporales  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 11  TD (2015-12-02) 

UIT-T SG 11

Protocols and test specifications

Periodo de estudios 2013

Reunión  del 2015-12-02 al 2015-12-11

Lugar : Suiza [Ginebra]

Otras reuniones : 2016-06-27  2016-04-29  2016-03-24  [ 2015-12-02 ]  2015-04-22  2014-11-21  2014-07-09  2014-02-21  2013-11-14  2013-11-07  2013-06-21  2013-02-25 

Resultados :29 documentos
Documentos Temporales  (GEN)  [ Origen: Rapporteur Q11/11 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1048-GEN ]  
 
Output - The list of pilot projects for conformity assessment against ITU-T Recommendations (11 December 2015)     Rapporteur Q11/11   Q11/11   2015-12-09
[ 961-GEN ]  
(Rev.1) 
Report of Question 11/11 meeting "Protocols and networks test specifications; frameworks and methodologies"     Rapporteur Q11/11   Q11/11   2015-12-07
[ 921-GEN ]  
 
Agenda for Q11/11 "Protocols and Networks Test Specifications"     Rapporteur Q11/11   Q11/11   2015-11-30
[ 891-GEN ]  
 
Report of the joint interim Rapporteur's group meeting of ITU-T Q11/11 and ETSI TC INT meeting (Vienna, 10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 890-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.C&I_VOC "Terms and definitions to be used in Conformance and Interoperability issues" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Associate Rapporteur Q11/11   Q11/11   2015-10-12
[ 889-GEN ]  
 
Output - The reference table of ITU-T Recommendations to be used for conformity/interoperability assessment (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 888-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3941.5 "Network integration testing between SIP and ISDN/PSTN network signalling protocols. Part 5: TSS&TP for Network Integration Tests between ISDN-ISDN and ISDN-PSTN over SIP II NNI / SIP-I NNI" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 887-GEN ]  
 
Output - Proposal to advance draft Recommendation ITU-T Q.3941.1 "Network integration testing between SIP and ISDN/PSTN network signalling protocols - Part 1: Test suite structure and test purposes for SIP-ISDN" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 886-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_IAD_TS_Part2 v.1 [3GPP Release 10] "PSTN/ISDN terminal equipment using IP Multimedia core network subsystem; Conformance testing; Part 2: TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 885-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CW_User_TS_Part3 v.1 [3GPP Release 10] "Communication waiting service using IP Multimedia core network subsystem; Conformance testing; Part 3: User side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 884-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CW_Net_TS_Part2 v.1 [3GPP Release 10] "Communication waiting service using IP Multimedia core network subsystem; Conformance testing; Part 2: Network side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 883-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CW_Net_TS_Part1 v.1 [3GPP Release 10] "Communication waiting service using IP Multimedia core network subsystem; Conformance testing; Part 1: Network side, User side, PICS" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 882-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CONF_User_TS_Part3 v.1 [3GPP Release 10] "Conference service using IP Multimedia core network subsystem; Conformance testing; Part 3: User side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 881-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CONF_Net_TS_Part2 v.1 [3GPP Release 10] "Conference service using IP Multimedia core network subsystem; Conformance testing; Part 2: Network side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 880-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CONF_Net_TS_Part1 v.1 [3GPP Release 10] "Conference service using IP Multimedia core network subsystem; Conformance testing; Part 1: Network side, User side, PICS" Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 879-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CDIV_User_TS_Part3 v.1 [3GPP Release 10] "Communication Diversion using IP Multimedia core network subsystem; Conformance testing; Part 3: User side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 878-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CDIV_Net_TS_Part2 v.1 [3GPP Release 10] "Communication Diversion using IP Multimedia core network subsystem; Conformance testing; Part 2: Network side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 877-GEN ]  
 
Output - Proposal for a baseline text for draft Q.39_SI_CDIV_ Net_User_TS_Part1 v.1 [3GPP Release 10] "Communication Diversion using IP Multimedia core network subsystem; Conformance testing; Recommendation ITU-T Q.3944.3_SI_ HOLD_Net_TS_Part3 v.1 [3GPP Release 10] "Communication HOLD using IP Multimedia core network subsystem; Conformance testing; Part 1: User side, Network side,     Rapporteur Q11/11   Q11/11   2015-10-12
[ 876-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3944.2_SI_ HOLD_Net_TS_Part2 v.1 [3GPP Release 10] "Communication HOLD using IP Multimedia core network subsystem; Conformance testing; Part 2: Network side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 875-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3944.3 v.1 [3GPP Release 10] "Communication HOLD (HOLD) using IP multimedia core network subsystem; Conformance Testing; Part 3: User side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 874-GEN ]  
 
Output - Proposal to advance draft Recommendation ITU-T Q.3944.1 v.1 [3GPP Release 10] "Communication HOLD (HOLD) using IP multimedia core network subsystem; Conformance Testing. Part 1: Network side, User side, PICS"(Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 873-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3943.3-rev_SI_OIP_OIR_User_TS_Part3 v.1 [3GPP Release 10] "OIP and OIR using IP Multimedia core network subsystem; Conformance testing; Part 3: user side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 872-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3943.2-rev_SI_OIP_OIR_Net_TS_Part2 v.1 [3GPP Release 10] "OIP and OIR using IP Multimedia core network subsystem; Conformance testing; Part 2: network side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 871-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3943.1-rev_SI_OIP_OIR_Net_User_TS_Part1 v.1 [3GPP Release 10] "OIP and OIR using IP Multimedia core network subsystem. Conformance testing. Part 1: user and network side, PICS" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 870-GEN ]  
 
Revised SIP-IMS conformance testing standardization work plan (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-09
[ 869-GEN ]  
 
LS/o/r on vocabulary for conformance and interoperability (reply to SCV LS 8) [to ITU-D SG2 Q4/2]     Rapporteur Q11/11   Q11/11   2015-10-09
[ 868-GEN ]  
 
LS/o/r on Conformance and Interoperability Testing (CIT) activities for WP1/15 Recommendations (reply to SG15 LS 244) [to ITU-T SG15]     Rapporteur Q11/11   Q11/11   2015-10-09
[ 867-GEN ]  
 
LS/o/r on updated living list of key technologies, reference table of ITU-T Recommendations which are suitable for C&I and relevant pilot projects (reply to COM16-LS 126) [to ITU-T SG16]     Rapporteur Q11/11   Q11/11   2015-10-08
[ 866-GEN ]  
 
LS/o/r on ongoing collaboration (reply to ITU-D Q4/2 - SG2RGQ/79-E) [to ITU-D SG2 Q4/2]     Rapporteur Q11/11   Q11/11   2015-10-08
Resultados :29 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-5-27