International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:360 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  [ Source: China ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1202 ]  
 
Using Standard GFP-T to map CPRI clients into an ODU Carrier - Proposed addition to the draft CPRI-over-OTN Supplement     China Mobile Communications Corporation , Coriant GmbH & Co. KG , FiberHome Technologies Group , PMC-Sierra, Inc.   Q11/15   2015-06-05
[ 1201 ]  
 
Test results based on ONU with integrated OTDR reflecting device for Appendix I.2 of L.53     China Telecommunications Corporation   Q17/15   2015-06-05
[ 1195 ]  
 
Considerations on the mapping of FlexE Client and Subrate signals into OTN     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2015-06-04
[ 1194 ]  
(Rev.1) 
Proposal on extending OTN to support private line service applications     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2015-06-04
[ 1193 ]  
 
Considerations on CPRI over OTN     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2015-06-04
[ 1180 ]  
 
Proposal to start a new project to define FlexO interfaces     China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2015-06-03
[ 1178 ]  
 
Consideration of conversion between OTUCn and OTUCn subrating     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2015-06-03
[ 1171 ]  
(Rev.1) 
Application scenario of flexible OTN based on logical channel model     China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (CATR) , ZTE Corporation   Q11/15   2015-06-01
[ 1170 ]  
 
Proposed text for Clause 11 of G.asdtn on Management of the applications     China Telecommunications Corporation   Q14/15, Q12/15   2015-06-01
[ 1081 ]  
 
Discussion on specifying pilot tone related parameters at reference point SS     ADVA Optical Networking , China Mobile Communications Corporation , China Unicom , Huawei Technologies Co. Ltd.   Q6/15   2014-11-11
[ 1080 ]  
 
Proposal for proceeding with the revision on G.697     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q6/15   2014-11-11
[ 1079 ]  
 
Considerations on control information communications from HEE to TEE     China Unicom , Huawei Technologies Co. Ltd.   Q6/15   2014-11-11
[ 1075 ]  
 
Correction to G.8260, Figure 9     Calnex Solutions Limited , China Unicom   Q13/15   2014-11-11
[ 1037 ]  
 
Proposed protection for a failure of interconnected link in G.MDSP     China Unicom , ZTE Corporation   Q9/15   2014-11-11
[ 1036 ]  
 
Consideration on network objective in G.mdsp     China Unicom , ZTE Corporation   Q9/15   2014-11-11
[ 1029 ]  
 
Proposal to revise G.suppl.41 considering 100G application     China Unicom , Ministry of Industry and Information Technology (MIIT)   Q8/15   2014-11-11
[ 1028 ]  
 
Proposal to revise G.973.1 considering 100G application     China Unicom , Ministry of Industry and Information Technology (MIIT)   Q8/15   2014-11-11
[ 1027 ]  
 
Proposal to revise G.973 considering 100G application     China Unicom , Ministry of Industry and Information Technology (MIIT)   Q8/15   2014-11-11
[ 1019 ]  
 
Proposal for Clause 13 and Appendix II     China Telecommunications Corporation , ZTE Corporation   Q2/15   2014-11-11
[ 1018 ]  
 
Conclusions of "PTP only" and "SyncE+PTP" network test     China Unicom   Q13/15   2014-11-11
[ 1016 ]  
 
Test experience and requirements of intelligent node elements in optical fiber networks     China Unicom   Q16/15   2014-11-11
[ 1015 ]  
 
Consideration on the interconnected link at the domain boundary     China Unicom , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2014-11-11
[ 1014 ]  
 
Consideration on the Back-to-Back interconnection scenarios of G.MDSP     China Unicom   Q9/15   2014-11-11
[ 1013 ]  
 
Requirement of one to one and bidirectional switching protection of optical layer     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Q9/15   2014-11-11
[ 1011 ]  
 
Proposal of left questions in G.873.1 Amendment 1     China Unicom , Huawei Technologies Co. Ltd.   Q9/15   2014-11-11
[ 1010 ]  
 
Consideration of higher bitrate service in G.metro     China Unicom , Ericsson Canada, Inc.   Q6/15   2014-11-11
[ 1009 ]  
 
Proposal to specify the quantity requirement of add/drop wavelengths of OADM functions in G.metro     China Unicom   Q6/15   2014-11-11
[ 1008 ]  
 
Proposal on a new G.654 category     China Unicom , Corning Incorporated , OFS Fitel, LLC   Q5/15   2014-11-11
[ 966 ]  
 
Proposal to specify the EVM related parameters of 100G transmitters in G.698.2     China Unicom , Deutsche Telekom AG Standardization , EXFO Inc. , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q6/15   2014-11-10
[ 952 ]  
 
Measurement accuracy of PRTC     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-11-10
[ 951 ]  
 
High-Level Time Synchronization Functional Model based on Media-Independent and Media-Dependent Layers     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2014-11-10
[ 950 ]  
 
G.vdsl: Technical proposals for enhanced data rate and co-existence with vectored Profiles 17a     China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-11-10
[ 949 ]  
 
G.vdsl: Requirements for enhanced data rate and co-existence with vectored Profiles 17a     China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-11-10
[ 946 ]  
 
Proposal for studying node elements in optical fibre infrastructure management systems     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q16/15   2014-11-10
[ 937 ]  
 
Implementation of protection with ONU wavelength tuning     China Telecommunications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q2/15   2014-11-10
[ 936 ]  
 
Proposal for power saving by tuning     China Unicom , ZTE Corporation   Q2/15   2014-11-10
[ 930 ]  
 
B100g OTN interface considerations     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2014-11-10
[ 927 ]  
 
Proposal on Sync Management and OAM     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q14/15, Q13/15, Q10/15   2014-11-10
[ 926 ]  
 
Proposal for OTN synchronization     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2014-11-10
[ 925 ]  
 
Experiments and analysis on automatic asymmetry compensation     China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation   Q13/15   2014-11-10
[ 924 ]  
 
Fronthual synchronization requirements     China Mobile Communications Corporation   Q13/15   2014-11-10
[ 923 ]  
 
Proposal on defining the sync layer functions of OTN and extending G.781     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-11-10
[ 922 ]  
 
CPRI clients high efficiency mapping considerations     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd.   Q11/15   2014-11-10
[ 921 ]  
 
Proposal of updates to G.8152     China Mobile Communications Corporation   Q14/15   2014-11-10
[ 920 ]  
 
Proposal of Configuration Management for G.8131     China Mobile Communications Corporation   Q9/15, Q14/15   2014-11-10
[ 919 ]  
 
Clock Management and Information Model     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q14/15, Q13/15   2014-11-10
[ 918 ]  
 
Intelligent Clock Use Case and Requirements     China Mobile Communications Corporation   Q14/15, Q13/15, Q12/15   2014-11-10
[ 917 ]  
 
Requirements of centralized call and connection management for the ASDTN     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q14/15   2014-11-10
[ 913 ]  
 
B100G "L0 Service" considerations     China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2014-11-10
[ 911 ]  
 
Reducing complexity of B100G IrDI     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2014-11-10
Results:360 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-23