International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:8 total items.
Contributions  [ Source: Deutsche Telekom AG ]  [ Questions: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 609 ]  
 
2014-03-10 Deutsche Telekom AG   NE Phase/Time Synchronization Supply Management     Q14/15, Q13/15  
[ 525 ]  
 
2014-03-08 Deutsche Telekom AG   G.8261 Synchronous Ethernet Network Jitter Specification beyond 10GE     Q13/15  
[ 524 ]  
 
2014-03-08 Deutsche Telekom AG   G.8262 Synchronous Ethernet Equipment Jitter Specification beyond 10GE     Q13/15  
[ 452 ]  
 
2014-02-27 Deutsche Telekom AG , Iometrix, Inc.   G.8273.2 T-BC Maximum Time Error Spezification     Q13/15  
[ 451 ]  
 
2014-02-27 Deutsche Telekom AG   Galileo as PRTC Source: IOV Measurement results     Q13/15  
[ 284 ]  
(Rev.1) 
2013-06-17 Deutsche Telekom AG   Q13/15 Synchronization Requirements Structure     Q13/15  
[ 153 ]  
 
2013-06-16 Calnex Solutions Limited , Deutsche Telekom AG   Extension to G.8273 Annex B to address the combined 'PRTC + T-GM' case     Q13/15  
[ 147 ]  
 
2013-06-16 A1 Telekom Austria AG , China Mobile Communications Corporation , Deutsche Telekom AG , Orange   T-GM: types, PRTC integration and performance     Q13/15  
Results:8 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-7-29