Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP1C : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP1C  C 

UIT-R WP1C

Comprobación Técnica del Espectro

Resultados :174 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 99 ]  
 
Working document towards a preliminary draft new Report - Capability evaluation on satellite network monitoring     China (People's Republic of)     2014-05-21
[ 98 ]  
 
Report of the Correspondence Group on Technical Identification of Digital Signals     Chairman, CG Tech. Id. Digital Signals     2014-05-22
[ 97 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[DVB-T_SERVICE_AREA] - Defining the service area of the DVB-T station for fixed reception     Russian Federation     2014-05-21
[ 96 ]  
 
Proposals for revision of Recommendation ITU-R SM.1875-1 - DVB-T coverage measurements and verification of planning criteria     Russian Federation     2014-05-21
[ 95 ]  
 
Proposal for the revision of Report ITU-R SM.2257-1 - Spectrum management and monitoring during major events     Russian Federation     2014-05-21
[ 94 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum monitoring evolution     Chairman, CG on Spectrum Monitoring Evolution   235/1   2014-05-21
[ 93 ]  
 
Review of preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY] - Test procedure for measuring DF accuracy     MEDAV GmbH     2014-05-15
[ 92 ]  
 
Preliminary draft new Recommendation ITU-R SM.[DOC.____] - Inserting highly precise time information in I/Q data of monitoring receivers     Rohde & Schwarz GmbH & Co. KG     2014-05-06
[ 91 ]  
 
Draft revision of Recommendation ITU-R SM.1051-2 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz     United States of America     2014-04-25
[ 90 ]  
 
Proposal for a new Recommendation on storage of I/Q data     Germany (Federal Republic of)     2014-04-22
[ 89 ]  
 
Proposed draft revision of Recommendation ITU-R SM.1268     Germany (Federal Republic of)     2014-04-14
[ 88 ]  
 
Liaison statement to Working Party 1A - Copy to Working Parties 1C, 5A, 5B, 5C and ITU-T Study Group 5 - Recommendations ITU-T K.60 and K.mhn - Coexistence of wired and wireless communication systems     WP 6A     2014-04-10
[ 87 ]  
 
Editorial modification of Report ITU-R SM.2056     Netherlands (Kingdom of the)     2014-03-04
[ 86 ]  
 
Question ITU-R 255/7     SG 7     2014-02-27
[ 85 ]  
 
Liaison statement on human exposure to EMF     ITU-T SG 5     2014-01-21
[ 84 ]  
 
[Proposal for revision of Report ITU-R SM.2211 - Comparison of time-difference-of-arrival and angle-of-arrival methods of signal geolocation]     Russian Federation     2014-01-09
[ 83 ]  
 
[Proposal for revision of Recommendation ITU-R SM.1880 - Spectrum occupancy measurement]     Russian Federation     2014-01-09
[ 82 ]  
 
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz     WP 5B     2013-12-20
[ 81 ]  
 
Liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5, 9 & 15 for action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5C, 5D, 6A, 7B, 7C and 7D por information) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendations ITU-T G.fast and ITU-T J.195 (J.HINOC-REQ)     WP 5B     2013-12-05
[ 80 ]  
 
Liaison statement to Working Party 1C - Draft revision of Recommendation ITU-R SM.1051 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz     WP 4C     2013-09-30
[ 79 ]  
 
Further consideration of the draft revision of Recommendation ITU-R SM.1051-2 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz     Chairman, SG 1     2013-06-18
[ 78 ]  
 
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Activities of ITU-T Study Group 5 related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks     WP 1A     2013-06-14
[ 77 ]  
 
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast     WP 1A     2013-06-14
[ 76 ]  
 
Liaison statement to Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T     WP 1A     2013-06-14
[ 75 ]  
 
Liaison statement to ITU-T Study Group 9 (Copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req)     WP 1A     2013-06-14
[ 74 ]  
+Ann.1-8 
Report of the meeting of Working Party 1C (Geneva, 4 - 11 June 2013)     Chairman, WP 1C     2013-06-11
[ 73 ]  
(Rev.1) 
Final list of participants - Working Party 1C (Geneva, 4-11 June 2013)     Director, BR     2013-06-11
[ 72 ]  
 
List of documents issued (Documents 1C/36 - 1C/72)     BR Study Groups Department     2013-06-03
[ 71 ]  
 
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5 & 9 (copy to ITU-R Working Parties 1C and 5D for information) - Coexistence of wired and wireless communications systems - Revision of Recommendation ITU-T K.60     WPs 5A, 5B and 5C     2013-05-31
[ 70 ]  
 
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Group 15 (copy to ITU-R Working Parties 1C, 5D & 6A for information) - Coexistence of wired and wireless communications systems - Further developments on Recommendation ITU-T G.FAST     WPs 5A, 5B and 5C     2013-05-31
[ 69 ]  
 
Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013)     Chairman, SG 1     2013-05-30
[ 68 ]  
 
Proposals for the preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY]     MEDAV GmbH     2013-05-28
[ 67 ]  
 
Preliminary draft revision of Report ITU-R SM.2257 - Spectrum management and monitoring during major events     Ukraine     2013-05-28
[ 66 ]  
 
Transmitters identification in a DVB-T SFN - The Italian experience     Rai Way S.p.A.     2013-05-28
[ 65 ]  
+Add.1-2 
Report of the Correspondence Group on Technical identification of digital signals     Chairman, CG -Digital Signals     2013-05-28
[ 64 ]  
 
Working document towards a preliminary draft new Report - Technical identification of digital signals     China (People's Republic of)     2013-05-28
[ 63 ]  
 
Working materials towards a future output document on VHF/UHF spectrum monitoring station planning - A network cost-cutting measure in spectrum monitoring station planning     China (People's Republic of)     2013-05-28
[ 62 ]  
 
Comments on working document towards a preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY]     China (People's Republic of)     2013-05-28
[ 61 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION]     Korea (Republic of)     2013-05-28
[ 60 ]  
 
Preliminary draft new Recommendation ITU-R SM.[SPECTRUM_MONITORING_EVOLUTION] - Spectrum monitoring evolution     Korea (Republic of)     2013-05-28
[ 59 ]  
 
Preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY] - Test procedure for measuring DF accuracy     Korea (Republic of)     2013-05-28
[ 58 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1537 - Automation and integration of spectrum monitoring systems with automated spectrum management     United States of America     2013-05-24
[ 57 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[RADIO_VISUALIZING] - The radio source visualizing technology for spectrum monitoring     Japan     2013-05-27
[ 56 ]  
 
Draft revision of Recommendation ITU-R SM.1837     Rohde & Schwarz GmbH & Co. KG     2013-05-22
[ 55 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum Monitoring Evolution     Chairman, CG on Spectrum Monitoring Evolution     2013-05-21
[ 54 ]  
 
Preliminary draft new Recommendation ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum Monitoring Evolution     Chairman, CG on Spectrum Monitoring Evolution     2013-05-21
[ 53 ]  
 
Preliminary draft new Recommendation ITU-R SM[DF_ACCURACY] - Test procedure for measuring DF accuracy     Chairman, CG on DF Accuracy     2013-05-17
[ 52 ]  
 
Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012)     Chairman, SG 1     2013-05-16
[ 51 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1051 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz     United States of America     2013-05-10
[ 50 ]  
 
Liaison statement to ITU-T Study Group 5 and ITU-R Working Party 1A (copy to ITU-R Working Parties 1C, 5A, 5B, and 5C for information) - Coexistence of wired and wireless communications systems     WP 6A     2013-05-08
Resultados :174 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2015-08-28