International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:30 total items.
Contributions  [ Source: FiberHome Technologies Group ]  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1738 ]  
 
Physical and logical node in G.MDSP     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1737 ]  
(Rev.1) 
ERP consideration in G.MDSP     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1736 ]  
 
Protection method for DNI scenario in G.mdsp     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1735 ]  
(Rev.1) 
Proposals for Interconnection use case in Appendix I of G.MDSP     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1689 ]  
 
Consideration of ERP Management in G.Sup52     FiberHome Technologies Group   Q9/15, Q14/15   2016-02-01
[ 1684 ]  
 
ERP Management Requirements of G.8032     FiberHome Technologies Group   Q9/15, Q14/15   2016-02-01
[ 1632 ]  
 
Proposal of initial a new standardization for Port-based protection in OTN network     Bharti Airtel Limited , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q9/15   2016-02-01
[ 1630 ]  
 
Proposal to restart working on G.8132 aligned with MPLS working group, IETF     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q9/15   2016-02-01
[ 1609 ]  
 
Proposals about centralized recovery for SDN controlled transport network     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1433 ]  
(Rev.1) 
Consideration on DNI fault scenarios in G.MDSP     FiberHome Technologies Group   Q9/15   2015-06-09
[ 1417 ]  
 
Proposals for the latest draft of G.mdsp     China Unicom , FiberHome Technologies Group   Q9/15   2015-06-09
[ 1387 ]  
 
Consideration Hybrid Interconnection in G.MDSP     FiberHome Technologies Group   Q9/15   2015-06-09
[ 1371 ]  
 
Consideration DNI architecture in G.MDSP     FiberHome Technologies Group   Q9/15   2015-06-09
[ 1368 ]  
 
Requirement analysis of optical layer protection in metro WDM networks     China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Q9/15   2015-06-09
[ 1013 ]  
 
Requirement of one to one and bidirectional switching protection of optical layer     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Q9/15   2014-11-11
[ 908 ]  
 
clarification of protected domain an protected subnetwork for G.MDSP     FiberHome Technologies Group   Q9/15   2014-11-10
[ 907 ]  
 
Recovery scenario consideration in G.msdp     FiberHome Technologies Group   Q9/15   2014-11-10
[ 906 ]  
 
Ethernet ring DNI function model for MDSP     FiberHome Technologies Group   Q9/15   2014-11-10
[ 905 ]  
(Rev.1) 
Considerations about vertical links between interconnected nodes     FiberHome Technologies Group   Q9/15   2014-11-10
[ 708 ]  
 
Proposal of starting a new work item or modify the existing recommendations on optical layer protection     China Unicom , FiberHome Technologies Group   Q9/15   2014-03-11
[ 570 ]  
(Rev.1) 
consideration of recovery network sinario in MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 569 ]  
 
Different switching types in each domain of MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 568 ]  
(Rev.1) 
Consideration of Network Objectives in the latest draft of G.mdsp     FiberHome Technologies Group   Q9/15   2014-03-10
[ 394 ]  
 
Selection of protection transport entities in m1 SMP architecture     FiberHome Technologies Group   Q9/15   2013-06-18
[ 393 ]  
 
Editorial suggestions for G.8131.1     FiberHome Technologies Group   Q9/15   2013-06-18
[ 390 ]  
 
Definition for Broadcast Bridge in G.8131.1     FiberHome Technologies Group   Q9/15   2013-06-18
[ 356 ]  
 
Modification of pre-emption principles in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 354 ]  
 
some editorial suggestions for G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 353 ]  
 
proposal text about network objective of configuration inconsistance in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 351 ]  
 
priority consideration for preemption in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
Results:30 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-30