International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:19 total items.
Contributions  [ Source: ZTE Corporation ]  [ Questions: Q9/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1948 ]  
 
2016-09-02 ZTE Corporation   Proposal to update clause 11 "OTN survivability techniques" in G.872     Q9/15, Q12/15, Q11/15  
[ 1758 ]  
 
2016-02-02 ZTE Corporation   DNI protection method in G.MDSP     Q9/15  
[ 1632 ]  
 
2016-02-01 Bharti Airtel Limited , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Proposal of initial a new standardization for Port-based protection in OTN network     Q9/15  
[ 1630 ]  
 
2016-02-01 China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal to restart working on G.8132 aligned with MPLS working group, IETF     Q9/15  
[ 1625 ]  
 
2016-02-01 Electronics and Telecommunications Research Institute (ETRI) , ZTE Corporation   Proposal on Hold-off timer     Q9/15  
[ 1623 ]  
 
2016-02-01 ZTE Corporation   Proposed texts for G.808.3     Q9/15  
[ 1609 ]  
 
2016-02-01 China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Proposals about centralized recovery for SDN controlled transport network     Q9/15, Q14/15, Q12/15  
[ 1412 ]  
 
2015-06-09 ZTE Corporation   A scenario for interworking in G.mdsp     Q9/15  
[ 1367 ]  
 
2015-06-09 ZTE Corporation   Proposal on Hold-off timer in G.873.1     Q9/15  
[ 1366 ]  
 
2015-06-09 ZTE Corporation   Proposal on SNC protection in G.808.1     Q9/15  
[ 1038 ]  
 
2014-11-11 ZTE Corporation   Proposal of ODU SMP     Q9/15  
[ 1037 ]  
 
2014-11-11 China Unicom , ZTE Corporation   Proposed protection for a failure of interconnected link in G.MDSP     Q9/15  
[ 1036 ]  
 
2014-11-11 China Unicom , ZTE Corporation   Consideration on network objective in G.mdsp     Q9/15  
[ 1015 ]  
 
2014-11-11 China Unicom , Huawei Technologies Co. Ltd. , ZTE Corporation   Consideration on the interconnected link at the domain boundary     Q9/15  
[ 580 ]  
 
2014-03-10 ZTE Corporation   Consideration about a requirement for consistency of switching action in G.mdsp     Q9/15  
[ 579 ]  
 
2014-03-10 ZTE Corporation   A proposed protection mechanism for a failure use case in G.MDSP     Q9/15  
[ 529 ]  
 
2014-03-09 China Unicom , ZTE Corporation   Proposal of Multi-failure processing for ODUsmp     Q9/15  
[ 528 ]  
 
2014-03-09 ZTE Corporation   Proposal of APS signalling transmitting pattern for ODUsmp     Q9/15  
[ 213 ]  
 
2013-06-17 ZTE Corporation   Status update for ODU SMP     Q9/15  
Results:19 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-10-1