International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:19 total items.
Contributions  [ Source: ADVA Optical Networking ]  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2163 ]  
(Rev.1) 
G.8272.1 Holdover     ADVA Optical Networking , Microsemi Corp   Q13/15   2016-09-06
[ 2118 ]  
 
Additional table for phase/time requirements for cluster-based synchronization (G.8271).     ADVA Optical Networking , Orange   Q13/15   2016-09-06
[ 1767 ]  
 
Synchronization performance monitoring with Probe     ADVA Optical Networking , China Unicom   Q13/15   2016-02-02
[ 1749 ]  
 
G.8272.1 transient response     A1 Telekom Austria AG , ADVA Optical Networking , Deutsche Telekom AG , Microsemi Corporation , Orange   Q13/15   2016-02-02
[ 1748 ]  
 
G.8272.1 MTIE mask short term     A1 Telekom Austria AG , ADVA Optical Networking , Deutsche Telekom AG , Microsemi Corporation , Orange   Q13/15   2016-02-02
[ 1399 ]  
 
G.8275.2 A-BMCA options - Convergence and rearrangements aspects     ADVA Optical Networking   Q13/15   2015-06-09
[ 1397 ]  
 
Unfiltered BC specification     ADVA Optical Networking   Q13/15   2015-06-09
[ 1394 ]  
 
Phase and time distribution without physical layer frequency support     ADVA Optical Networking   Q13/15   2015-06-09
[ 1393 ]  
 
Network design aspects for phase delivery - Eth' speed mismatch     ADVA Optical Networking   Q13/15   2015-06-09
[ 1107 ]  
 
G.8275.1 & G.8275.2 : Mapping between ClockClass and Quality level     ADVA Optical Networking   Q13/15   2014-11-11
[ 1106 ]  
 
G.8275.2: Requirement for an Accurate T3 Value     ADVA Optical Networking , Calnex Solutions Limited   Q13/15   2014-11-11
[ 1105 ]  
 
G.8275.2 : A-BMCA     ADVA Optical Networking   Q13/15   2014-11-11
[ 1102 ]  
 
8271.2 : HRM & PDV Network Limits for Partial Timing Support     ADVA Optical Networking   Q13/15   2014-11-11
[ 361 ]  
 
Complementary data for reroute detection mechanisms     ADVA Optical Networking   Q13/15   2013-06-18
[ 360 ]  
 
Signalling TLV for distribution of timing information     ADVA Optical Networking   Q13/15   2013-06-18
[ 359 ]  
 
Self Monitoring Synchronization Network Comprised Of Probing Master/BC Nodes     ADVA Optical Networking   Q13/15   2013-06-18
[ 358 ]  
 
Concerns about Packet Delay Variation Noise Tolerance testing - G.8263 Appendix I     ADVA Optical Networking   Q13/15   2013-06-18
[ 357 ]  
 
Alternative Packet Delay Variation Noise Tolerance testing - G.8263 Appendix I     ADVA Optical Networking   Q13/15   2013-06-18
[ 355 ]  
 
Method for estimation Gamma distribution parameters based on FPP and Maximal Delay.     ADVA Optical Networking   Q13/15   2013-06-18
Results:19 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-28