International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:256 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  [ AI/Question: Q4/15 ]   Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 2078 ]  
 
2016-09-06 Futurewei Technologies US R&D Center   G.vector: Supporting zero bits and measuring QLN based on zero bits     Q4/15  
[ 2061 ]  
 
2016-09-05 Intel Corporation   G.fast: On robustness and recovery of G.fast link     Q4/15  
[ 2058 ]  
 
2016-09-05 Intel Corporation   G.fast: Comments on draft text of G.9701 Amendment 3     Q4/15  
[ 2055 ]  
 
2016-09-05 Alcatel-Lucent International   G.fast: G.fast Non-linear precoding simulation conditions: Imperfect Channel State Information (background)     Q4/15  
[ 2049 ]  
 
2016-09-05 Broadcom Corporation , Intel Corporation   G.fast: General framework of INM method     Q4/15  
[ 2039 ]  
 
2016-09-05 ZTE Corporation   G.Fast: Application reference model(s) for coax     Q4/15  
[ 2038 ]  
 
2016-09-05 ZTE Corporation   G.Fast: Indication of QoS queues status for DTA control     Q4/15  
[ 2037 ]  
 
2016-09-05 ZTE Corporation   G.Fast: Requirements for DTA capability Negotiation and environment confirmation in the initialization stage for operation on twisted-pair cables     Q4/15  
[ 2036 ]  
 
2016-09-05 ZTE Corporation   G.Fast: Consideration for signalling mechanism of DTA updates     Q4/15  
[ 2035 ]  
 
2016-09-05 ZTE Corporation   G.fast: Considerations on pre-coding of 212MHz profile     Q4/15  
[ 2023 ]  
 
2016-09-05 Sckipio Technologies S.I. Ltd.   G.fast: identifying and completing missing elements in the RPA procedure in G.9701 Corrigendum 3     Q4/15  
[ 2021 ]  
 
2016-09-05 Sckipio Technologies S.I. Ltd.   G.fast: identifying and completing missing elements in the FRA procedure in G.9701 Corrigendum 3     Q4/15  
[ 2006 ]  
 
2016-09-05 Sckipio Technologies S.I. Ltd.   G.fast: removing INP_min_shine in G.9701 Corrigendum 3     Q4/15  
[ 2005 ]  
 
2016-09-05 Sckipio Technologies S.I. Ltd.   G.hs, G.fast: text proposal for adding codepoints for G.9701 Annex X related items     Q4/15  
[ 2001 ]  
(Rev.1) 
2016-09-05 Sckipio Technologies S.I. Ltd.   G.fast: Text updates of Annex X sections (in G.9701 & G.9700) on profiles, termination impedance and transmit power for coax cables     Q4/15  
[ 1978 ]  
(Rev.1) 
2016-09-04 Sckipio Technologies S.I. Ltd.   G.fast: a corrigendum item for correcting a mistake in clause 8.3.1 "PTM-TC DTU format" of G.9701     Q4/15  
[ 1957 ]  
 
2016-09-02 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.fast: utility maximization for vector policy management     Q4/15  
[ 1956 ]  
 
2016-09-02 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.fast profiles 424 and 848     Q4/15  
[ 1955 ]  
 
2016-09-02 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Additional DTA Management Parameters     Q4/15  
[ 1858 ]  
 
2016-02-02 Intel Corporation   Configuration counters in L2 states (G.9701 Amd 1)     Q4/15  
[ 1856 ]  
 
2016-02-02 Intel Corporation   Comments on the draft G.9701 Amendment 1     Q4/15  
[ 1840 ]  
 
2016-02-02 Proximus PLC   G.fast: Proximus requirements for G.fast operation on coax and CAT5 wires up to at least 150 meters     Q4/15  
[ 1838 ]  
 
2016-02-02 Futurewei Technologies US R&D Center , Metanoia Technologies, Inc.   G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission     Q4/15  
[ 1817 ]  
 
2016-02-02 Broadcom Corporation , Sckipio Technologies S.I. Ltd.   G.fast: Reduction of number VF samples reporting formats     Q4/15  
[ 1816 ]  
 
2016-02-02 Broadcom Corporation , Sckipio Technologies S.I. Ltd.   G.fast: Clarification on byte order in SOC and EOC messages.     Q4/15  
[ 1812 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: G.9701 test parameters text improvements     Q4/15  
[ 1810 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: Various text updates to G.9701 Amd1 Low power mode     Q4/15  
[ 1809 ]  
 
2016-02-02 Broadcom Corporation   G.fast: Proposal to restrict upstream transmit power for 8dBm profile     Q4/15  
[ 1808 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter     Q4/15  
[ 1807 ]  
 
2016-02-02 Broadcom Corporation , Intel Corporation , Qualcomm, Inc.   G.vdsl: Mis-estimation of SNR during MEDLEY     Q4/15  
[ 1806 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   Future work on G.fast recommendations     Q4/15  
[ 1805 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   G.fast, Editorial Correction to Figure Z-2.1     Q4/15  
[ 1804 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: G.fast XLOG test parameter     Q4/15  
[ 1802 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2     Q4/15  
[ 1801 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam, G.fast: Clarification on Unavailable State for corrigendum     Q4/15  
[ 1800 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam: Test parameter update time stamps in G.997.2 Amd1     Q4/15  
[ 1799 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast, G.ploam: Corrigenda to G.9701 and G.997.2     Q4/15  
[ 1798 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.     Q4/15  
[ 1797 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam: Missing lom failure in G.997.1     Q4/15  
[ 1792 ]  
 
2016-02-02 Telecom Italia S.p.A.   G.vector: Considerations about Multi-Vendor Vectoring standardization     Q4/15  
[ 1791 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   G.fast: On data rate reporting     Q4/15  
[ 1787 ]  
 
2016-02-02 Intel Corporation   Proposal for TIGAV transmission method     Q4/15  
[ 1783 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   G.fast: Upstream Hlog reporting     Q4/15  
[ 1782 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   G.ploam, Capability reporting in G.997.1 and G.997.2     Q4/15  
[ 1774 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc) , Futurewei Technologies US R&D Center   On G.fast based solution for Coax application     Q4/15  
[ 1744 ]  
 
2016-02-02 Intel Corporation   On the details of TIGAV procedure     Q4/15  
[ 1743 ]  
 
2016-02-02 Intel Corporation   Proposed eoc settings for Annex Q when used with G.993.5     Q4/15  
[ 1742 ]  
 
2016-02-02 Intel Corporation   On the timeout of L2.1-Entry procedure (G.9701 Amd 1)     Q4/15  
[ 1740 ]  
 
2016-02-02 Intel Corporation   Proposed corrigendum to G.9701     Q4/15  
[ 1702 ]  
(Rev.1) 
2016-02-01 Huawei Technologies Co., Ltd. , Metanoia Technologies , Swisscom SA   G.fast Amendment 2: Maximum Bit Loading Revisited     Q4/15  
Results:256 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-12-6