Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP1A : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP1A  C 

UIT-R WP1A

Técnicas de ingeniería del espectro

Resultados :167 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 117 ]  
 
Modification to the working document towards a preliminary draft new Recommendation - Power line high data rate telecommunications systems     NABA   221/1   2006-09-22
[ 116 ]  
 
Information for the effects of radio frequency (RF) lighting device noise on the performance of 802.11B wireless local area network (WLAN) in the 2.4 GHz ISM band     Korea (Republic of)     2006-09-22
[ 115 ]  
 
Recommendation ITU-R SM.1056 - Limitation of radiation from industrial, scientific and medical (ISM) equipment     Korea (Republic of)   70/1   2006-09-22
[ 114 ]  
 
Recommendation to be brought to the attention of WPs 1A and 6E     BR Study Group Department     2006-09-21
[ 113 ]  
 
Recommendations to be brought to the attention of Working Party 1A     BR Study Group Department     2006-09-20
[ 112 ]  
(Rev.1) 
Proposal of a new study Question     Germany (Federal Republic of)     2006-09-20
[ 111 ]  
 
Liaison statement to Task Group 1/9 and Working Party 1A - Mathematical inconsistency when linking the FSS OoB domain mask of Annex 5 of Recommendation ITU-R SM.1541 and the FSS spurious emission limit of RR Appendix 3     WP 4A     2006-09-11
[ 110 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1134     Russian Federation     2006-07-25
[ 109 ]  
 
Overview of FM modulator interference to broadcast services     North American Broadcasters Association   32/6   2006-08-08
[ 108 ]  
 
Liaison statement to Working Parties 3J and 3M, copy to Working Party 1A and ITU-T Study Group 15 - Fixed service applications using frequency bands above 3 000 GHz     WP 9B     2006-07-24
[ 107 ]  
 
Liaison statement to WP's 1A, 1B, 4A, 4-9S, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and TG 1/9, and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336     WP 9D     2006-07-19
[ 106 ]  
 
Liaison statement to Working Parties 1A and 1C - Working party 8B rapporteur and Co-Chairman of JRG-1A/1C/8B     WP 8B     2006-05-01
[ 105 ]  
 
LS to WP 1A - Coordination of an Earth station in studies on frequency sharing and coordination criteria     WP 8D     2006-03-17
[ 104 ]  
 
Liaison statement to WP 1A - Bands between 275 and 3 000 GHz, and above     WP 9B     2005-12-22
[ 103 ]  
 
Liaison statement to WPs 1A, 1B, 4A, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and to TG 1/9 and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336     WP 9D     2005-12-21
[ 102 ]  
 
Draft Liaison statement to WP 1A and TG 1/9 - Comments regarding the use of the OoB domain masks in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1/9 (Agenda item 1.20)     WP 4A     2005-12-09
[ 101 ]  
 
Response to liaison statement from Working Party 1A - Necessary bandwidth of standard frequency and time signals     WP 7A     2005-11-22
[ 100 ]  
 
Liaison statement to Working Party 1A - Bands between 275 and 3 000 GHz     WP 7D     2005-11-22
[ 99 ]  
 
Liaison statement to Working Party 1A - Impact of cable and power line telecommunications systems on radiocommunications systems operating in the LF, MF, HFand VHF bands below 80 MHz     WP 7A     2005-11-22
[ 98 ]  
 
Liaison statement to Working Parties 1A and 9C and ITU-T Study Group 5 - Draft New Recommendation - Protection requirements for broadcasting systems operating in the LF, MF, HF and VHF bands below 80 MHz against the impact of power line telecommunication (PLT) systems     WP 6E     2005-10-18
[ 97 ]  
 
Liaison statement to WPs 1A and 8B - Compatibility studies between aeronautical mobile telemetry systems and systems operating under primary radiocommunication services in 4 500-4 800 MHz and 5 925-6 700 MHz bands identified as candidates for further study     WP 3M     2005-10-11
[ 96 ]  
 
Liaison statement to WP 1A - Response to the liaison statement concerning bands between 275 and 3 000 GHz     WPs 3J and 3M     2005-10-11
[ 95 ]  
+Ann.1-15 
Chairman's report - Meeting 26-30 September 2005     Chairman, WP 1A     2005-10-11
[ 94 ]  
 
Liaison statement to WPs 1A, 3J, 3K and 3M - Compatibility studies between aeronautical mobile telemetry systems and systems operating under primary radiocommunication services in 4 500-4 800 MHz and 5 925-6 700 MHz bands identified as candidates for further study     WP 8B     2005-09-29
[ 93 ]  
 
Final List of Participants - Working Party 1A     Director, BR     2005-09-29
[ 92 ]  
 
Liaison statement from ITU-D Study Group 2 to the next meeting of ITU-R Radiocommunication Advisory Group (RAG) and to ITU-R Study Group 1 Working Party 1A (31 October - 4 November 2005)     ITU-D SG 2     2005-09-27
[ 91 ]  
 
List of documents issued     BR Study Group Department     2005-09-23
[ 90 ]  
 
Text for revision of Recommendation ITU-R SM.337-4 - Frequency and distance separations     Korea (Republic of)     2005-09-22
[ 89 ]  
 
Proposal of deletion of Question ITU-R Q.211/1 (1997)     France     2005-09-16
[ 88 ]  
 
Proposal of Revision SM.1235 (1997)     France     2005-09-16
[ 87 ]  
 
Proposal of suppression of Recommendation SM. 669-1 (1993)     France     2005-09-16
[ 86 ]  
 
Proposed amendments of Recommendation ITU-R SM.328-10 - Spectra and bandwidth of emissions     Korea (Republic of)   76/1   2005-09-19
[ 85 ]  
 
Proposal of activation of the SG 1 Group of Redaction     SG 1 Rapporteur to the CCV     2005-09-19
[ 84 ]  
 
Impact of high-speed data rate telecommunication systems using electrical power lines on broadcasting receivers and other systems     Brazil (Federative Republic of)     2005-09-20
[ 83 ]  
 
Draft revision to working document toward a preliminary draft Report on the consideration of the use of frequencies between 275 and 3 000 GHz     United States of America     2005-09-20
[ 82 ]  
 
Energy problems and prevention of global warming (Question ITU-R 210/1)     Japan Aerospace Exploration Agency (JAXA)   210/1   2005-09-16
[ 81 ]  
 
Proposal of the extension regardin gthe termination year of Question ITU-R 210/1 to 2010 from 2005 - A response to Question ITU-R 210/1 and interference analyses between SSPS in the ISM bands and existing radio services     Japan Aerospace Exploration Agency (JAXA)   210/1   2005-09-16
[ 80 ]  
 
Liaison statement to Working Parties 1A, 4A and 8D - Comments regarding the use of the OOB domain masks in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1/9 (Agenda item 1.20)     TG 1/9     2005-09-19
[ 79 ]  
 
ITU-R SM. Series Recommendations under responsibility of WP 1A     France     2005-08-02
[ 78 ]  
 
Questions assigned to Study Group 1 and corresponding ITU-R SM.series Recommendation in force     France     2005-08-02
[ 77 ]  
 
Joint Rapporteur Group - Report of the Second Meeting, May 24-26, 2004     JRG 1A-1C-8B     2005-07-28
[ 76 ]  
 
Proposed amendments to Recommendation ITU-R SM.328-10 - Spectra and bandwidth of emissions     Russian Federation     2005-07-27
[ 75 ]  
 
Liaison statement to Working Parties 1A, 7D, 8A, 8B and 9D     IPG     2005-07-22
[ 74 ]  
 
Liaison statement to Working Party 1A (Copy to study Group 7) - Bands above 275 GHz     WP 8A     2005-05-16
[ 73 ]  
 
Liaison statement to Working Party 1A - Protection criteria for fixed service systems below 30 MHz from high data rate telecommunication systems using electricity power supply distribution wiring     WP 9C   221/1   2005-05-16
[ 72 ]  
 
Liaison statement to Working Parties 1A, 1B, 4A, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and to Task Groups 1/8 and 1/9, and Joint Task Group 6-8-9 - Revision of Recommendation ITU-R F.1336     WP 9D     2005-05-02
[ 71 ]  
 
Draft Revision of Recommendation ITU-R BS.1660-1 - Technical basis for planning of terrestrial digital sound broadcasting in the VHF band     WP 6E   56/6   2005-04-29
[ 70 ]  
 
Liaison statement to Working Party 1A - Protection requirements of broadcasting systems against interference caused by wired telecommunication systems, using an electric power supply     WP 6E   32/6   2005-04-21
[ 69 ]  
 
Liaison statement to WP 1A - Proposal of OoB domain emission limits for ISDB-T system to be included in Recommendation ITU-R SM.1541-1, Annex 6     WP 6E     2005-04-12
[ 68 ]  
 
Liaison statement to WPs 1A, 3L and 6E - Impact of cable and power line telecommunications systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     WP 7D   221/1   2005-03-29
Resultados :167 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2004-02-23