Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 13 : Reunión 2009-09-02 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 13  C (2009-09-02) 

UIT-T SG 13

Redes futuras, incluidas las redes móviles y las de la próxima generación

Periodo de estudios 2009

Reunión  del 2009-09-02 al 2009-09-12

Lugar : Argentina [Mar del Plata]

Otras reuniones : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2011-01-17  2010-09-16  2010-04-19  2010-01-29  2009-05-22  2009-01-12 

Resultados :39 documentos
Contribuciones  [ Origen: ETRI ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 392 ]  
 
Proposed a comparative table for Y.OSE-arch     ETRI   Q5/13   2009-08-26
[ 391 ]  
 
Proposal for updating texts on clause 8 in Y.OSE-arch     ETRI   Q5/13   2009-08-26
[ 390 ]  
 
Proposal for updating texts on Y.OSE-arch     ETRI   Q5/13   2009-08-26
[ 386 ]  
 
Proposal for design principle for ID/Loc separation architecture of Y.FAid-loc-split"     ETRI   Q5/13   2009-08-26
[ 385 ]  
 
Proposal for revised draft Recommendation on "Identification and configuration of resources for Multi-Connection (Y.MC-ID)"     ETRI   Q9/13   2009-08-26
[ 384 ]  
 
Suggestion of Text for Introduction in Draft Recommendation Y.MM-WAU     ETRI   Q8/13   2009-08-26
[ 383 ]  
 
Revised Text for Draft Recommendation Y.MM-WAU (v0.4)     ETRI   Q8/13   2009-08-26
[ 374 ]  
 
Proposal for Interworking scenario between IPv4 Node ID and IPv6 Node ID in Y.ipv6split     ETRI   Q7/13   2009-08-26
[ 373 ]  
 
Proposed Texts for the section 6 in Y.ipv6split     ETRI   Q7/13   2009-08-26
[ 372 ]  
 
Revised draft Recommendation on "Framework of ID/LOC separation in IPv6-based NGN (Y.ipv6split)"     ETRI   Q7/13   2009-08-26
[ 371 ]  
 
Proposed Texts for the section 8 in Y.ipv6split     ETRI   Q7/13   2009-08-26
[ 370 ]  
 
Proposal for update texts of mapping procedure for ID/LOC separation in NGN of Y.ipv6split     ETRI   Q7/13   2009-08-26
[ 369 ]  
 
Revised texts for living list on web service architecture over NGN     ETRI   Q12/13   2009-08-26
[ 368 ]  
 
Revised Draft Recommendation Y.UbiNet-hn, Framework of home network using ubiquitous networking     ETRI   Q12/13   2009-08-26
[ 367 ]  
 
Revised Draft Recommendation Y.ipv6-object, Framework of object mapping using IPv6 in NGN     ETRI   Q7/13   2009-08-26
[ 366 ]  
 
Revised figure on high-level architectural model for ubiquitous networking in Y.NGN-UbiNet     ETRI   Q5/13   2009-08-26
[ 365 ]  
 
Responses for France Telecom's comments on Y.NGN-UbiNet     ETRI   Q5/13   2009-08-26
[ 364 ]  
 
Revised Draft Recommendation Y.NGN-UbiNet(Overview and principles for ubiquitous networking in NGN)     ETRI   Q5/13   2009-08-26
[ 300 ]  
 
A Proposal for update of service and capability requirements of Y.USN-reqts     ETRI   Q3/13   2009-08-25
[ 299 ]  
 
A Proposal for update of Clause 1 to 6 Y.USN-reqts     ETRI   Q3/13   2009-08-25
[ 298 ]  
 
A Proposal for update of Appendix in 6 Y.USN-reqts     ETRI   Q3/13   2009-08-25
[ 287 ]  
 
Proposed change of reference configuration model of a Networked Vehicle for draft Y.NGN-vehicle     ETRI (Rep. of Korea)   Q12/13   2009-08-24
[ 286 ]  
 
Proposed NGN functional requirements for draft Y.NGN-vehicle     ETRI (Rep. of Korea   Q12/13   2009-08-24
[ 267 ]  
 
Proposed text of Identification of resources in Y.MC-ID     ETRI   Q9/13   2009-08-24
[ 266 ]  
 
Proposed updated text of vertical multi-homing scenarios for establishing multiple network connections     ETRI   Q7/13   2009-08-24
[ 265 ]  
 
Proposed text of functional architecture of vertical multi-homing     ETRI   Q7/13   2009-08-24
[ 264 ]  
 
Proposed text of vertical multi-homing scenarios as an aspect of each layer's multi-homing capabilities     ETRI   Q7/13   2009-08-24
[ 263 ]  
 
Proposed scenarios for digital sign service over FMC     ETRI (Rep. of Korea)   Q14/13   2009-08-24
[ 262 ]  
 
Proposed supplement for service scenarios over FMC     ETRI (Rep. of Korea)   Q14/13   2009-08-24
[ 261 ]  
 
CPE attachment and detachment scenarios for subscription-based QoS     ETRI   Q4/13   2009-08-24
[ 260 ]  
 
Proposal for Mobile VPN Framework and Scenarios     ETRI   Q8/13   2009-08-24
[ 259 ]  
 
Proposed modification of draft supplement Y.dsnscen "Supplement on DSN scenarios"     ETRI   Q19/13   2009-08-24
[ 258 ]  
 
Proposal of additional requirements for Y.dsnreq     ETRI   Q19/13   2009-08-24
[ 257 ]  
 
Proposed modification of Y.dsnreq     ETRI   Q19/13   2009-08-24
[ 207 ]  
 
New title of Y.hapas     ETRI   Q14/13   2009-08-21
[ 206 ]  
 
General description of profile based application adaptation service     ETRI   Q14/13   2009-08-21
[ 205 ]  
 
Comments on draft recommendation Y.IPTV-TM     ETRI   Q4/13   2009-08-21
[ 198 ]  
 
Proposal of New Work Item on Unified Mobility Control Architecture     ETRI   Q8/13   2009-08-21
[ 193 ]  
 
Proposal of draft new recommendation related to "Security risk management in NGN"     ETRI   Q16/13   2009-08-20
Resultados :39 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-26