Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 2265 ]
(Rev.1-2) |
Application Scenario for ODU SMP Deployment in telecom operator's network
|
China Unicom
|
Q9/15
|
2012-08-28 |
|
[ 2264 ]
|
Consideration on ODU SMP Protection Characteristics
|
China Unicom
|
Q9/15
|
2012-08-28 |
|
[ 2263 ]
|
Propose a new equipment model of converged access and transport node
|
ZTE Corporation
|
Q9/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2262 ]
(Rev.1) |
Proposal to study a converged access and transport network
|
ZTE Corporation
|
Q2/15, Q12/15
|
2012-08-28 |
|
[ 2261 ]
(Rev.1) |
Some requirements of noise classification in 100G DWDM system
|
China Unicom
|
Q6/15
|
2012-08-28 |
|
[ 2260 ]
|
Proposal for adding Nyquist WDM in to section 7 7 in G sup39
|
China Unicom
|
Q6/15
|
2012-08-28 |
|
[ 2259 ]
(Rev.1) |
Proposal for defining a parameter about I- and Q- imbalance
|
China
,
China Unicom
,
ZTE Corporation
|
Q6/15
|
2012-08-28 |
|
[ 2258 ]
|
Comment to the proposed draft revised Rec. G.657
|
Ministry of Industry and Information Technology (MIIT)
|
Q5/15
|
2012-08-28 |
|
[ 2257 ]
|
Some parameters consideration on 100G DP-QPSK modulation format
|
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q6/15
|
2012-08-28 |
|
[ 2256 ]
|
Some consideration on low cost metro WDM
|
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q6/15
|
2012-08-28 |
|
[ 2255 ]
|
Extend bit-rate scope to 40/100G in G.697
|
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q6/15
|
2012-08-28 |
|
[ 2254 ]
|
Consideration for ODU SMP supporting ODUflex signal resizing
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15, Q11/15
|
2012-08-28 |
|
[ 2253 ]
|
Some considerations on the ETH-TST and ETH-LCK in Y.1731
|
Ministry of Industry and Information Technology (MIIT)
|
Q10/15
|
2012-08-28 |
|
[ 2252 ]
|
Not used
Duplicate of C-2254
|
N/A (no se aplica)
|
|
2012-08-28 |
|
[ 2251 ]
(Rev.1) |
Propose to promoting the progress of MPLS-TP linear protection
|
Ministry of Industry and Information Technology (MIIT)
|
Q9/15
|
2012-08-28 |
|
[ 2250 ]
|
G.fast: On-Line Reconfiguration - Revisited
|
Futurewei Technologies US R&D Center
|
Q4A/15
|
2012-08-28 |
|
[ 2249 ]
|
A proposal of other alternative OTUkV frame structures for low latency transport
|
Altera Corporation
,
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
|
Q11/15
|
2012-08-28 |
|
[ 2248 ]
|
Proposal for G.multi architecture
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-28 |
|
[ 2247 ]
(Rev.1) |
Clarification to various types of MW-PON systems in G.multi Scope
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-28 |
|
[ 2246 ]
+Corr.1 |
Serial data acquisition by XGPON
|
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2245 ]
|
DVB_ASI Jitter Accumulation over OTN Islands
|
Huawei Technologies Co. Ltd.
,
Huawei Technologies Co. Ltd.
|
Q9/15, Q13/15
|
2012-08-28 |
|
[ 2244 ]
|
Criterion for Minimum Detectable Floor Delay Step using minMATIE
|
Huawei Technologies Co. Ltd.
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2243 ]
|
Effect of Turnaround on Time Transport Performance using PTP
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2242 ]
|
Advantages of the Pdelay Mechanism in Time Transport using PTP for the case where SyncE is not Used for Frequency Transport
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2241 ]
|
Discussion of T-BC/T-TSC Noise Generation for Phase/Time Synchronization using PTP without SyncE Support
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2240 ]
|
Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2239 ]
|
Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2238 ]
|
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2237 ]
|
Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2236 ]
|
G.fast: Performance of channel estimation methods
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-28 |
|
[ 2235 ]
|
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix
|
Q13/15
|
2012-08-28 |
|
[ 2234 ]
|
Clarification on Ethernet transport network architecture in G.8010
|
Hitachi, Ltd.
|
Q12/15
|
2012-08-28 |
|
[ 2233 ]
|
Comments on the latest draft G.8011.4
|
Hitachi, Ltd.
|
Q10/15
|
2012-08-28 |
|
[ 2232 ]
|
Consideration of G.mecp protection architecture
|
Hitachi, Ltd.
|
Q9/15
|
2012-08-28 |
|
[ 2231 ]
|
Proposal on the structure of G.8060 (G.ptneq)
|
Hitachi, Ltd.
|
Q9/15
|
2012-08-28 |
|
[ 2230 ]
|
Proposal for equipment type definition in G.8060 (G.ptneq)
|
Hitachi, Ltd.
|
Q9/15
|
2012-08-28 |
|
[ 2229 ]
|
Proposal for update of G.8101
|
Hitachi, Ltd.
|
Q3/15
|
2012-08-28 |
|
[ 2228 ]
|
Comment on the structure of G.8101
|
Hitachi, Ltd.
|
Q3/15
|
2012-08-28 |
|
[ 2227 ]
|
General discussion on wavelength tuning for G.multi
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2226 ]
|
General discussion on registration for G.multi
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2225 ]
|
Proposed text for ODU SMP Protocol
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2224 ]
|
Proposed text of Commands for G.odusmp
|
China Unicom
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2223 ]
|
Proposal for NG-PON2 TC layer standardization
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2222 ]
|
Editorial proposal for G.smp
|
China Unicom
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2221 ]
|
TC layer framing in TWDM PON
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2220 ]
|
Example scenarios for protection interworking
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2219 ]
|
Proposal of bi-directional failure in G.873.1
|
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2218 ]
|
Unified Power Management for PON systems
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2217 ]
|
Proposal for FEC overhead of OTU5
|
ZTE Corporation; China
|
Q6/15, Q11/15
|
2012-08-28 |
|
[ 2216 ]
|
Proposal to add OTU0 frame in G.709/Y.1331
|
Altera Corporation
,
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
|
Q11/15
|
2012-08-28 |
Resultados :452 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):