Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 2065 ]
|
Proposed Input for G.smp Summary Clause re Capacity Efficiency
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2064 ]
(Rev.1) |
G.vdsl: Proposed Accuracy Target for LATN and SATN
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4A/15
|
2012-08-24 |
|
[ 2063 ]
(Rev.1) |
G.8263: PDV Noise Tolerance Testing for the PEC-S-F
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2062 ]
|
Mapping of 16G Fibre-Channel into OTN
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2012-08-24 |
|
[ 2061 ]
(Rev.1-2) |
Proposed Input for G.smp Summary Clause re Mesh Topology Definition
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2060 ]
|
G.8263: PDV Distribution for Noise Tolerance of Packet Slave Clocks
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2059 ]
(Rev.1) |
G.ploam: Parameters for Data Gathering Messaging
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4A/15
|
2012-08-24 |
|
[ 2058 ]
|
Misalignment among G.709, G.798 and G.872
|
Ciena Corporation
|
Q9/15, Q12/15, Q11/15
|
2012-08-24 |
|
[ 2057 ]
|
G.vdsl: Proposed text for Data Gathering Messaging
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4A/15
|
2012-08-24 |
|
[ 2056 ]
|
Generic considerations for protection resource assignments in G.smp
|
Alcatel-Lucent USA Inc.
,
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2055 ]
|
Distributed G.8031 proposal
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2054 ]
|
Requirements of Control Plane/Management Plane to support SMP
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2053 ]
(Rev.1) |
Development of a new PTP Profile for Time/Phase Distribution
|
AT&T, Inc.
,
Sprint
,
SymmetriCom, Inc.
,
Verizon Communication Corporation
|
Q13/15
|
2012-08-24 |
|
[ 2052 ]
|
Protection Interworking editorial comments
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2051 ]
|
Bi-directional SMP Operation and Signalling Flow Sequence
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2050 ]
(Rev.1) |
Proposal for determined text G.9955 Annex A - Amd1 - Padding of MAC frame
|
ERDF
|
Q4C/15
|
2012-08-24 |
|
[ 2049 ]
|
Comments and clarifications on G.smp
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2048 ]
|
G.odusmp Support of Both ODUj and ODUk Restoration
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2047 ]
|
Use of CL-SNCG/S to simplify G.873.2 configurations
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2046 ]
|
Not used
Withdrawn by submitter
|
N/A (no se aplica)
|
Q9/15
|
2012-08-24 |
|
[ 2045 ]
|
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
AT&T, Inc.
,
Ciena Corporation
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-24 |
|
[ 2044 ]
|
G.odusmp with TCM APS
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2043 ]
|
Alternative to legacy interfaces for connecting PRTC to T-GM
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2042 ]
|
G.8272: PRTC Support of SyncE and ESMC
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2041 ]
|
G.smp multiple failure protection pre-emption
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2040 ]
|
Support of IPv6 for G.8265.1
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2039 ]
|
Two-step clock issue with multicast transmission
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2038 ]
|
Support of IP for G.8275.x
|
Cisco Systems, Inc.
,
Juniper Networks
|
Q13/15
|
2012-08-24 |
|
[ 2037 ]
|
ODU SMP APS protocol considerations
|
Tellabs Oy
|
Q9/15
|
2012-08-24 |
|
[ 2036 ]
|
Protection Interworking - Linear Protection Generic Models
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2035 ]
|
Alignment of APS specifications in G.873.1, G.798, and G.709
|
Tellabs Oy
|
Q9/15, Q11/15
|
2012-08-24 |
|
[ 2034 ]
|
Proposed appendix to G.798.1 concerning SNC implementation considerations
|
Tellabs Oy
|
Q9/15
|
2012-08-24 |
|
[ 2033 ]
(Rev.1-2) |
Proposal for consented text G.9956 Annex A - Cor1 - Various corrections and clarifications
|
ERDF
|
Q4C/15
|
2012-08-24 |
|
[ 2032 ]
|
G.vdsl: Comments and proposed text for Data Gathering functionality at the VTU-O and VTU-R
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
|
Q4A/15
|
2012-08-24 |
|
[ 2031 ]
|
Not used
Withdrawn by submitter
|
N/A (no se aplica)
|
|
2012-08-24 |
|
[ 2030 ]
|
Update to the AIS Insert process in G.8121.2
|
Cisco Systems, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2029 ]
|
Update to the AIS Insert process in G.8121
|
Cisco Systems, Inc.
|
Q9/15, Q14/15
|
2012-08-24 |
|
[ 2028 ]
|
Proposed Text for adding Lock Instruct functions to G.8121.2
|
Cisco Systems, Inc.
|
Q9/15, Q14/15
|
2012-08-24 |
|
[ 2027 ]
|
Proposed Text for adding Lock Instruct functions to G.8121
|
Cisco Systems, Inc.
|
Q9/15, Q14/15
|
2012-08-24 |
|
[ 2026 ]
|
Proposed text for G.8121 Appendix describing PHB flows
|
Cisco Systems, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2025 ]
|
Updates to G.8121.2 for alignment with G.8121
|
Cisco Systems, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2024 ]
|
G.fast: Limitations on cyclic prefix length
|
Swisscom SA
|
Q4A/15
|
2012-08-24 |
|
[ 2023 ]
|
Terminology for Performance Monitoring in G.8013/Y.1731
|
Cisco Systems, Inc.
|
Q9/15, Q14/15, Q10/15
|
2012-08-24 |
|
[ 2022 ]
|
G.fast: Requirements for VDSL2 emulation on G.fast hardware
|
Swisscom SA
|
Q4A/15
|
2012-08-24 |
|
[ 2021 ]
|
Proposal for Updating External Commands
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-24 |
|
[ 2020 ]
|
ODU SMP Protocol
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-24 |
|
[ 2019 ]
|
ODU SMP Application Analysis
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-24 |
|
[ 2018 ]
|
Editorial Suggestions for G.smp
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-24 |
|
[ 2017 ]
|
Discussion and Update for ODU SMP Node Functional Model
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-24 |
|
[ 2016 ]
|
Discussion and Proposal for Solving SMP Objectives Open Issues
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2012-08-24 |
Resultados :452 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):