International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Meeting 2017-05-15 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  TD (2017-05-15) 

ITU-T SG 5

Environment and climate change

Study Period 2017

Meeting  from 2017-05-15 to 2017-05-24

held in Switzerland [Geneva]

Other Meetings : 2021-11-30  2021-05-11  2020-10-19  2020-05-11  2019-09-16  2019-05-13  2018-09-11  2018-05-21  2018-03-05  2017-11-13  [ 2017-05-15 ] 

Results:14 total items.
Temporary Documents  (GEN)  [ AI/Question: Q4/5 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 153-GEN ]  
(Rev.1-2) 
New Work Item proposal of a Technical Report on "Analysis of EMC aspects and definition of requirements for 5G mobile systems"     Co-rapporteur Q4/5   Q4/5   2017-05-18
[ 145-GEN ]  
 
Draft Recommendation K.prox "Immunity requirements for telecommunication equipment in close proximity use of wireless devices"- for consent     Co-rapporteur Q4/5   Q4/5   2017-05-18
[ 144-GEN ]  
 
2nd draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipment"     Co-rapporteur Q4/5   Q4/5   2017-05-18
[ 143-GEN ]  
 
Draft K.wire-line_emc -Electromagnetic compatibility requirements for wire-line telecommunication network equipment- Product family Recommendation     Co-rapporteur Q4/5   Q4/5   2017-05-18
[ 142-GEN ]  
 
The second draft of K.light "EMC requirements of disturbances from lighting equipment located in the telecommunication equipment room"     Co-rapporteur Q4/5   Q4/5   2017-05-18
[ 132-GEN ]  
(Rev.1) 
The draft of k.bwenv "Electromagnetic (EM) environment of body worn equipment in the 2.4 GHz and 13.56MHz ISM band"     Associate Rapporteur Q4/5   Q4/5   2017-05-17
[ 130-GEN ]  
(Rev.1) 
Draft ITU-T Recommendation K.Radio.EMC - Electromagnetic Compatibility requirement for radio telecommunication equipment     Co-rapporteur Q4/5   Q4/5   2017-05-16
[ 126-GEN ]  
 
Report of ACEC meeting in Arlington, Virginia, on 3 and 4 May 2017     Liaison Rapporteur to ACEC   Q5/5, Q4/5, Q3/5, Q2/5, Q1/5   2017-05-16
[ 121-GEN ]  
(Rev.1-2) 
Draft Report of Working Party 1/5 (Geneva, 15-24 May 2017)     Chairman WP1/5   Q5/5, Q4/5, Q3/5, Q2/5, Q1/5   2017-05-14
[ 114-GEN ]  
(Rev.1-2) 
Draft Report of Question 4/5 (Geneva, 15-24 May 2017)     Rapporteur Q4/5   Q4/5   2017-05-14
[ 64-GEN ]  
(Rev.1-4) 
Draft agenda for Question 4/5 meeting (Geneva, 15-24 May 2017)     Co-rapporteur Q4/5   Q4/5   2017-04-26
[ 59-GEN ]  
(Rev.1-2) 
Draft agenda for Working Party 1/5 meeting (Geneva, 15-24 May 2017)     Chairman WP1/5   Q5/5, Q4/5, Q3/5, Q2/5, Q1/5   2017-04-26
[ 12-GEN ]  
 
LS/i on ongoing collaboration [from ITU-D Study Group 2]     ITU-D Study Group 2   Q9/5, Q8/5, Q7/5, Q6/5, Q4/5, Q10/5   2017-01-31
[ 11-GEN ]  
 
LS/i on ongoing collaboration Reference to Document: 2/REP/30 [from ITU-D Study Group 2]     ITU-D Study Group 2   Q9/5, Q8/5, Q7/5, Q6/5, Q4/5, Q10/5   2017-01-31
Results:14 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-7