Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2012-09-10 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2012-09-10) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2012-09-10 al 2012-09-21

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultados :452 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 2065 ]  
 
Proposed Input for G.smp Summary Clause re Capacity Efficiency     Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2064 ]  
(Rev.1) 
G.vdsl: Proposed Accuracy Target for LATN and SATN     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2063 ]  
(Rev.1) 
G.8263: PDV Noise Tolerance Testing for the PEC-S-F     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2062 ]  
 
Mapping of 16G Fibre-Channel into OTN     Alcatel-Lucent USA Inc.   Q11/15   2012-08-24
[ 2061 ]  
(Rev.1-2) 
Proposed Input for G.smp Summary Clause re Mesh Topology Definition     Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2060 ]  
 
G.8263: PDV Distribution for Noise Tolerance of Packet Slave Clocks     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2059 ]  
(Rev.1) 
G.ploam: Parameters for Data Gathering Messaging     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2058 ]  
 
Misalignment among G.709, G.798 and G.872     Ciena Corporation   Q9/15, Q12/15, Q11/15   2012-08-24
[ 2057 ]  
 
G.vdsl: Proposed text for Data Gathering Messaging     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2056 ]  
 
Generic considerations for protection resource assignments in G.smp     Alcatel-Lucent USA Inc. , Ciena Corporation   Q9/15   2012-08-24
[ 2055 ]  
 
Distributed G.8031 proposal     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2054 ]  
 
Requirements of Control Plane/Management Plane to support SMP     Ciena Corporation   Q9/15   2012-08-24
[ 2053 ]  
(Rev.1) 
Development of a new PTP Profile for Time/Phase Distribution     AT&T, Inc. , Sprint , SymmetriCom, Inc. , Verizon Communication Corporation   Q13/15   2012-08-24
[ 2052 ]  
 
Protection Interworking editorial comments     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2051 ]  
 
Bi-directional SMP Operation and Signalling Flow Sequence     Ciena Corporation   Q9/15   2012-08-24
[ 2050 ]  
(Rev.1) 
Proposal for determined text G.9955 Annex A - Amd1 - Padding of MAC frame     ERDF   Q4C/15   2012-08-24
[ 2049 ]  
 
Comments and clarifications on G.smp     Ciena Corporation   Q9/15   2012-08-24
[ 2048 ]  
 
G.odusmp Support of Both ODUj and ODUk Restoration     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2047 ]  
 
Use of CL-SNCG/S to simplify G.873.2 configurations     Ciena Corporation   Q9/15   2012-08-24
[ 2046 ]  
 
Not used  
Withdrawn by submitter
 
N/A (no se aplica)   Q9/15   2012-08-24
[ 2045 ]  
 
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     AT&T, Inc. , Ciena Corporation   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-24
[ 2044 ]  
 
G.odusmp with TCM APS     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2043 ]  
 
Alternative to legacy interfaces for connecting PRTC to T-GM     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2042 ]  
 
G.8272: PRTC Support of SyncE and ESMC     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2041 ]  
 
G.smp multiple failure protection pre-emption     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2040 ]  
 
Support of IPv6 for G.8265.1     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2039 ]  
 
Two-step clock issue with multicast transmission     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2038 ]  
 
Support of IP for G.8275.x     Cisco Systems, Inc. , Juniper Networks   Q13/15   2012-08-24
[ 2037 ]  
 
ODU SMP APS protocol considerations     Tellabs Oy   Q9/15   2012-08-24
[ 2036 ]  
 
Protection Interworking - Linear Protection Generic Models     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2035 ]  
 
Alignment of APS specifications in G.873.1, G.798, and G.709     Tellabs Oy   Q9/15, Q11/15   2012-08-24
[ 2034 ]  
 
Proposed appendix to G.798.1 concerning SNC implementation considerations     Tellabs Oy   Q9/15   2012-08-24
[ 2033 ]  
(Rev.1-2) 
Proposal for consented text G.9956 Annex A - Cor1 - Various corrections and clarifications     ERDF   Q4C/15   2012-08-24
[ 2032 ]  
 
G.vdsl: Comments and proposed text for Data Gathering functionality at the VTU-O and VTU-R     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , AT&T, Inc.   Q4A/15   2012-08-24
[ 2031 ]  
 
Not used  
Withdrawn by submitter
 
N/A (no se aplica)     2012-08-24
[ 2030 ]  
 
Update to the AIS Insert process in G.8121.2     Cisco Systems, Inc.   Q9/15   2012-08-24
[ 2029 ]  
 
Update to the AIS Insert process in G.8121     Cisco Systems, Inc.   Q9/15, Q14/15   2012-08-24
[ 2028 ]  
 
Proposed Text for adding Lock Instruct functions to G.8121.2     Cisco Systems, Inc.   Q9/15, Q14/15   2012-08-24
[ 2027 ]  
 
Proposed Text for adding Lock Instruct functions to G.8121     Cisco Systems, Inc.   Q9/15, Q14/15   2012-08-24
[ 2026 ]  
 
Proposed text for G.8121 Appendix describing PHB flows     Cisco Systems, Inc.   Q9/15   2012-08-24
[ 2025 ]  
 
Updates to G.8121.2 for alignment with G.8121     Cisco Systems, Inc.   Q9/15   2012-08-24
[ 2024 ]  
 
G.fast: Limitations on cyclic prefix length     Swisscom SA   Q4A/15   2012-08-24
[ 2023 ]  
 
Terminology for Performance Monitoring in G.8013/Y.1731     Cisco Systems, Inc.   Q9/15, Q14/15, Q10/15   2012-08-24
[ 2022 ]  
 
G.fast: Requirements for VDSL2 emulation on G.fast hardware     Swisscom SA   Q4A/15   2012-08-24
[ 2021 ]  
 
Proposal for Updating External Commands     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2020 ]  
 
ODU SMP Protocol     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2019 ]  
 
ODU SMP Application Analysis     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2018 ]  
 
Editorial Suggestions for G.smp     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2017 ]  
 
Discussion and Update for ODU SMP Node Functional Model     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2016 ]  
 
Discussion and Proposal for Solving SMP Objectives Open Issues     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2012-08-24
Resultados :452 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-9-24