Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG05 : Reunión 2012-04-11 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG05  C (2012-04-11) 

UIT-T SG05

ICT and climate change

Periodo de estudios 2009

Reunión  del 2012-04-11 al 2012-04-19

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-10-08  2011-09-20  2011-04-27  2010-11-23  2010-10-01  2010-04-12  2010-01-19  2009-10-12  2009-05-25  2008-11-24 

Resultados :23 documentos
Contribuciones  [ AI/Cuestión: Q21/5 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 472 ]  
 
Proposals towards Q21/5 Recommendation on L.adapter phase2     A1 Telekom Austria AG , Alcatel-Lucent France , Belgacom , British Telecommunications Public Ltd. Co. (BT Plc) , Deutsche Telekom AG , France Télécom Orange , Freescale Semiconductor , Huawei Technologies Co. Ltd.   Q21/5   2012-03-30
[ 471 ]  
 
L.adapter phase2 - proposals for electrical and mechanical characteristics     Telecom Italia S.p.A.   Q21/5   2012-03-30
[ 470 ]  
 
L.adapter phase2 - why World needs a Common Power Supply standard now     Telecom Italia S.p.A.   Q21/5   2012-03-30
[ 464 ]  
 
Structure of the Study on Due Diligence Guidelines for Metals Supply     Dem. Rep. of the Congo   Q21/5   2012-03-30
[ 463 ]  
 
Contribution on L.adapter Phase2 Draft Recommendation     France Télécom Orange   Q21/5   2012-03-30
[ 460 ]  
 
L.adapter phase2 - energy efficiency and no-load proposals     Telecom Italia S.p.A.   Q21/5   2012-03-30
[ 459 ]  
 
L.adapter phase2 - efficiency versus load and equipment behaviour     Telecom Italia S.p.A.   Q21/5   2012-03-30
[ 458 ]  
 
L.adapter phase2 - considerations on failures on present power supplies     Telecom Italia S.p.A.   Q21/5   2012-03-30
[ 446 ]  
 
Prospective work items for recycling management of rare metals of ICT goods     Korea (Rep. of)   Q21/5   2012-03-30
[ 445 ]  
 
Proposal for the initial draft Recommendation of L.rareMetals-measurement, "Measurement method to characterize rare metals of ICT goods"     Korea (Rep. of)   Q21/5   2012-03-30
[ 444 ]  
 
Proposed requirements in L.adapter phase 2     Nippon Telegraph and Telephone Corporation (NTT)   Q21/5   2012-03-30
[ 443 ]  
 
Proposed arrangement of scope and classifications for L.adapter Phase 2     Nippon Telegraph and Telephone Corporation (NTT)   Q21/5   2012-03-30
[ 442 ]  
 
Proposed metrics for Power supply unit in L.M&M     Nippon Telegraph and Telephone Corporation (NTT)   Q21/5, Q17/5   2012-03-30
[ 433 ]  
 
Contribution to L.adapter phase 2 - Power supply interface standardisation for portable devices     Nokia Siemens Networks GmbH & Co. KG   Q21/5   2012-03-29
[ 421 ]  
 
Proposed structure of study report of lithium battery and proposal for a new work recommendation     China Mobile Communications Corporation , China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q21/5   2012-03-29
[ 415 ]  
 
No Load Power and Ripple Voltage Test and Analysis for L.adapterPhase2     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q21/5   2012-03-29
[ 412 ]  
(Rev.1) 
JOINT INDUSTRY INPUT TO ITU-T SG5 Q21/5 BATTERY SIZE STANDARDISATION STUDY     Intel Corporation   Q21/5   2012-03-28
[ 410 ]  
(Rev.1) 
Scope of L.adapter Phase 2     United States   Q21/5   2012-03-28
[ 409 ]  
 
Scope of L.1000 phase 2     Canada   Q21/5   2012-03-28
[ 405 ]  
 
Leveraging and enhancing the ICT Environmental sustainability     Alcatel-Lucent France , France Télécom Orange , Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG , Telecom Italia S.p.A.   Q23/5, Q22/5, Q21/5, Q19/5, Q18/5, Q17/5   2012-03-28
[ 402 ]  
 
Proposed new work item on life-cycle approach for ICT equipment     United Nations Environment Programme   Q21/5   2012-03-28
[ 385 ]  
 
Comments on CATR ID05 Ripple Voltage and No Load Power Test and Investigation for Adapters of ICT Devices     Research in Motion   Q21/5   2012-03-23
[ 384 ]  
 
Comments on CATR Contribution ID02 Study on common mode noise immunity test for touch screen ICT devices     Research in Motion   Q21/5   2012-03-23
Resultados :23 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-6-6