Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP7A : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP7A  C 

UIT-R WP7A

Emisiones de frecuencias patrón y de señales horarias

Resultados :61 documentos
Resultados :  1 - 2  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 62 ]  
+Ann.1-3 
Report on the meeting of Working Party 7A (Geneva, 26-30 September 2011)     Chairman, WP 7A     2011-10-03
[ 61 ]  
 
Final List of Participants - Working Party 7A (Geneva, 26-30 September 2011)     Director, BR     2011-09-30
[ 59 ]  
 
List of documents issued     BR Study Group Department     2011-09-23
[ 58 ]  
 
Proposed new Recommendation - Relativistic time transfer in the vicinity of the Earth and in the solar system     United States of America     2011-09-13
[ 57 ]  
 
Report of RAG activities     Chairman, SG 7     2011-09-05
[ 56 ]  
 
Questions assigned to Radiocommunication Study Group 7 - Science services     Chairman, SG 7     2011-07-28
[ 55 ]  
 
Progress of the studies requested by WRC Resolutions and Recommendations (except those related to WRC-12 Agenda items)     Chairman, SG 7     2011-05-16
[ 54 ]  
 
ITU-R Study Group 5 Report to be brought to the attention of Study Groups 4 and 7     BR Study Group Department     2011-03-11
[ 53 ]  
 
Response to Document 5/214 from the Chairman of Study Group 7 on consideration of the adoption of Recommendations and a Report by Study Group 5     Chairman, SG 5     2011-01-17
[ 52 ]  
+Ann.1-3 
Report of the meeting of Working Party 7A - (Geneva, 5-11 October 2010)     Chairman, WP 7A     2010-10-13
[ 51 ]  
(Rev.1) 
Final List of Participants - Working Party 7A (Geneva, 5-11 October 2010)     Director, BR     2010-10-11
[ 50 ]  
 
List of documents issued     BR Study Group Department     2010-10-04
[ 49 ]  
 
A SDH-based high precision time synchronous method     China (People's Republic of)   207-2/7   2010-09-21
[ 48 ]  
 
Proposed new Question - Relativistic effects in the transfer of time and frequency in the solar system     United States of America     2010-09-16
[ 47 ]  
 
Report of RAG activities     Chairman, SG 7     2010-06-07
[ 46 ]  
 
Liaison statement to Working Parties 5A, 5C, 7A, 7B, 7C and 7D regarding potential candidate bands for BSS feeder links under WRC-12 Agenda item 1.13     WP 4A     2010-04-30
[ 45 ]  
 
Liaison statement to the relevant Working Parties of Study Groups 4, 5, 6 and 7 (copy to ITU-T Study Group 15 for information) - Further work on power line telecommunications     WP 1A   221-1/1   2010-03-01
[ 44 ]  
 
Draft Liaison statement to Working Parties 4A, 4C, 5A, and 6A (copy to Working Parties 5B, 5C, 7A, 7B, 7C and Study Group 3) on WRC-12 Agenda item 1.2     WP 1B     2010-02-17
[ 43 ]  
+Ann.1 
Report of the meeting of Working Party 7A - (Geneva, 8 - 11 September 2009)     Chairman, WP 7A     2009-09-14
[ 42 ]  
 
Final List of Participants - Geneva, 8-11 September 2009     Director, BR     2009-09-11
[ 41 ]  
 
List of documents issued     BR Study Group Department     2009-09-07
[ 40 ]  
 
New definition of UTC     International Bureau of Weights and Measures (BIPM     2009-08-31
[ 39 ]  
 
Preliminary proposals on the future of coordinated universal time (UTC) - Standard-frequency and time-signal emissions     China (People's Republic of)   236/7   2009-09-01
[ 38 ]  
 
WRC-12 Agenda item 7 - Modification to advance publication of information of a satellite network or system not subject to coordination procedure under Section II of Article 9 of the Radio Regulations     France     2009-08-26
[ 37 ]  
 
WRC-12 Agenda item 7 - Examination of frequency assignments to an inter-satellite link of a geostationary space station communicating with a non-geostationary space station     France     2009-08-26
[ 36 ]  
 
WRC-12 Agenda item 7 - Correction to the averaging bandwidth prescribed in Annex 2 of Appendix 4 to the Radio Regulations     France     2009-08-26
[ 35 ]  
 
Working document towards a preliminary draft new Recommendation (or Report) - Distant clock comparison by pulsar Giant Radio Pulses     Russian Federation   250/7   2009-08-28
[ 34 ]  
 
Timing information from global navigation satellite systems (GNSS) and their augmentations     France   248/7   2009-08-28
[ 33 ]  
 
Proposed preliminary draft new Recommendation ITU-R TF.[TRUSTED TIME SOURCE] - Trusted time source for time stamp authority     Japan   238/7   2009-08-26
[ 32 ]  
 
Preliminary draft revision of Recommendation ITU-R TF.1153-2 - The operational use of two-way satellite time and frequency transfer employing PRN codes     Germany (Federal Republic of)   250/7   2009-08-21
[ 31 ]  
 
Liaison statement - Report of the 1st meeting of the Focus Group on Future Networks (FG-FN)     Chairman, ITU-T Focus Group on FN     2009-07-28
[ 30 ]  
 
Liaison statement to Working Party 7C (for information to Working Parties 3L, 5B and 7A) - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671 (WRC-07))     WP 5C     2009-05-29
[ 29 ]  
 
Reply to liaison statement from Working Party 7C (copy to Working Parties 3L and 7A for information) - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671 (WRC-07)     WP 5B     2009-05-29
[ 28 ]  
 
Liaison statement to Working Party 7A - "Timing information from global navigation satellite systems (GNSS) and their augmentation systems"     WP 4C     2009-05-14
[ 27 ]  
 
Information on activities and output documents of ITU-T Focus Group ICTs & CC     Chairman ITU-T FG ICTs & CC     2009-04-02
[ 26 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2009-03-20
[ 25 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 3L and 7A for information) - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671 (WRC-07))     WP 7C     2009-02-27
[ 24 ]  
 
Liaison statement to Working Party 5B (copy to Working Parties 3L and 7A for information) - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda Item 1.16 (Resolution 671 (WRC-07))     WP 7C     2009-02-27
[ 23 ]  
 
Liaison statement to Working Party 5B (copy to WPs 5A, 6A, 7A and 7D for information) - Sharing studies required for WRC-11 Agenda item 1.15     WP 5C     2008-10-31
[ 22 ]  
+Ann.1-3 
Report on the meeting of Working Party 7A (Geneva, 8-13 October 2008)     Chairman, WP 7A     2008-10-14
[ 21 ]  
 
Final List of Participants - Working Party 7A (Geneva, 8-13 October 2008)     Director, BR     2008-10-13
[ 20 ]  
 
List of documents issued     BR Study Group Department     2008-10-07
[ 19 ]  
 
Report of studies on the future of UTC     Chairman, WP 7A   237/7   2008-09-29
[ 18 ]  
 
Proposals for revision of Recommendation ITU-R TF.460-6 - Standard-frequency and time-signal emissions     China (People's Republic of)   236/7   2008-09-26
[ 17 ]  
 
Proposed Preliminary draft new ITU-R Question - Time and frequency information from ''enhanced" LORAN (eLORAN)     United States of America     2008-09-24
[ 16 ]  
 
Proposed Preliminary draft new ITU-R Question - Timing information from augmentations of Global Navigation Satellite Systems (GNSS)     United States of America     2008-09-24
[ 15 ]  
 
Liaison statement to Working Parties 5A, 5B, 5C, 7A and 7D - Sharing studies required for WRC-11 Agenda item 1.15     WP 6A     2008-06-12
[ 14 ]  
 
Liaison reply to Working Party 4C (copied to Working Parties 3J, 3K, 3L, 3M, 7A, 7B, 7C, 7D, 4A, 4B, 6A, 6B, 6C, 1A, 1B, 1C, 5A, 5B, 5C and 5D for information) - Studies related to WRC-11 Agenda item 1.25     WP 6A     2008-06-11
[ 13 ]  
 
Reply to ITU-R WP 7A liaison on modification of UTC     ITU-T SG15   236/7   2008-05-09
[ 12 ]  
 
Liaison statement to Working Parties 7A, 7B, 7C, 7D, 4A, 4B, 6D, 6X, 6G, 1A, 1B, 1C, 5A, 5B, 5C and 5D (copy for information to Working Parties 3J, 3K, 3L and 3M) - Information for studies related to WRC-11 Agenda item 1.25     WP 4C     2008-04-22
Resultados :61 documentos
Resultados :  1 - 2  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2011-11-23