International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:18 total items.
Contributions  [ Source: Futurewei Technologies US R&D Center ]  [ AI/Question: Q4/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2084 ]  
 
G.fast: Revising ETR_min and ETR_min_eoc     Futurewei Technologies US R&D Center   Q4/15   2016-09-06
[ 2083 ]  
 
G.fast: Simulation results on linear precoding and non-linear precoding     Futurewei Technologies US R&D Center   Q4/15   2016-09-06
[ 2082 ]  
 
Adding a note to clarify PRMPSDds     Futurewei Technologies US R&D Center   Q4/15   2016-09-06
[ 2080 ]  
 
G.vector: Extending pilot sequence length to 1024     Futurewei Technologies US R&D Center   Q4/15   2016-09-06
[ 2078 ]  
 
G.vector: Supporting zero bits and measuring QLN based on zero bits     Futurewei Technologies US R&D Center   Q4/15   2016-09-06
[ 1838 ]  
 
G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission     Futurewei Technologies US R&D Center , Metanoia Technologies, Inc.   Q4/15   2016-02-02
[ 1774 ]  
 
On G.fast based solution for Coax application     British Telecommunications Public Ltd. Co. (BT Plc) , Futurewei Technologies US R&D Center   Q4/15   2016-02-02
[ 1348 ]  
 
G.fast: MIMO Processing versus FEXT Cancellation     Futurewei Technologies US R&D Center   Q4/15   2015-06-08
[ 1340 ]  
 
G.fast: Additional retransmission parameters exchanged during initialization     Futurewei Technologies US R&D Center   Q4/15   2015-06-08
[ 1339 ]  
 
G.fast: Test Parameter Xlin     Futurewei Technologies US R&D Center   Q4/15   2015-06-08
[ 1338 ]  
 
G.fast: Proposed items for G.9701 corrigendum     Futurewei Technologies US R&D Center , Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2015-06-08
[ 1035 ]  
 
G.vdsl: New VDSL2 Band Plan for China     Futurewei Technologies US R&D Center , Metanoia Technologies, Inc.   Q4/15   2014-11-11
[ 1034 ]  
 
Calculation of Hlog     Futurewei Technologies US R&D Center   Q4/15   2014-11-11
[ 1033 ]  
 
G.fast: Symbol transmission in L2.2 state     Futurewei Technologies US R&D Center   Q4/15   2014-11-11
[ 199 ]  
(Rev.1) 
G.fast: Initialization     Broadcom Corporation , Futurewei Technologies US R&D Center   Q4/15   2013-06-17
[ 108 ]  
 
G.fast: SOS-like Scheme as Fast OLR     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 107 ]  
 
G.fast: Transmitter Initiated Gain and Bit-Loading Adjustment     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 106 ]  
 
G.fast: Configuration of Gap Time Parameter Tg2     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
Results:18 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-21