International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:360 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  [ Source: China ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2044 ]  
 
Proposal of communication channel from TEE to HEE in G.metro     China Unicom   Q6/15   2016-09-05
[ 2043 ]  
 
EVM related test results     China Unicom   Q6/15   2016-09-05
[ 2041 ]  
 
Request for information about the SG15/Q6 working process and time schedule to address the application codes and use cases of operators, as well as their interoperability needs at 100G.     China Telecommunications Corporation , Orange   Q6/15   2016-09-05
[ 2018 ]  
 
Consideration on Network Resource Slicing in G.asdtn     China Telecommunications Corporation , ETRI , Huawei Technologies Co., Ltd.   Q14/15, Q12/15   2016-09-05
[ 2017 ]  
 
G.vlc: Draft working text for the new G.vlc Recommendation     Huawei Technologies Co., Ltd. , China Academy of Telecommunication Research (CATR) , Marvell Semiconductor Inc. , Ministry of Industry and Information Technology (MIIT)   Q18/15   2016-09-05
[ 2012 ]  
 
The suggestion about YANG module of MPLS-TP OAM based on G.8113.1     China Mobile Communications Corporation , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT)   Q14/15, Q10/15   2016-09-05
[ 1995 ]  
 
The suggestion about YANG module based on MPLS-TP     China Mobile Communications Corporation , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT)   Q14/15, Q10/15   2016-09-05
[ 1990 ]  
(Rev.1) 
Proposal on adding appendix of cabinet structure illustration to draft L.oxcon  
C1990 Revision 1 corrects the sources. There is no change to the content of the Contribution
 
Ministry of Industry and Information Technology (MIIT) , China Mobile , Commscope Connectivity Belgium , FiberHome Technologies   Q16/15   2016-09-05
[ 1943 ]  
 
Parameters for pilot tones and message channel for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Telefon AB - LM Ericsson   Q6/15   2016-09-02
[ 1942 ]  
 
Appendix on Principles of Operation for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Telefon AB - LM Ericsson   Q6/15   2016-09-02
[ 1940 ]  
 
Proposal of a new supplement on 25 Gb/s transmission per wavelength     Broadcom Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , ZTE Corporation   Q2/15   2016-09-02
[ 1918 ]  
 
Proposal to start a new project to specify CPRI over OTN phase 2     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-09-01
[ 1917 ]  
(Rev.1-2) 
CPRI over OTN phase II extension     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd. , Intel Corporation , IP Light , Xilinx Incorporation   Q11/15   2016-09-01
[ 1915 ]  
 
100G/B100G multi-vendor FlexO based SOTUm interface family     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-09-01
[ 1906 ]  
 
G.hn: Interoperability of different secure admission mechanisms     China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q18/15   2016-09-01
[ 1827 ]  
 
Transmission of non-G.8275.1 PTP messages     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-02-02
[ 1826 ]  
 
Extended SSM message of OTN     Huawei Technologies Co., Ltd. , China Mobile Communications Corporation , Orange   Q13/15, Q11/15   2016-02-02
[ 1820 ]  
 
ToD protocol     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q13/15   2016-02-02
[ 1794 ]  
 
Cascaded and nested protection     China Unicom , Huawei Technologies Co., Ltd.   Q9/15, Q11/15   2016-02-02
[ 1790 ]  
 
Test result for multi-domain nested protection     China Unicom   Q9/15   2016-02-02
[ 1788 ]  
 
Test result for multi-domain cascaded protection     China Unicom   Q9/15   2016-02-02
[ 1768 ]  
 
Architecture discussion of G.metro     China Unicom   Q6/15   2016-02-02
[ 1767 ]  
 
Synchronization performance monitoring with Probe     ADVA Optical Networking , China Unicom   Q13/15   2016-02-02
[ 1766 ]  
 
XGS-PON TC considerations on XGS-PON and XG-PON1 co-existence     ZTE Corporation , China Unicom   Q2/15   2016-02-02
[ 1757 ]  
 
Clarifications and further considerations on WD16 of Pisa meeting     China Unicom , Orange   Q13/15   2016-02-02
[ 1756 ]  
 
Coexistence Solution discussion for XGS-PON     China Unicom   Q2/15   2016-02-02
[ 1755 ]  
 
Performance requirements for passive node elements with ID tags     China Unicom   Q16/15   2016-02-02
[ 1753 ]  
 
Proposals and Discussion Points for Revised Recommendation G.781     Huawei Technologies Co., Ltd. , China Mobile Communications Corporation   Q13/15   2016-02-02
[ 1729 ]  
 
Dual-rate support in XGS-PON     British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , Orange , ZTE Corporation   Q2/15   2016-02-02
[ 1726 ]  
 
Values proposed for table B.II.1 of G.XGS-PON     China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q2/15   2016-02-02
[ 1725 ]  
 
G.hn: Updated text for parts of G.9978Recommendation     China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q18/15   2016-02-02
[ 1716 ]  
 
Consideration on Mapping Components in ACTN to G.asdtn     China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co., Ltd.   Q14/15, Q12/15   2016-02-01
[ 1715 ]  
 
Proposed Text to update Node Behavior in G.otnsmp     China Unicom , Huawei Technologies Co., Ltd.   Q9/15   2016-02-01
[ 1714 ]  
 
Proposal of the description of cross-polarisation modulation     China Unicom , Huawei Technologies Co., Ltd.   Q7/15, Q6/15   2016-02-01
[ 1705 ]  
 
Consideration on Mapping Interface Requirement in ACTN to G.asdtn     China Telecommunications Corporation , Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co., Ltd.   Q14/15, Q12/15   2016-02-01
[ 1703 ]  
(Rev.1) 
Further analysis of measurements on EVM and OSNR     China Unicom , Coriant GmbH & Co. KG , Keysight Technologies Deutschland GmbH   Q6/15   2016-02-01
[ 1699 ]  
 
G.vlc: Proposal for supporting the mobility and interference mitigation in G.vlc     Huawei Technologies Co., Ltd. , China Telecommunications Corporation   Q18/15   2016-02-01
[ 1686 ]  
 
Eye diagram Mask for XGS-PON     Huawei Technologies Co., Ltd. , China Telecommunications Corporation , ZTE Corporation   Q2/15   2016-02-01
[ 1673 ]  
 
FlexO atomic functional model     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1671 ]  
 
Considerations of interconnection between FlexE and xGE     China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1663 ]  
 
Communication channel in G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Deutsche Telekom AG , Telefon AB - LM Ericsson   Q14/15   2016-02-01
[ 1654 ]  
 
Proposal on synchronization information model     China Mobile Communications Corporation   Q14/15, Q13/15   2016-02-01
[ 1652 ]  
 
The planning and monitoring of the synchronization paths     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q13/15   2016-02-01
[ 1650 ]  
 
Measurement methods of message delay time for time synchronization     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q13/15   2016-02-01
[ 1648 ]  
 
Proposal to include time synchronization defects and performance monitoring functions in G.781.1     China Mobile Communications Corporation   Q13/15   2016-02-01
[ 1647 ]  
 
Proposal to include frequency synchronization defects and performance monitoring functions in G.781     China Mobile Communications Corporation   Q13/15   2016-02-01
[ 1646 ]  
 
Considerations on the selection of ePRTC/PRTC T-GMs by alternate BMCA     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Q13/15   2016-02-01
[ 1641 ]  
 
Requirement of evaluation of optical layer protection     China Unicom   Q9/15   2016-02-01
[ 1638 ]  
 
Comments on Reference model for centralized recovery     China Unicom   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1635 ]  
 
Proposal of requirements for protection scheme in C 1632     Bharti Airtel Limited , China Unicom , Huawei Technologies Co., Ltd.   Q9/15   2016-02-01
Results:360 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26