Contribuciones |
|
Número
|
Título
|
Origen
|
Fecha
|
|
[ 590 ]
|
Reply liaison statement to ITU-R Joint Task Group 4-5-6-7 (copy for information to Working Party 5A) - Possible mitigation techniques to address interference to EESS (active) and radiodetermination from the potential use of the frequency bands 5 350-5 470 and/or 5 725-5 850 MHz bay WAS/RLANS
|
WP 5B
|
2014-05-30 |
|
[ 589 ]
|
Guidance for the preparation of concise draft CPM texts for WRC-15 agenda item 1.1 and 1.2
|
Chairman, JTG 4-5-6-7
|
2014-05-22 |
|
[ 588 ]
|
Arrangements for the final meeting of Joint Task Group 4-5-6-7
|
Chairman, JTG 4-5-6-7
|
2014-05-21 |
|
[ 587 ]
|
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.2
|
United Kingdom of Great Britain and Northern Ireland
|
2014-05-16 |
|
[ 586 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy Working Party 5A) - Reply to the Joint Task Group 4-5-6-7 liaison statement on potential mitigation techniques for RLAN interference to EESS (active) in the band 5 350-5 470 MHz
|
WP 7C
|
2014-05-15 |
|
[ 585 ]
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, Joint Task Group 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2., 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)
|
World Meteorological Organization
|
2014-04-28 |
|
[ 584 ]
+Ann.1-12 |
Report on the meeting of Joint Task Group 4-5-6-7 (Geneva, 20-28 February 2014)
|
Chairman, JTG 4-5-6-7
|
2014-03-07 |
|
[ 583 ]
|
Final list of participants - Joint Task Group 4-5-6-7 (Geneva, 20-28 February 2014)
|
Director, BR
|
2014-02-28 |
|
[ 582 ]
|
List of documents issued (Documents 4-5-6-7/393 - 4-5-6-7/582)
|
BR Study Groups Department
|
2014-02-19 |
|
[ 581 ]
|
Liaison statement to Joint Task Group 4-5-6-7 - Technical and operational parameters of BSS (sound) systems in the 1 452-1 492 MHz frequency band to be taken into account for compatibility studies under WRC-15 agenda item 1.1
|
WP 4A
|
2014-02-17 |
|
[ 580 ]
|
Progress Report to Joint Task Group 4-5-6-7
|
Chairman, RG to develop solutions for SAB/SAP
|
2014-02-17 |
|
[ 579 ]
|
Further calculations related to IMT UE OOB emission limits required to protect DTTB reception
|
European Broadcasting Union
|
2014-02-13 |
|
[ 578 ]
|
Critical assessment of and comments on a study provided in Document 4-5-6-7/416
|
Norddeutscher Rundfunk (NDR)
,
Zweites Deutsches Fernsehen
|
2014-02-13 |
|
[ 577 ]
|
Reduced ACLR of LTE UE - The side effect of high efficiency UE power amplifiers
|
Norddeutscher Rundfunk (NDR)
,
Zweites Deutsches Fernsehen
|
2014-02-13 |
|
[ 576 ]
|
Revision of the working document (agenda item 1.2) - Integration of the postprocessing into IP calculations
|
Norddeutscher Rundfunk (NDR)
,
Zweites Deutsches Fernsehen
|
2014-02-13 |
|
[ 575 ]
|
Proposed revision to Annex 5 to Joint Task Group 4-5-6-7 Chairman's Report
|
European Broadcasting Union
|
2014-02-13 |
|
[ 574 ]
|
Preliminary draft new Report ITU-R M./BT.[IMTDTTBLOWERUHF] "Sharing and compatibility studies between digital terrestrial television broadcasting and IMT in the frequency band 470-694/698 MHz"
|
European Broadcasting Union
|
2014-02-13 |
|
[ 573 ]
|
Review of spectrum requirements for IMT
|
ASTRIUM SAS
,
European Space Agency
,
Eutelsat S.A.
,
HISPASAT, S.A.
,
Inmarsat Plc.
,
Intelsat
,
LS telcom AG
,
SES WORLD SKIES
,
THALES Communications
|
2014-02-13 |
|
[ 572 ]
|
Study on the impact of the aggregate interference originating from IMT stations into FSS space station receivers in the band 5 925-6 425 MHz
|
Inmarsat Plc.
|
2014-02-17 |
|
[ 571 ]
|
Proposed revisions to draft CPM text on WRC-15 agenda item 1.1 - Proposed revisions to the draft CPM text, as contained in Attachment 5 of Annex 7 to Document 4-5-6-7/393 are shown below
|
Inmarsat Plc.
|
2014-02-17 |
|
[ 570 ]
|
Proposed revisions to framework for a working document towards a preliminary draft new Report ITU-R [C-BAND DOWNLINK]
|
Inmarsat Plc.
|
2014-02-13 |
|
[ 569 ]
|
Proposals on working document towards preliminary draft CPM text for WRC-15 agenda item 1.2
|
Egypt (Arab Republic of)
,
United Arab Emirates
|
2014-02-13 |
|
[ 568 ]
|
IARU position on WRC-15 agenda item 1.1
|
International Amateur Radio Union
|
2014-02-12 |
|
[ 567 ]
|
Some aspects and implications of adding further time elements to the Mont Carlo simulation methodology
|
Motorola Solutions Inc.
|
2014-02-13 |
|
[ 566 ]
|
Observations on the results on 5 GHz RLAN characteristics debate with some results of simulations
|
United Kingdom of Great Britain and Northern Ireland
|
2014-02-13 |
|
[ 565 ]
|
Determination of 700 MHz band UE OOBE limit for the protection of DTT fixed roof-top reception
|
Orange
|
2014-02-17 |
|
[ 564 ]
|
A method for deriving IMT UE OOB emissions, required to protect DTTB reception, based on IMT network changes (events)
|
Broadcast Networks Europe
|
2014-02-13 |
|
[ 563 ]
|
IMT UE OOB emissions required to protect DTTB reception
|
Broadcast Networks Europe
|
2014-02-13 |
|
[ 562 ]
|
Comparison of average power and number of UE operating at maximum power
|
Broadcast Networks Europe
|
2014-02-13 |
|
[ 561 ]
|
The effect of not including building entry standard deviation on interference probability
|
Broadcast Networks Europe
|
2014-02-13 |
|
[ 560 ]
|
Confidence in Monte Carlo simulations
|
Broadcast Networks Europe
|
2014-02-13 |
|
[ 559 ]
|
Determining power control settings for use in Monte Carlo simulations
|
Broadcast Networks Europe
|
2014-02-13 |
|
[ 558 ]
|
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.2
|
Angola (Republic of)
,
Benin (Republic of)
,
Botswana (Republic of)
,
Burkina Faso
,
Burundi (Republic of)
,
Cameroon (Republic of)
,
Comoros (Union of the)
,
Côte d'Ivoire (Republic of)
,
Djibouti (Republic of)
|
2014-02-13 |
|
[ 557 ]
|
Modelling of potential interference from IMT uplink to fixed rooftop digital terrestrial receivers
|
Angola (Republic of)
,
Benin (Republic of)
,
Botswana (Republic of)
,
Burkina Faso
,
Burundi (Republic of)
,
Cameroon (Republic of)
,
Comoros (Union of the)
,
Côte d'Ivoire (Republic of)
,
Djibouti (Republic of)
|
2014-02-13 |
|
[ 556 ]
|
Sharing between IMT systems and radars in the 2 700-2 900 MHz band
|
Sweden
|
2014-02-13 |
|
[ 555 ]
|
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.1, frequency range 5 350-5 470 MHz and 5 725-5 850 MHz
|
Sweden
|
2014-02-13 |
|
[ 554 ]
|
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.1, Section 1/1.1/3.2.1 frequency range 470 to 694 MHz
|
Sweden
|
2014-02-13 |
|
[ 553 ]
|
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.1, general consideration regarding allocation and use
|
Sweden
|
2014-02-13 |
|
[ 552 ]
|
Candidate frequency bands for IMT
|
Italy
|
2014-02-13 |
|
[ 551 ]
|
Compatibility study between MS and ARNS in 694-790 MHz
|
Finland
,
France
,
Germany (Federal Republic of)
,
Latvia (Republic of)
,
Lithuania (Republic of)
,
Norway
,
Poland (Republic of)
,
Sweden
|
2014-02-13 |
|
[ 550 ]
|
Study of rain fade depth on FSS frequency bands
|
GSM Association
|
2014-02-13 |
|
[ 549 ]
|
Proposed modification to working document towards preliminary draft CPM text on satellite issues
|
GSM Association
|
2014-02-13 |
|
[ 548 ]
|
Proposed amendments to draft CPM text associated with the frequency ranges 1 300-1 400 MHz; 2 025-2 110 MHz and 2 200-2 290 MHz; 2 700-2 900 MHz; and 2 900-3 100 MHz
|
Telstra Corporation Ltd.
|
2014-02-13 |
|
[ 547 ]
|
DTT receivers at TV coverage edge
|
GSM Association
|
2014-02-13 |
|
[ 546 ]
|
Consideration of proposed method for post-processing of Monte Carlo modelling results and modelling assumptions
|
GSM Association
|
2014-02-13 |
|
[ 545 ]
|
Modelling of adjacent band compatibility between IMT and DTT
|
GSM Association
|
2014-02-13 |
|
[ 544 ]
|
Co-channel coexistence between IMT and DTT in 470 - 694/698 MHz
|
GSM Association
|
2014-02-13 |
|
[ 543 ]
|
Analysis of required mitigation for IMT systems and radars to share the 1 300-1 400 MHz band
|
GSM Association
|
2014-02-13 |
|
[ 542 ]
|
Sharing between IMT systems and radars in the 1 300-1 400 MHz band
|
GSM Association
|
2014-02-13 |
|
[ 541 ]
|
Analysis of required mitigation for IMT systems and radars to share the 2 700-2 900 MHz band
|
GSM Association
|
2014-02-13 |
Resultados :715 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):