Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2009-09-28 : Documentos Temporales  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  TD-WP2 (2009-09-28) 

UIT-T SG15

Transport aspects of Access networks and home networking

Periodo de estudios 2009

Reunión  del 2009-09-28 al 2009-10-09

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  [ 2009-09-28 ]  2009-05-15  2008-12-01 

Resultados :24 documentos
Documentos Temporales  (WP2)  [ Origen: Rapporteur ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 116-WP2 ]  
 
Draft report of the Q7/15 meeting     Rapporteur, Q7/15   Q7/15   2009-10-07
[ 115-WP2 ]  
(Rev.1) 
Draft report of the Q5/15 meeting     Rapporteur, Q5/15   Q5/15   2009-10-07
[ 114-WP2 ]  
 
Outgoing LS -Reply to incoming LS on PON splitters     Rapporteur   Q7/15   2009-10-07
[ 113-WP2 ]  
 
Outgoing LS: Lambda Switch Capable Equipment     Rapporteur   Q6/15   2009-10-07
[ 112-WP2 ]  
 
Report of the Q6/15 meeting     Rapporteur, Q6/15   Q6/15   2009-10-07
[ 111-WP2 ]  
 
Draft meeting report for Q8/15     Rapporteur, Q8/15   Q8/15   2009-10-07
[ 110-WP2 ]  
 
Draft report of Q18/15 meeting     Rapporteur and Associate Rapporteur, Q18/15   Q18/15   2009-10-05
[ 108-WP2 ]  
 
Draft agenda for the Q7/15 meeting, version 1     Rapporteur, Q7/15   Q7/15   2009-10-02
[ 107-WP2 ]  
 
Questionnaire on "FTTx networks"     Rapporteur, Q18/15   Q18/15   2009-10-02
[ 105-WP2 ]  
(Rev.1-4) 
Draft report of Q17/15 meeting     Rapporteur and Associate Rapporteur, Q17/15   Q17/15   2009-10-02
[ 104-WP2 ]  
(Rev.1-2) 
Draft report of Q16/15 meeting     Acting Rapporteur, Q16/15   Q16/15   2009-10-02
[ 102-WP2 ]  
 
Technical inputs for recommendation L.teib "Optical cabling shared with multiple operators in buildings".     Rapporteur, Q16/15   Q16/15   2009-10-01
[ 101-WP2 ]  
 
Examples of FTTx networks in USA     Rapporteur, Q18/15   Q18/15   2009-09-29
[ 100-WP2 ]  
 
Status report for Q8/15     Rapporteur, Q8/15   Q8/15   2009-09-29
[ 99-WP2 ]  
 
Draft agenda for Q8/15 meeting     Rapporteur, Q8/15   Q8/15   2009-09-29
[ 98-WP2 ]  
 
Draft agenda for Question 17/15     Rapporteur, Q17/15   Q17/15   2009-09-29
[ 96-WP2 ]  
 
Draft agenda for Question 18/15     Rapporteur, Q18/15   Q18/15   2009-09-29
[ 95-WP2 ]  
(Rev.1) 
Agenda Q5/15     Rapporteur, Q5/15   Q5/15   2009-09-28
[ 94-WP2 ]  
 
Draft agenda for Question 16/15     Acting Rapporteur, Q16/15   Q16/15   2009-09-28
[ 93-WP2 ]  
(Rev.1) 
Draft agenda for the Q6/15 meeting, version 1     Rapporteur, Q6/15   Q6/15   2009-09-28
[ 83-WP2 ]  
 
Liaison report from IEC SC86A     Liaison Rapporteur to IEC TC86, SC86A   Q5/15   2009-09-24
[ 72-WP2 ]  
 
Summary of replies to TSB Circular 15     Associate Rapporteur, Q16/15   Q16/15   2009-09-14
[ 71-WP2 ]  
 
Draft new Recommendation ITU-T L.cda Optical fibre cables for drop applications     Associate Rapporteur, Q16/15   Q16/15   2009-09-14
[ 69-WP2 ]  
(Rev.1) 
Draft questionnaire on optical fibre identification technologies     Rapporteur, Q17/15   Q17/15   2009-09-14
Resultados :24 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-5-22