International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:199 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
Contributions  [ Questions: Q9/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1849 ]  
(Rev.1) 
2016-02-02 ADVA Optical Networking , Alcatel-Lucent USA Inc. , Cisco Systems, Inc.   Proposal for MDSP compromise     Q9/15  
[ 1794 ]  
 
2016-02-02 China Unicom , Huawei Technologies Co., Ltd.   Cascaded and nested protection     Q9/15, Q11/15  
[ 1790 ]  
 
2016-02-02 China Unicom   Test result for multi-domain nested protection     Q9/15  
[ 1788 ]  
 
2016-02-02 China Unicom   Test result for multi-domain cascaded protection     Q9/15  
[ 1765 ]  
(Rev.1) 
2016-02-02 Electronics and Telecommunications Research Institute (ETRI) , Telecom Italia S.p.A.   Proposal of adding PW linear protection to G.8131     Q9/15  
[ 1760 ]  
 
2016-02-02 Electronics and Telecommunications Research Institute (ETRI)   Reviews and proposed actions on TD438/WP3 (LS/i/r on request for clarification on IEEE STD 802.1AX)     Q9/15  
[ 1758 ]  
 
2016-02-02 ZTE Corporation   DNI protection method in G.MDSP     Q9/15  
[ 1738 ]  
 
2016-02-02 FiberHome Technologies Group   Physical and logical node in G.MDSP     Q9/15  
[ 1737 ]  
(Rev.1) 
2016-02-02 FiberHome Technologies Group   ERP consideration in G.MDSP     Q9/15  
[ 1736 ]  
 
2016-02-02 FiberHome Technologies Group   Protection method for DNI scenario in G.mdsp     Q9/15  
[ 1735 ]  
(Rev.1) 
2016-02-02 FiberHome Technologies Group   Proposals for Interconnection use case in Appendix I of G.MDSP     Q9/15  
[ 1715 ]  
 
2016-02-01 China Unicom , Huawei Technologies Co., Ltd.   Proposed Text to update Node Behavior in G.otnsmp     Q9/15  
[ 1707 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   A solution for OTN DNI scenario in G.mdsp (SP#5)     Q9/15  
[ 1706 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   A solution for Ethernet DNI scenario in G.mdsp (SP#4)     Q9/15  
[ 1704 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   Proposed APS Encoding Format in G.otnsmp     Q9/15  
[ 1689 ]  
 
2016-02-01 FiberHome Technologies Group   Consideration of ERP Management in G.Sup52     Q9/15, Q14/15  
[ 1684 ]  
 
2016-02-01 FiberHome Technologies Group   ERP Management Requirements of G.8032     Q9/15, Q14/15  
[ 1641 ]  
 
2016-02-01 China Unicom   Requirement of evaluation of optical layer protection     Q9/15  
[ 1638 ]  
 
2016-02-01 China Unicom   Comments on Reference model for centralized recovery     Q9/15, Q14/15, Q12/15  
[ 1635 ]  
 
2016-02-01 Bharti Airtel Limited , China Unicom , Huawei Technologies Co., Ltd.   Proposal of requirements for protection scheme in C 1632     Q9/15  
[ 1632 ]  
 
2016-02-01 Bharti Airtel Limited , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Proposal of initial a new standardization for Port-based protection in OTN network     Q9/15  
[ 1630 ]  
 
2016-02-01 China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal to restart working on G.8132 aligned with MPLS working group, IETF     Q9/15  
[ 1629 ]  
 
2016-02-01 China Mobile Communications Corporation   Proposal on draft outline of Recommendation G.8132     Q9/15  
[ 1625 ]  
 
2016-02-01 Electronics and Telecommunications Research Institute (ETRI) , ZTE Corporation   Proposal on Hold-off timer     Q9/15  
[ 1623 ]  
 
2016-02-01 ZTE Corporation   Proposed texts for G.808.3     Q9/15  
[ 1609 ]  
 
2016-02-01 China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Proposals about centralized recovery for SDN controlled transport network     Q9/15, Q14/15, Q12/15  
[ 1601 ]  
 
2016-02-01 Ministry of Industry and Information Technology (MIIT)   Proposal to the centralized restoration for G.asdtn and HRM     Q9/15, Q14/15, Q12/15  
[ 1591 ]  
 
2016-02-01 Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom   Promote the progress of G.MDSP to address operators' urgent needs     Q9/15  
[ 1581 ]  
 
2016-01-31 Alcatel-Lucent USA Inc.   Clarification of ODU SMP Bridge and Selector Operation     Q9/15  
[ 1557 ]  
(Rev.1) 
2016-01-29 Korea (Rep. of)   Proposal of restarting work on G.8132 MPLS-TP ring protection recommendation     Q9/15  
[ 1529 ]  
 
2016-01-28 Telecom Italia S.p.A.   Process for contributing     Q9/15  
[ 1480 ]  
 
2015-06-09 Alcatel-Lucent USA Inc.   Proposal to update and focus MDSP     Q9/15  
[ 1479 ]  
 
2015-06-09 Alcatel-Lucent USA Inc.   Proposal to update the MDSP living list     Q9/15  
[ 1472 ]  
 
2015-06-09 Huawei Technologies Co., Ltd.   MDSP linear DNI solution analysis on failure cases     Q9/15  
[ 1444 ]  
 
2015-06-09 China Unicom , Huawei Technologies Co., Ltd. , Telecom Italia S.p.A.   Open Issues with MDSP Network Objectives     Q9/15  
[ 1443 ]  
 
2015-06-09 China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co., Ltd. , Telecom Italia S.p.A.   Open Issues with MDSP Terminology     Q9/15  
[ 1442 ]  
 
2015-06-09 Alcatel-Lucent USA Inc. , China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Default Protection Switching Type for MPLS-TP linear protection     Q9/15, Q14/15, Q10/15  
[ 1439 ]  
 
2015-06-09 Huawei Technologies Co., Ltd.   Comments about cFOP for ring protection in G.8021     Q9/15, Q10/15  
[ 1433 ]  
(Rev.1) 
2015-06-09 FiberHome Technologies Group   Consideration on DNI fault scenarios in G.MDSP     Q9/15  
[ 1432 ]  
 
2015-06-09 Electronics and Telecommunications Research Institute (ETRI)   Proposed corrections to the DNI functional models in G.873.2     Q9/15  
[ 1431 ]  
 
2015-06-09 Electronics and Telecommunications Research Institute (ETRI)   Interaction between MDSP process supporting linear DNI and DRNI in G.mdsp     Q9/15  
[ 1430 ]  
 
2015-06-09 Electronics and Telecommunications Research Institute (ETRI)   Operation examples of the MDSP mechanism supporting linear DNI in G.mdsp     Q9/15  
[ 1429 ]  
 
2015-06-09 Electronics and Telecommunications Research Institute (ETRI)   Proposed mechanism to support linear DNI in G.mdsp     Q9/15  
[ 1417 ]  
 
2015-06-09 China Unicom , FiberHome Technologies Group   Proposals for the latest draft of G.mdsp     Q9/15  
[ 1412 ]  
 
2015-06-09 ZTE Corporation   A scenario for interworking in G.mdsp     Q9/15  
[ 1410 ]  
 
2015-06-09 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Comments on protection switching description in G.8121     Q9/15, Q14/15, Q10/15  
[ 1408 ]  
 
2015-06-09 China Mobile Communications Corporation , Telecom Italia S.p.A.   Operators' requirements for Multi-domain Segment Network Protection     Q9/15  
[ 1404 ]  
 
2015-06-09 China Mobile Communications Corporation , Electronics and Telecommunications Research Institute (ETRI)   Review comments on draft G.8131 Amd1     Q9/15  
[ 1387 ]  
 
2015-06-09 FiberHome Technologies Group   Consideration Hybrid Interconnection in G.MDSP     Q9/15  
[ 1371 ]  
 
2015-06-09 FiberHome Technologies Group   Consideration DNI architecture in G.MDSP     Q9/15  
Results:199 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-5-5