Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 149 ]
(Rev.1) |
Comments on the working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurements of DF accuracy
|
GEW Technologies (Pty) Ltd.
|
|
2015-05-14 |
|
[ 148 ]
|
Review of working document towards a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurements of DF accuracy
|
MEDAV GmbH
|
|
2015-05-14 |
|
[ 147 ]
|
Proposal for the revision of Recommendation ITU-R SM.1600 - Technical identification of digital signals
|
United States of America
|
|
2015-05-13 |
|
[ 146 ]
|
Proposed modifications to Report ITU-R SM.2257-2 - Spectrum management and monitoring during major events
|
Indonesia (Republic of)
|
|
2015-05-08 |
|
[ 145 ]
|
Preliminary draft new Recommendation ITU-R SM.[DOC. _ _ _ _] - Inserting highly precise time information in I/Q data of monitoring receivers
|
GEW Technologies (Pty) Ltd.
|
|
2015-04-30 |
|
[ 144 ]
|
Report to Working Party 1C on the review of ITU-R Recommendations in the SM Series for the database on ITU-R Recommendations
|
Brazil (Federative Republic of)
|
|
2015-04-24 |
|
[ 143 ]
|
Spectrum management activities for the FIFA Soccer World Cup 2014 Brazil
|
Brazil (Federative Republic of)
|
|
2015-04-24 |
|
[ 142 ]
|
Working document towards the Report ITU-R SM.[PLANNING_SMN] - Optimization of the planning of spectrum monitoring networks topology in VHF/UHF range using irregular model of monitoring networks
|
Ukraine
|
|
2015-03-18 |
|
[ 141 ]
|
Liaison statement to ITU-R Study Groups 1, 3, 4, 5 and 7, ITU-T Study Group 5 and ITU-D Study Groups 1 and 2 - Human exposure to RF fields from broadcast transmitters
|
WP 6A
|
|
2015-03-03 |
|
[ 140 ]
|
Proposal for revision of Report ITU -R SM.2256 - Spectrum occupancy measurements and evaluation
|
Russian Federation
|
|
2015-02-25 |
|
[ 139 ]
|
Draft revision of Recommendation ITU -R SM.1880 - Spectrum occupancy measurement
|
Russian Federation
|
|
2015-02-25 |
|
[ 138 ]
|
This document has been withdrawn
|
BR Study Groups Department
|
|
2015-02-25 |
|
[ 137 ]
|
Liaison statement on comments to the WHO Monograph "Radio Frequency fields: Environmental Health Criteria, Chapter 2: Sources, measurements and exposures"
|
ITU-T SG 5
|
|
2015-02-11 |
|
[ 136 ]
|
Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
|
WP 5D
|
|
2015-02-10 |
|
[ 135 ]
|
Liaison statement on ITU-T Question 7/5 work items for the 2014-2018 study period (reply to ITU-D Study Group 2 - Document 2/113)
|
ITU-T SG 5
|
|
2015-02-10 |
|
[ 134 ]
|
Results of the 21st RAG meeting (Geneva, 24 to 27 June 2014)
|
Chairman, SG 1
|
|
2015-02-06 |
|
[ 133 ]
|
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 , ITU-R Study Group 1, ITU-R Study Group 5, ITU-R Study Group 6 and their relevant Working Parties on Q7/2 work items for the 2014 - 2018 study period
|
ITU-D SG 2
|
|
2014-11-17 |
|
[ 132 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems
|
WP 5A
|
|
2014-11-10 |
|
[ 131 ]
|
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
|
WP 5B
|
|
2014-11-05 |
|
[ 130 ]
|
RF Human hazards - Intersectoral activities
|
Israel (State of)
|
|
2014-10-26 |
|
[ 129 ]
|
Liaison statement to Working Party 1C - Working document towards a preliminary draft new Report ITU-R RA.[SATMON]
|
WP 7D
|
227/7
|
2014-10-17 |
|
[ 128 ]
|
Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)
|
ITU-T SG 9
|
|
2014-09-30 |
|
[ 127 ]
|
Reply liaison statement to Working Party 1C - Information documents on indoor noise measurement
|
WP 3L
|
|
2014-09-15 |
|
[ 126 ]
|
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5
|
ITU-T WP 2/5
|
|
2014-08-08 |
|
[ 125 ]
|
Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems
|
WP 1A
|
|
2014-06-20 |
|
[ 124 ]
|
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - ITU-R interest in K series Recommendations
|
WP 1A
|
|
2014-06-20 |
|
[ 123 ]
|
Liaison statement to the broadband forum (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Specifications and performance of cabling intended for use with G.fast
|
WP 1A
|
|
2014-06-20 |
|
[ 122 ]
|
Liaison statement to ITU-T Study Groups 5 and 15 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Excessive levels of radio frequency noise in the environment
|
WP 1A
|
|
2014-06-20 |
|
[ 121 ]
|
Liaison statement to ITU-T Study Group 15 and Cenelec (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference
|
WP 1A
|
|
2014-06-20 |
|
[ 120 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
|
WP 1A
|
|
2014-06-19 |
|
[ 119 ]
+Ann.1-8 |
Report of the meeting of Working Party 1C (Geneva, 3 - 10 June 2014)
|
Chairman, WP 1C
|
|
2014-06-10 |
|
[ 118 ]
|
Final list of participants - Working Party 1C (Geneva, 3-10 June 2014)
|
Director, BR
|
|
2014-06-10 |
|
[ 117 ]
|
List of documents issued (Documents 1C/74 - 1C/117)
|
BR Study Groups Department
|
|
2014-06-02 |
|
[ 116 ]
|
Interim Report to Working Parties 1A and 1C on the work of the Study Group 1 Co-Rapporteurs on the review of ITU-R Recommendations in the SM Series for the database on ITU-R Recommendations
|
SG 1 Co-Rapporteur
|
|
2014-05-28 |
|
[ 115 ]
(Rev.1) |
Proposed additions to Recommendation ITU-R SM.2039
|
Colombia (Republic of)
|
|
2014-05-27 |
|
[ 114 ]
|
Proposed revision for a preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY] - Test proecedure for measuring DF accuracy
|
Japan
|
|
2014-05-27 |
|
[ 113 ]
|
Information document for Recommendation ITU-R SM.1753-2 - Guide for selection of indoor measurement locations
|
Japan
|
|
2014-05-27 |
|
[ 112 ]
|
Information document for Recommendation ITU-R SM.1753-2 - I/Q data acquisition and data processing technique for radio noise measurement
|
Japan
|
|
2014-05-27 |
|
[ 111 ]
|
Information document for Recommendation ITU-R S.1753-2 - Measurement method for spatial distribution of radio noise in an indoor environment
|
Japan
|
|
2014-05-27 |
|
[ 110 ]
|
Working document toward a draft new Report on technical identification of digital signals
|
Rai Way S.p.A.
|
|
2014-05-27 |
|
[ 109 ]
|
Working document toward preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY]- Test procedure for measuring DF accuracy
|
Korea (Republic of)
|
|
2014-05-27 |
|
[ 108 ]
|
On the characterization of unwanted emissions of digital systems
|
Germany (Federal Republic of)
|
|
2014-05-26 |
|
[ 107 ]
|
How measurement of spectrum occupancy can help spectrum management
|
Germany (Federal Republic of)
|
|
2014-05-26 |
|
[ 106 ]
|
Preliminary draft new Recommendation ITU-R SM.[DOC.----] - Test procedure for measuring DF immunity against distorted wave fronts
|
Rohde & Schwarz GmbH & Co. KG
|
|
2014-05-26 |
|
[ 105 ]
|
Proposal for the revision of ITU-R Report SM.2211 - Proposed update to ITU-R Report SM.2211 on comparison of time-difference-of-arrival and angle-of-arrival methods of signal geolocation
|
United States of America
|
|
2014-05-24 |
|
[ 104 ]
|
Report of Correspondence Group Activity on preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY]
|
CG on DF Accuracy
|
|
2014-05-26 |
|
[ 103 ]
|
Joint liaison statement to Working Party 5B (copy for information to Working Party 1C) - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
|
WPs 5A and 5C
|
240/5
|
2014-05-23 |
|
[ 102 ]
|
Report on activities concerning development of the draft new Report ITU-R SM.[PLANNING_SMN] - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency range
|
Chairman CG on Planning SMN
|
|
2014-05-22 |
|
[ 101 ]
|
Proposals for working document toward preliminary draft new Report on technical identification of digital signals
|
China (People's Republic of)
|
|
2014-05-21 |
|
[ 100 ]
|
Preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY] - Test procedure for measuring DF accuracy
|
China (People's Republic of)
|
|
2014-05-21 |
Resultados :174 documentos Resultados :
-
1 -
2 -
3 -
4
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):