International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:105 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  [ Source: Orange ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2195 ]  
 
Comments to the new baselined clause 18 in G.989.3A1     ADTRAN , Calix Networks, Inc. , Nokia Corporation , Orange , Verizon Communication Corporation   Q2/15   2016-09-06
[ 2156 ]  
+Corr.1 
Proposal to modify procedural agreement between Q11 and Q6 regarding strong HD-FEC     Deutsche Telekom AG , Acacia , Alcatel-Lucent USA , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Q6/15, Q11/15   2016-09-06
[ 2148 ]  
(Rev.1-2) 
Staircase FEC as a candidate for Standard OTU4 MV IaDI Metro application     Deutsche Telekom AG , Acacia , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Q6/15, Q11/15   2016-09-06
[ 2142 ]  
 
Revision of the description of cross-polarization modulation     Huawei Technologies Co., Ltd. , Orange   Q7/15   2016-09-06
[ 2123 ]  
 
Proposal to add more details on ToD (GNSS Status Message Payload) interface definition     Orange   Q13/15   2016-09-06
[ 2122 ]  
 
Informational contribution on ionospheric effects during PRTC measurement     Orange   Q13/15   2016-09-06
[ 2121 ]  
 
High Performance atomic clock stability from the perspective of ePRTC.     Orange   Q13/15   2016-09-06
[ 2120 ]  
 
T-BC requirements for the case where syncE input is lost.     Orange   Q13/15   2016-09-06
[ 2119 ]  
 
3GPP recent work on network assisted synchronization (NAS) for cellular networks.     Orange   Q13/15   2016-09-06
[ 2118 ]  
 
Additional table for phase/time requirements for cluster-based synchronization (G.8271).     ADVA Optical Networking , Orange   Q13/15   2016-09-06
[ 2117 ]  
 
Interoperability between EEC and eEEC (G.8262.1 and G.8262 clocks).     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-09-06
[ 2116 ]  
 
HRMs for cluster-based synchronization (G.8271.1).     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-09-06
[ 2115 ]  
 
Use case for G.8271.2     Orange   Q13/15   2016-09-06
[ 2114 ]  
 
Preliminary fronthaul requirements for 5G.     Orange   Q13/15   2016-09-06
[ 2081 ]  
 
APTS network limit of G.8271.2 and noise generation of G.8273.4     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-09-06
[ 2079 ]  
 
Proposals for G.8266 clock with GNSS receiver and G.8272.1 scope     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-09-06
[ 2077 ]  
 
SyncE clock ID of G.8264     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-09-06
[ 2056 ]  
(Rev.1) 
Propose to start the standardization of longitudinal compatibility of repeatered system     China Mobile Communications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) , Orange   Q8/15   2016-09-05
[ 2041 ]  
 
Request for information about the SG15/Q6 working process and time schedule to address the application codes and use cases of operators, as well as their interoperability needs at 100G.     China Telecommunications Corporation , Orange   Q6/15   2016-09-05
[ 2025 ]  
 
Contributed text for a recommendation on Reach Extenders for XGS-PON     Futurewei Technologies US R&D Center , Orange   Q2/15   2016-09-05
[ 2008 ]  
 
Motivation for support of Reach Extenders (incl. Dual rate) in XGS-PON     Orange   Q2/15   2016-09-05
[ 1930 ]  
 
Starting with Sub-Lambda Photonic Switching Network (SLPSN) Standardization, definition of the scope     Electronics and Telecommunications Research Institute (ETRI) , KT Corporation , Orange   Q12/15   2016-09-02
[ 1827 ]  
 
Transmission of non-G.8275.1 PTP messages     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-02-02
[ 1826 ]  
 
Extended SSM message of OTN     Huawei Technologies Co., Ltd. , China Mobile Communications Corporation , Orange   Q13/15, Q11/15   2016-02-02
[ 1814 ]  
 
Proposal precautions for the use of GNSS receivers     Orange   Q13/15   2016-02-02
[ 1813 ]  
 
Observed GPS UTC information malfunction - for information     Orange   Q13/15   2016-02-02
[ 1757 ]  
 
Clarifications and further considerations on WD16 of Pisa meeting     China Unicom , Orange   Q13/15   2016-02-02
[ 1749 ]  
 
G.8272.1 transient response     A1 Telekom Austria AG , ADVA Optical Networking , Deutsche Telekom AG , Microsemi Corporation , Orange   Q13/15   2016-02-02
[ 1748 ]  
 
G.8272.1 MTIE mask short term     A1 Telekom Austria AG , ADVA Optical Networking , Deutsche Telekom AG , Microsemi Corporation , Orange   Q13/15   2016-02-02
[ 1729 ]  
 
Dual-rate support in XGS-PON     British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , Orange , ZTE Corporation   Q2/15   2016-02-02
[ 1561 ]  
(Rev.1) 
G.fast 212 MHz amendment     AT&T, Inc. , Orange , TELUS Communications   Q4/15   2016-01-29
[ 1523 ]  
 
Follow-up on G.8275.2: Requirement for an Accurate T3 Value     Orange   Q13/15   2016-01-22
[ 1522 ]  
 
Summary on G.8266 for finalization.     Orange   Q13/15   2016-01-22
[ 1521 ]  
 
Clarification on the timing accuracy specification for the 1PPS measurement interface     Huawei Technologies Co., Ltd. , Orange , Telefon AB - LM Ericsson   Q13/15, Q11/15   2016-01-22
[ 1520 ]  
 
Editorial on ToD from the contribution WDPisa32     Orange   Q13/15   2016-01-22
[ 1519 ]  
 
Phase/time synchronization over Microwave networks     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-01-22
[ 1518 ]  
 
Additional information on frequencyTraceable Flag of G.8275.1     Orange   Q13/15   2016-01-22
[ 1517 ]  
 
Text modification under section 6.4 of G.8275.1     China Unicom , Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-01-22
[ 1516 ]  
 
PTP interfaces requirements for G.8266     Orange   Q13/15   2016-01-22
[ 1515 ]  
 
Proposal to study Synchronization over Ethernet in the Fronthaul (G.8271)     Orange   Q13/15   2016-01-22
[ 1514 ]  
 
Functional Block diagram for ePRTC     Orange   Q13/15   2016-01-22
[ 1506 ]  
(Rev.1-2) 
Metro 100G WDM interface for optical transport networks     Acacia Communications, Inc , China Telecommunications Corporation , Orange , Telecom Italia S.p.A.   Q6/15   2016-01-20
[ 1501 ]  
(Rev.1) 
Standardization of optical switching (photonic sub-lambda switching): what for?  
C-1501 Rev.1 corrects the Source information. There is no change to the content of the Contribution.
 
Huawei Technologies Co., Ltd. , Orange , Portugal Telecom , Telefónica S.A. , Verizon Communication Corporation   Q12/15   2016-01-15
[ 1440 ]  
 
Physical Interfaces for Telecom Grand Master for frequency (G.8266)     Huawei Technologies Co., Ltd. , Orange   Q13/15   2015-06-09
[ 1438 ]  
 
Illustration of Packet Delay Variation (PDV) over GPON (access network) technology     Orange   Q4/15, Q2/15, Q13/15   2015-06-09
[ 1437 ]  
 
G.8273.2 Mandatory 1PPS output interface for Telecom Slave Clock (T-TSC).     A1 Telekom Austria AG , AT&T, Inc. , China Mobile Communications Corporation , Deutsche Telekom AG , Orange , Swisscom SA , Verizon Communication Corporation   Q13/15   2015-06-09
[ 1415 ]  
(Rev.1) 
100G WDM interface for optical transport networks     Orange   Q6/15   2015-06-09
[ 1413 ]  
 
G.fast Amendment 2 Priorities     AT&T, Inc. , British Telecommunications Public Ltd. Co. (BT Plc) , CenturyLink , Deutsche Telekom AG , Orange , Swisscom SA , Telecom Italia S.p.A.   Q4/15   2015-06-09
[ 1403 ]  
 
G.997.1 modifications to support G.993.2 profile 35b and G.993.2 Annex B revision     Deutsche Telekom AG , Orange , Swisscom SA , Telecom Italia S.p.A.   Q4/15   2015-06-09
[ 1392 ]  
 
Proposal for PTP profile using T-TC     Microsemi , NEC Corporation , Orange   Q13/15   2015-06-09
Results:105 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-4