Contributions
[ AI/Question: Q13/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 874 ]
|
PRTC ensemble type 1 (GNSS+Cs) performance specification
|
Deutsche Telekom AG Standardization
|
Q13/15
|
2014-11-09 |
|
[ 873 ]
|
PRTC ensemble function types to be specified
|
A1 Telekom Austria AG
,
Deutsche Telekom AG Standardization
,
Orange
|
Q13/15
|
2014-11-09 |
|
[ 872 ]
|
Synchronization Network Migration and need for PRTC ensemble functions
|
Deutsche Telekom AG Standardization
|
Q13/15
|
2014-11-09 |
|
[ 832 ]
|
Method to correct PDV for time synchronization using reference packet
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q13/15
|
2014-11-07 |
|
[ 831 ]
(Rev.1) |
Architecture for timing protection and correcting link asymmetry
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q13/15
|
2014-11-07 |
|
[ 817 ]
|
Formats of Frame-Mapped GFP PTP Messages for PTP-over-OTN-Overhead
|
PMC-Sierra, Inc.
|
Q13/15, Q11/15
|
2014-11-06 |
|
[ 813 ]
(Rev.1) |
Test of frequency delivery over aerial-optical-cable-based network
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
|
Q13/15
|
2014-11-05 |
|
[ 771 ]
|
Document describing migration from other PTP profiles to G.8275.1
|
Nokia Solutions and Networks Gmbh & Co. KG
|
Q13/15
|
2014-03-11 |
|
[ 770 ]
|
Updates to G.8263 Testing
|
Nokia Solutions and Networks Gmbh & Co. KG
|
Q13/15
|
2014-03-11 |
|
[ 759 ]
|
Access budget within E2E Time/phase HRM
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2014-03-11 |
|
[ 747 ]
|
Information on Upcoming New Work on B100G OTN
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 737 ]
|
Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 736 ]
|
Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 735 ]
|
Proposal on Synchronization OAM in packet networks
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q10/15
|
2014-03-11 |
|
[ 734 ]
|
Proposal for clockClass definition
|
China
|
Q13/15
|
2014-03-11 |
|
[ 731 ]
|
Update of the table listing the ITU-T Recommendations suitable for conformity/interoperability testing
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 730 ]
|
C&I pilot project for Synchronous Ethernet technology
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 729 ]
|
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - request for unicast transmission of multiple types of PTP messages using Signaling messages
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 728 ]
|
Guidance on the usage of the methods for PDV tolerance testing in G.8263
|
Iometrix, Inc.
,
Orange
|
Q13/15
|
2014-03-11 |
|
[ 727 ]
|
PTP GM performance specification in ITU-T
|
Iometrix, Inc.
,
Orange
|
Q13/15
|
2014-03-11 |
|
[ 726 ]
|
Notion of Quality Level of local clock in G.8265.1 during master selection
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 725 ]
|
Review of G.8275.1 Latest Draft
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 724 ]
|
Use of G.8265.1 telecom profile for Assisted Partial Timing Support
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 722 ]
|
Clarification of PTP unicast communication for G.8275.1, G.8275.2 and G.8265.1 - modification of frequencyTraceable flag, timeTraceable flag, and clockClass
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 721 ]
|
Comments on methods 1 and 2 for PDV tolerance testing in G.8263
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 720 ]
|
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - use of all 1's for targetPortIdentity
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 701 ]
|
Transparent clock model of 1588 over OTN
|
ZTE Corporation
,
Ministry of Industry and Information Technology (MIIT)
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 700 ]
|
Requirement of 1588 Transparent Clock function in OTN
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 699 ]
|
Withdrawn by submitter
|
N/A
|
Q13/15
|
2014-03-11 |
|
[ 687 ]
|
Consideration for 1588 over OTN by ESC
|
Calnex Solutions Limited
,
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 686 ]
|
Suggestions for time interface connection between OTN and Package Switching / Transport Network
|
Calnex Solutions Limited
,
China Unicom
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 685 ]
|
Test and analysis about PTP over OTN by transparent mode
|
Calnex Solutions Limited
,
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 680 ]
|
Considerations for PTP over OTN network
|
Ministry of Industry and Information Technology (MIIT)
,
China Telecommunications Corporation
,
China Unicom
|
Q13/15
|
2014-03-11 |
|
[ 660 ]
|
G.8275.1: Frequency based ClockClasses for Option II and III networks
|
Alcatel-Lucent USA Inc.
|
Q13/15
|
2014-03-10 |
|
[ 647 ]
|
PDV Templates for testing Partial-Timing Support
|
Microsemi
|
Q13/15
|
2014-03-10 |
|
[ 646 ]
|
Key Performance Indices for APTSC
|
Microsemi
|
Q13/15
|
2014-03-10 |
|
[ 645 ]
|
Explanations regarding Time-Stability Metrics
|
Ixia
,
Microsemi
|
Q13/15
|
2014-03-10 |
|
[ 644 ]
|
Use of MATIE on Time Error
|
Ixia
,
Microsemi
|
Q13/15
|
2014-03-10 |
|
[ 643 ]
|
G.8273.2: Measurement Appendix
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 642 ]
|
Time Error Deviation (TEDEV)
|
Ixia
,
Microsemi
|
Q13/15
|
2014-03-10 |
|
[ 641 ]
|
G.8273.2: Holdover
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 640 ]
|
Maximum Absolute Average Time Error (MAATE)
|
Ixia
,
Microsemi
|
Q13/15
|
2014-03-10 |
|
[ 639 ]
(Rev.1) |
Synchronization over OTN network
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2014-03-10 |
|
[ 638 ]
|
Test error of PRTC of G.8272
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-03-10 |
|
[ 637 ]
|
Proposals for G.8275.1
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-03-10 |
|
[ 636 ]
(Rev.1) |
Effect of lower network limit on PTP slave clock
|
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-03-10 |
|
[ 635 ]
|
SyncE transient measurement method for G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-03-10 |
|
[ 634 ]
|
Consideration of second-order filtering of T-BC for output transient due to SyncE rearrangement, plus several corrections for Appendix II/G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-03-10 |
|
[ 633 ]
|
Physical layer frequency to PTP noise transfer gain peaking in G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-03-10 |
|
[ 632 ]
|
Initial Results for Dynamic Time Error MTIE and TDEV at G.8271.1 Reference Point C
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-03-10 |
Results:474 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):