International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Meeting 2017-05-15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  C (2017-05-15) 

ITU-T SG 5

Environment, climate change and circular economy

Study Period 2017

Meeting  from 2017-05-15 to 2017-05-24

held in Switzerland [Geneva]

Other Meetings : 2021-11-30  2021-05-11  2020-10-19  2020-05-11  2019-09-16  2019-05-13  2018-09-11  2018-05-21  2018-03-05  2017-11-13 

Results:21 total items.
Contributions  [ AI/Question: Q2/5 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 75 ]  
 
Characteristics of Metal Oxide Varistors (MOVs) for the protection of telecommunications installations     Huawei Technologies Co., Ltd.   Q2/5   2017-05-03
[ 74 ]  
 
The lightning test proposal of the Ethernet port and errata in K.20, K.21 and K.45     Huawei Technologies Co., Ltd.   Q2/5   2017-05-03
[ 73 ]  
 
The lightning test proposal of the USB in K.20 and K.21     Huawei Technologies Co., Ltd.   Q2/5   2017-05-03
[ 71 ]  
 
3-Electrode GDT operation in Ethernet circuits     Bourns Limited   Q2/5   2017-05-02
[ 64 ]  
 
Appendix proposal for K.99 on GDT Component Form Factors     Bourns Limited   Q2/5   2017-05-02
[ 55 ]  
 
Review of K.20, K.21, K.44 and K.45 - Part 3 K.44 generators and test circuits     Bourns Limited   Q2/5   2017-05-02
[ 54 ]  
 
Review of K.20, K.21, K.44 and K.45 - Part 2 K.20, K.21 and K.45 Test tables columns 4 and 5     Bourns Limited   Q2/5   2017-05-02
[ 40 ]  
(Rev.1) 
Review of K.20, K.21, K.44 and K.45 - Part 1 K.20, K.21 and K.45 Test tables columns 1 through 3     Bourns Limited   Q2/5   2017-04-29
[ 32 ]  
(Rev.1) 
Proposed change on flowchart for K.44 to select resistibility level of equipment in customer premises being discussed     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-04-28
[ 27 ]  
(Rev.1) 
Draft of K.rcd "Technical requirements for residual current operated protective devices with automatic-reclosing devices for telecom uses".     China Telecommunications Corporation   Q2/5   2017-04-28
[ 22 ]  
 
Proposed study on safety of bridging by SPD between primary and external circuit     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-04-27
[ 19 ]  
 
The 3rd draft of Recommendation K.appl4: Surge Protective Component Application Guide - Lightning Isolation Transformers     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-04-27
[ 13 ]  
 
Definitions for AC supply configurations     Bourns Limited   Q2/5   2017-04-15
[ 12 ]  
 
Updating K.20/K.21/K.45 2.1.5 and 2.1.6 test comments for C.002 six output 8/20 generator     Bourns Limited   Q2/5   2017-04-14
[ 10 ]  
 
Draft K.appl4 - High frequency signal isolation transformers version     Bourns Limited   Q2/5   2017-03-31
[ 8 ]  
(Rev.1) 
ITU K.20 Ethernet test level     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-28
[ 7 ]  
(Rev.1) 
ITU K.44 Figure A.6.7-5 figure edit     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-28
[ 6 ]  
(Rev.1) 
ITU K.51 Edits     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-22
[ 5 ]  
(Rev.1) 
Revision proposals for K.99     EPCOS AG   Q2/5   2017-03-20
[ 4 ]  
(Rev.1) 
K.50 editorial changes and correct definitions use     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-10
[ 2 ]  
(Rev.1-2) 
Replacement K.44 Figure A.3-4 - 8/20 current generator     Bourns Limited   Q2/5   2017-02-27
Results:21 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-21