Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG16 : Reunión 2004-11-16 : Documentos Temporales  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG16  TD-WP3 (2004-11-16) 

UIT-T SG16

Terminales, sistemas y aplicaciones multimedia

Periodo de estudios 2005

Reunión  del 2004-11-16 al 2004-11-26

Lugar : Suiza [Ginebra]

Otras reuniones : 2008-10-03  2008-09-05  2008-04-22  2008-02-01  2007-06-26  2007-03-30  2006-11-14  2006-06-13  2006-04-03  2005-07-26  2005-04-08  [ 2004-11-16 ] 

Resultados :42 documentos
Documentos Temporales  (WP3)   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 42-WP3 ]  
 
Q6/16 Draft Report     Q6/16 Rapporteur   Q6/16   2004-11-24
[ 41-WP3 ]  
 
LS reply on progress in the field of Scalable Video Coding (SVC)     Rapporteur Q6/16 & Associate Rapporteur Q6/16   Q6/16   2004-11-24
[ 40-WP3 ]  
 
Open issues on G.729 Annex B in VoIP Applications     Editor   Q10/16   2004-11-24
[ 39-WP3 ]  
(Rev.1) 
Time Schedule for the G.729 based Embedded Variable Bit-Rate (G.729EV) extension to the ITU-T G.729 Speech Codec     Q10/16 Rapporteur   Q10/16   2004-11-24
[ 38-WP3 ]  
 
Q10/16 Draft Report (Geneva, 16-26 November2004)     Q10/16 Rapporteur   Q10/16   2004-11-24
[ 37-WP3 ]  
 
Draft LS to SQEG on progress on G.729EV     Q10/16 Rapporteur   Q10/16   2004-11-24
[ 36-WP3 ]  
(Rev.1) 
Draft revised text for ITU-T T.81|ISO/IEC 10918-1 "Information Technology - Digital compression and coding of continuous-tone still images - requirements and guidelines"     Rapporteur   Q23/16   2004-11-24
[ 35-WP3 ]  
 
LS re addition of the MQ-Codec arithmetic coder to JPEG-1 (ITU-T T.81|ISO/IEC 10918-1)     Q23/16 Rapporteur   Q23/16   2004-11-24
[ 34-WP3 ]  
 
Q23(E)/16 Draft Report     Rapporteur   Q23/16   2004-11-24
[ 33-WP3 ]  
 
Terms of Reference (ToR) for the G.729 based Embedded Variable Bit-Rate (G.729EV) extension to the ITU-T G.729 Speech Codec     Q10/16 Rapporteur   Q10/16   2004-11-24
[ 32-WP3 ]  
 
LS to SQEG on Characterization Test Plan for G.722.1 Annex C     Q10/16 Rapporteur   Q10/16   2004-11-24
[ 31-WP3 ]  
 
Q9/16 Meeting Report     Q9/16 Rapporteur (Acting)   Q9/16   2004-11-24
[ 30-WP3 ]  
 
Draft LS to SQEG on progress in Q.9/16     Q9/16 Rapporteur   Q9/16   2004-11-23
[ 29-WP3 ]  
 
Verification of requirements and objectives using t-test     Q9/16 Rapporteur   Q9/16   2004-11-23
[ 28-WP3 ]  
(Rev.1) +Add.1 
Draft new Recommendation H.264.2 "Reference software for Recommendation H.264"     Q6/16 Rapporteur   Q6/16   2004-11-23
[ 27-WP3 ]  
 
Proposal for a WS on "Video and Image Coding"     SG 16 Chairman   Q6/16   2004-11-22
[ 26-WP3 ]  
 
Terms of Reference for EV-VBR Version 4.0     Q9/16 Rapporteur (Acting)   Q9/16   2004-11-22
[ 25-WP3 ]  
 
Draft New Corrigendum 1 to H.263 (1998; 2000; 2004) "Video coding for low bit rate communication" (for Consent)     Q6/16 Rapporteur   Q6/16   2004-11-22
[ 24-WP3 ]  
 
Draft New Rec. H.264.1 "Conformance specification for Recommendation H.264"     Rapporteur Q.6/16   Q6/16   2004-11-22
[ 23-WP3 ]  
(Rev.1) 
Draft revised Recommendation H.264 "Advanced video coding for generic audiovisual services"     Q6/16 Rapporteur   Q6/16   2004-11-22
[ 22-WP3 ]  
 
Collection of Requirements for Scalability Extension of H.264     Q6/16 Associate Rapporteur   Q6/16   2004-11-19
[ 21-WP3 ]  
 
Qualification test results of the 14khz low-complexity audio coding algorithm at 24, 32, and 48 kbps extension to ITU-T G.722.1     Q10/16 Rapporteur   Q10/16   2004-11-17
[ 20-WP3 ]  
 
Q10/16 Interim Activities (January-November 2004)     Q10/16 Rapporteur   Q10/16   2004-11-16
[ 19-WP3 ]  
+Add.1 
Implementation proposal of v2.0 of ITU-T Software Tools Library DSP Basic Operators     Editor   Q10/16   2004-11-15
[ 18-WP3 ]  
+Add.1-2 
Deliverables for 14 kHz Low-Complexity G.722.1 Extension     Rapporteur   Q10/16   2004-11-12
[ 17-WP3 ]  
 
Proposed time schedule for the embedded extension to the G.729 Speech Codec (G.729EV)     Q10/16 Rapporteur   Q10/16   2004-11-10
[ 16-WP3 ]  
 
Draft ToRs for the G.729EV codec standard     Q10/16 Rapporteur   Q10/16   2004-11-10
[ 15-WP3 ]  
 
Terms of Reference for the future Super Wideband Low-Complexity Audio Coding at 24, 32, and 48 kbit/s extension to ITU-T G.722.1     Q10/16 Rapporteur   Q10/16   2004-11-10
[ 14-WP3 ]  
 
Revised time schedule for the future Super Wideband Low-Complexity Audio Coding at 24, 32, and 48 kbit/s extension to ITU-T G.722.1     Q10/16 Rapporteur   Q10/16   2004-11-10
[ 13-WP3 ]  
 
Qualification Listening and Processing Test Plan of the 14kHz Low-Complexity Audio Coding Algorithm at 24, 32 and 48 kbps Extension to ITU-T G.722.1     Q10/16 Rapporteur   Q10/16   2004-11-10
[ 12-WP3 ]  
 
"Editorial corrections to T.808 | 15444-9"     ISO/IEC JTC1/SC29 Secretariat   Q23/16   2004-11-10
[ 11-WP3 ]  
 
Draft new Recommendation ITU-T/T.802 | ISO/IEC 15444-3 "Information technology - JPEG 2000 image coding system - Part 3: Motion JPEG 2000" (for Consent)     ISO/IEC JTC 1/SC 29 Secretariat   Q23/16   2004-11-02
[ 10-WP3 ]  
+Add.1 
Report of the Q.10/16 Rapporteur's meeting (Lannion, France, 15-18 June 2004)     Q10/16 Rapporteur   Q10/16   2004-10-26
[ 9-WP3 ]  
 
Report of the Q.9/16 Rapporteur's meeting (Lannion, France, 15-18 June 2004)     Q9/16 Rapporteur   Q9/16   2004-11-15
[ 8-WP3 ]  
 
JVT & Q.6/16 Rapporteurs' Meeting report (Palma de Mallorca, Spain, 18-22 Oct 2004)     Q6/16 Rapporteur   Q6/16   2004-11-22
[ 7-WP3 ]  
 
JVT and Q6/16 Rapporteurs' Meeting report (Redmond, Washington, USA, 17-23 July 2004)     Q6/16 Rapporteur   Q6/16   2004-11-22
[ 6-WP3 ]  
 
JVT & Q.6/16 Rapporteurs' Meeting report (Munich, Germany, 15-19 March 2004)     Q6/16 Rapporteur   Q6/16   2004-11-22
[ 5-WP3 ]  
 
Agenda and list of documents for Q10/16     Q10/16 Rapporteur   Q10/16   2004-11-15
[ 4-WP3 ]  
 
Agenda for Q9/16     Q9/16 Rapporteur   Q9/16   2004-11-15
[ 3-WP3 ]  
(Rev.1) 
Q6/16 status, documents, and agenda for Geneva SG 16 Meeting (16-26, Nov 2004)     Q6/16 Rapporteur   Q6/16   2004-11-22
[ 2-WP3 ]  
 
Agenda and list of documents for Q23(E) (ex-QE)/16     Q23(E)/16Rapporteur   Q23/16   2004-11-15
[ 1-WP3 ]  
 
Draft Agenda, work plan and documentation for WP3/16 (Geneva, 16-26 November 2004)     WP 3/16 Chairman   Q9/16, Q6/16, Q23/16, Q10/16   2004-11-12
Resultados :42 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-6-5