Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 290 ]
|
Proposed modifications to the working document toward a PDNR ITU-R SA.[EES/MET CHAR]
|
EUMETSAT
|
141/7, 139/7
|
2011-09-14 |
|
[ 289 ]
|
Additional studies for WRC-12 Agenda item 1.24 and related proposal to revise Report ITU-R SA.2164 in accordance with activities identified in the CPM Report
|
EUMETSAT
|
141/7, 139/7
|
2011-09-14 |
|
[ 288 ]
|
Notification and recording of frequency assignments to space launchers
|
France
|
|
2011-09-14 |
|
[ 287 ]
|
Report of RAG activities
|
Chairman, SG 7
|
|
2011-09-05 |
|
[ 286 ]
|
Preliminary draft new Recommendation ITU-R SA.[EES/MET METH] - Methodology for determining protection criteria for MetSat and EESS services
|
United States of America
|
|
2011-08-30 |
|
[ 285 ]
|
Separation distances for AES and SRS Earth stations in the bands 7 145- 7 235 MHz and 8 400-8 500 MHz using IF-77
|
United States of America
|
|
2011-08-30 |
|
[ 284 ]
|
Liaison statement to WP 3M - Use of the IF-77 program in calculating separation distances for AES and SRS earth stations
|
United States of America
|
|
2011-08-30 |
|
[ 283 ]
|
Draft new Question ITU-R XXX/7 - Characteristics and spectrum requirements of nanosatellites, picosatellites and systems composed of such satellites
|
United States of America
|
|
2011-08-11 |
|
[ 282 ]
|
Preliminary draft revision of Recommendation ITU-R SA.1414
|
United States of America
|
|
2011-08-11 |
|
[ 281 ]
|
ITU-R Study Group 5 Recommendation ITU-R F.1107-2 - Probabilistic analysis for assessing interference into the fixed service from satellites using the geostationary orbit
|
BR Study Group Department
|
|
2011-08-09 |
|
[ 280 ]
|
Questions assigned to Radiocommunication Study Group 7 - Science services
|
Chairman, SG 7
|
|
2011-07-28 |
|
[ 279 ]
|
Liaison statement to ITU-R Working Party 4A, Working Party 5A, Working Party 5B, Working Party 6A, Working Party 7B for information only - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
|
WP 5D
|
|
2011-07-26 |
|
[ 278 ]
|
Liaison statement to Working Parties 4A, 4C, 5B, 5C, 7B, 7C and 7D - On proposed revisions to Recommendation ITU-R M.1732
|
WP 5A
|
|
2011-06-27 |
|
[ 277 ]
|
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 7B and 7C - Status of studies in support of WRC-12 Agenda item 1.20
|
WP 5C
|
|
2011-06-24 |
|
[ 276 ]
|
Liaison statement to relevant Working Parties of ITU-R Study Groups 4, 5, 6 and 7 - Status of studies in support of WRC-12 Agenda item 1.5
|
WP 5C
|
|
2011-06-24 |
|
[ 275 ]
|
Liaison statement to Working Party 7B - Development of Recommendations ITU-R SA.1275-3 and ITU-R SA.1276-3
|
WP 5C
|
|
2011-06-23 |
|
[ 274 ]
|
Liaison statement to ITU-R Working Parties 1A, 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Revisions of F-Series Recommendations on the interference criteria (Recommendations ITU-R F.758-4 and ITU-R F.1495-1)
|
WP 5C
|
|
2011-06-22 |
|
[ 273 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and relegvant Working Parties (copy to ITU-T Study Group 15) - Activities regarding the protection range calculation between inductive systems and radiocommunication services using frequencies below 30 MHz
|
WP 1A
|
|
2011-06-10 |
|
[ 272 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and relevant Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment
|
WP 1A
|
|
2011-06-10 |
|
[ 271 ]
|
Liaison statement to Study Groups 4, 6 and 7 and Working Parties 5A, 5B, 5C and 5D on a database for the protection of radio services
|
SG 1
|
|
2011-06-08 |
|
[ 270 ]
|
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 7 and copy to ITU-T Study Groups 9 and 15 for information) Further work on power line telecommunications
|
WP 6A
|
|
2011-05-20 |
|
[ 269 ]
|
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 7 and copy to ITU-T Study Groups 9 and 15 for information) - Further work on power line telecommunications
|
WP 6A
|
|
2011-05-20 |
|
[ 268 ]
|
Progress of the studies requested by WRC Resolutions and Recommendations (except those related to WRC-12 Agenda items)
|
Chairman, SG 7
|
|
2011-05-16 |
|
[ 267 ]
|
Initial review of ITU-R Resolutions of specific concern to the scope of Study Group 7
|
Chairman, SG 7
|
|
2011-05-16 |
|
[ 266 ]
|
Liaison statement to Working Parties 4A, 5A, 5C, 7B and 7C (copied to Working party 3M for information) - Sharing studies related to WRC-12 Agenda item 1.25
|
WP 4C
|
|
2011-05-04 |
|
[ 265 ]
|
Note to Chairmen of Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Consideration of draft revision of Recommendation ITU-R F.758-4
|
Chairman, WP 5C
|
|
2011-04-01 |
|
[ 264 ]
|
Liaison statement to ITU-R SG 7 on continued work of ITU-D SG 2 Question 22-1/2: utilization of Telecommunications/ICT for disaster preparedness, mitigation and response
|
ITU-D SG 2
|
|
2011-03-28 |
|
[ 263 ]
|
ITU-R Study Group 5 Report to be brought to the attention of Study Groups 4 and 7
|
BR Study Group Department
|
|
2011-03-11 |
|
[ 262 ]
|
ITU-R Study Group 1 Recommendation SM.1541-3 to be brought to the attention of Study Groups 4, 5, 6 and 7
|
BR Study Group Department
|
|
2010-02-07 |
|
[ 261 ]
|
ITU-R Study Group 4 Recommendation ITU-R S.1003-2 to be brought to the attention of Study Groups 5, 6 and 7
|
BR Study Group Department
|
|
2011-01-24 |
|
[ 260 ]
|
Response to Document 5/214 from the Chairman of Study Group 7 on consideration of the adoption of Recommendations and a Report by Study Group 5
|
Chairman, SG 5
|
|
2011-01-17 |
|
[ 259 ]
|
This document has been withdrawn
|
WP 5C
|
|
2011-01-10 |
|
[ 258 ]
|
Liaison statement to Working Party 7B copy to Working Party 4C for information - Application of Recommendations ITU-R P.452 and ITU-R P.528 in calculating the required separation distances between SRS Earth stations and MSS AES
|
WP 3M
|
|
2010-12-08 |
|
[ 257 ]
|
Liaison statement to Working Parties 1A, 1C, 4A, 5A, 5D, 7B and 7D - Spreadsheet implementation of the clear-air portion of Recommendation ITU-R P.452-14
|
WP 3M
|
|
2010-12-08 |
|
[ 256 ]
|
Liaison statement to Working Parties of ITU-R Study Groups 4, 6 and 7, as well as Working Parties 5A, 5B and 5D - Studies in support of WRC-12 Agenda item 1.5
|
WP 5C
|
|
2010-11-22 |
|
[ 255 ]
(Rev.1) |
Liaison statement to ITU-R Study Groups - Methodology for calculation of maximum [PERMISSIBLE] power flux-density limits for the protection of digital terrestrial television broadcasting services from interference generated by mobile services including IMT systems where identified in the Radio Regulations
|
WP 6A
|
|
2010-11-08 |
|
[ 254 ]
+Ann.1-3 |
Report on the October 2010 meeting of Working Party 7B with a view to its next meeting (September 2011) (Geneva, 5-11 October 2010)
|
Chairman, WP 7B
|
|
2010-10-13 |
|
[ 253 ]
(Rev.1) |
Final List of Participants - Working Party 7B (Geneva, 5-8 October 2010)
|
Director, BR
|
|
2010-10-08 |
|
[ 252 ]
|
List of documents issued
|
BR Study Group Department
|
|
2010-10-04 |
|
[ 251 ]
|
Proposed modifications to preliminary draft new Report ITU-R SA.[BANDWIDTH REQU]- Spectrum requirements for future SRS missions operating under a potential new SRS allocation in the band 22.55-23.15 GHz
|
United States of America
|
|
2010-09-28 |
|
[ 250 ]
|
Preliminary draft new Recommendation on protection criteria and interference assessment methods for non-GSO inter-satellite links at 23 GHz [ISS-NON-GSO]
|
United States of America
|
|
2010-09-28 |
|
[ 249 ]
|
Preliminary draft new Recommendation on protection criteria and interference assessment methods for non-GSO inter-satellite links at 23 GHz[ISS-NON-GSO]
|
France
|
|
2010-09-28 |
|
[ 248 ]
|
Proposed revisions to working document toward a preliminary draft new Recommendation ITU-R SA.[EES/MET SHAR] - Sharing among systems using bands allocated to the Earth exploration-satellite and meteorological-satellite services
|
United States of America
|
|
2010-09-27 |
|
[ 247 ]
|
Preliminary draft new Report ITU-R SA.[23 GHz SRS EXCEPT HIBLEO-2 COMPAT] - Compatibility between the space research service (Earth-to-space) and the systems in the fixed, mobile and inter-satellite service in the band 22.55-23.15 GHz
|
United States of America
|
|
2010-09-27 |
|
[ 246 ]
|
Preliminary draft new Report ITU-R SA.[SRS SHARING 37 GHz] - Protection of SRS and FSS systems sharing the 37.5-38 GHz band
|
United States of America
|
211/7
|
2010-09-27 |
|
[ 245 ]
|
Applicability of Recommendation ITU-R P.452 and ITU-R P.528 in calculating the required separation distances between SRS earth stations and MSS AES
|
United States of America
|
|
2010-09-27 |
|
[ 244 ]
|
Proposed revisions to working document toward a preliminary draft new Recommendation ITU-R SA.[EES/MET CHAR] - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services and for conducting sharing studies
|
United States of America
|
|
2010-09-27 |
|
[ 243 ]
|
Proposed modifications to preliminary draft new Report ITU-R SA.[BANDWIDTH REQU] - Spectrum requirements for future SRS missions operating under a potential new SRS allocation in the band 22.55-23.15 GHz
|
European Space Agency (ESA)
|
|
2010-09-27 |
|
[ 242 ]
|
Draft CPM text on WRC-12 Agenda item 1.11 - Suitable values for separation distances between SRS and FS stations in neighbouring countries in the band 22.55-23.15 GHz
|
European Space Agency (ESA)
|
|
2010-09-27 |
|
[ 241 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and interested Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment
|
WP 1A
|
|
2010-07-22 |
Resultados :315 documentos Resultados :
-
1 -
2 -
3 -
4 -
5 -
6 -
7
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):