Contributions
[ Source: ZTE ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1171 ]
(Rev.1) |
Application scenario of flexible OTN based on logical channel model
|
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (CATR)
,
ZTE Corporation
|
Q11/15
|
2015-06-01 |
|
[ 1138 ]
|
Clause 17.2: Calibration
|
Verizon Communication Corporation
,
ZTE Corporation
|
Q2/15
|
2014-11-11 |
|
[ 1133 ]
|
Clause 17.1: Announcement
|
Futurewei Technologies US R&D Center
,
Verizon Communication Corporation
,
ZTE Corporation
|
Q2/15
|
2014-11-11 |
|
[ 1038 ]
|
Proposal of ODU SMP
|
ZTE Corporation
|
Q9/15
|
2014-11-11 |
|
[ 1037 ]
|
Proposed protection for a failure of interconnected link in G.MDSP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2014-11-11 |
|
[ 1036 ]
|
Consideration on network objective in G.mdsp
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2014-11-11 |
|
[ 1019 ]
|
Proposal for Clause 13 and Appendix II
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q2/15
|
2014-11-11 |
|
[ 1015 ]
|
Consideration on the interconnected link at the domain boundary
|
China Unicom
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2014-11-11 |
|
[ 984 ]
|
Management of media channel and signal connections
|
ZTE Corporation
|
Q14/15, Q12/15, Q11/15
|
2014-11-10 |
|
[ 970 ]
|
Market Drivers and Timing for B100G OTN Standardization and IaDI Considerations
|
Alcatel-Lucent USA Inc.
,
Coriant GmbH & Co. KG
,
Telefon AB - LM Ericsson
,
ZTE Corporation
|
Q11/15
|
2014-11-10 |
|
[ 966 ]
|
Proposal to specify the EVM related parameters of 100G transmitters in G.698.2
|
China Unicom
,
Deutsche Telekom AG Standardization
,
EXFO Inc.
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q6/15
|
2014-11-10 |
|
[ 937 ]
|
Implementation of protection with ONU wavelength tuning
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q2/15
|
2014-11-10 |
|
[ 936 ]
|
Proposal for power saving by tuning
|
China Unicom
,
ZTE Corporation
|
Q2/15
|
2014-11-10 |
|
[ 934 ]
|
PLOAM message for wavelength tuning in TWDM-PON
|
ZTE Corporation
|
Q2/15
|
2014-11-10 |
|
[ 927 ]
|
Proposal on Sync Management and OAM
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q13/15, Q10/15
|
2014-11-10 |
|
[ 925 ]
|
Experiments and analysis on automatic asymmetry compensation
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q13/15
|
2014-11-10 |
|
[ 917 ]
|
Requirements of centralized call and connection management for the ASDTN
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q14/15
|
2014-11-10 |
|
[ 893 ]
|
Considerations about APR procedure for multi lane interface systems in G.664
|
ZTE Corporation
|
Q6/15
|
2014-11-10 |
|
[ 892 ]
|
Further clarification on EVM calculation in G.698.2
|
ZTE Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
|
Q6/15
|
2014-11-10 |
|
[ 830 ]
|
Consideration on OPU and Logical Channel Unit frame structure
|
ZTE Corporation
|
Q11/15
|
2014-11-07 |
|
[ 829 ]
|
Buffer and delay evaluation of logical channel mapping and multiplexing model
|
ZTE Corporation
|
Q11/15
|
2014-11-07 |
|
[ 828 ]
|
A new type of ODUflex
|
ZTE Corporation
|
Q11/15
|
2014-11-07 |
|
[ 827 ]
|
Apply logical channel mapping and multiplexing model to current OTN
|
ZTE Corporation
|
Q11/15
|
2014-11-07 |
|
[ 826 ]
|
Consideration on OTN Frame-base Mapping Procedure
|
ZTE Corporation
|
Q11/15
|
2014-11-07 |
|
[ 825 ]
|
A new model of OTN mapping and multiplexing
|
ZTE Corporation
|
Q11/15
|
2014-11-07 |
|
[ 779 ]
|
Description of basic functions for an SLPS Network of TWIN concept
|
Huawei Technologies Co. Ltd.
,
Orange
,
Portugal Telecom, SGPS, S.A.
,
Telefónica, S.A.
,
Verizon Communication Corporation
,
ZTE Corporation
|
Q12/15
|
2014-09-26 |
|
[ 761 ]
|
Proposed model for the OTUCn and OTSi layers for OTN beyond 100G
|
ZTE Corporation
|
Q12/15, Q11/15
|
2014-03-11 |
|
[ 760 ]
|
Considerations on the timing of the OTN B100G amendment for G.709
|
China Telecommunications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q12/15, Q11/15
|
2014-03-11 |
|
[ 737 ]
|
Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 736 ]
|
Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 735 ]
|
Proposal on Synchronization OAM in packet networks
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q10/15
|
2014-03-11 |
|
[ 716 ]
|
Proposal to add XPolM effect in G.697
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2014-03-11 |
|
[ 713 ]
|
Proposed parameters for WDM1r in G.984.5
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 712 ]
|
Experimental results of EVM related parameters of QPSK transmitter
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2014-03-11 |
|
[ 711 ]
|
Proposal for Preconfigured Backup Channel Attributes
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 710 ]
|
Considerations about Addition of the Generic DSP Demodulation Flow in G.sup39
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2014-03-11 |
|
[ 709 ]
|
Comments on Clause 13 of G.989.3
|
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Verizon Communication Corporation
,
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 707 ]
|
G.hn: Text Proposal for low power mechanism
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q18/15
|
2014-03-11 |
|
[ 705 ]
|
1588 PTP into OTUk overhead via GFP
|
ZTE Corporation
,
China Telecommunications Corporation
,
Ministry of Industry and Information Technology (MIIT)
|
Q11/15
|
2014-03-11 |
|
[ 702 ]
|
Boundary Clock and Transparent Clock functional model of 1588 over OTN
|
ZTE Corporation
,
Ministry of Industry and Information Technology (MIIT)
|
Q11/15
|
2014-03-11 |
|
[ 701 ]
|
Transparent clock model of 1588 over OTN
|
ZTE Corporation
,
Ministry of Industry and Information Technology (MIIT)
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 700 ]
|
Requirement of 1588 Transparent Clock function in OTN
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 698 ]
(Rev.1) |
Components interaction for virtualization in Transport SDN
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q12/15
|
2014-03-11 |
|
[ 697 ]
|
G.hn: Discussion on method for creating a secure G.hn domain
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q18/15
|
2014-03-11 |
|
[ 696 ]
|
Self-configuration requirement of CCN in Transport SDN
|
China Mobile Communications Corporation
,
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q12/15
|
2014-03-11 |
|
[ 693 ]
|
Hierarchy architecture of Transport SDN based on G.8080 components
|
ZTE Corporation
|
Q14/15, Q12/15
|
2014-03-11 |
|
[ 692 ]
|
Interworking requirement of CCN in Transport SDN
|
China Mobile Communications Corporation
,
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q12/15
|
2014-03-11 |
|
[ 691 ]
|
proposal for TWDM PON Protection in G.989.1
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 690 ]
(Rev.1) |
G.hn: New Power Saving Mechanism
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q18/15
|
2014-03-11 |
|
[ 682 ]
|
Rogue ONU consideration for TWDM-PON
|
ZTE Corporation
|
Q2/15
|
2014-03-11 |
Results:190 total items. Result page:
Previous -
1 -
2 -
3 -
4
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):