International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:301 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  [ Questions: Q11/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 2156 ]  
+Corr.1 
2016-09-06 Deutsche Telekom AG , Acacia , Alcatel-Lucent USA , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Proposal to modify procedural agreement between Q11 and Q6 regarding strong HD-FEC     Q6/15, Q11/15  
[ 2148 ]  
(Rev.1-2) 
2016-09-06 Deutsche Telekom AG , Acacia , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Staircase FEC as a candidate for Standard OTU4 MV IaDI Metro application     Q6/15, Q11/15  
[ 2137 ]  
 
2016-09-06 Xilinx Incorporation   Rate Compensation block Alignment in 400 GBASE-R     Q11/15  
[ 2110 ]  
(Rev.1) 
2016-09-06 ZTE Corporation   Transport synchronization message in FlexO interface     Q13/15, Q11/15  
[ 2109 ]  
 
2016-09-06 ZTE Corporation   Overhead processing of FlexE and FlexO atomic function     Q11/15  
[ 2100 ]  
 
2016-09-06 Coriant GmbH & Co. KG   Modelling of ETY layer     Q14/15, Q11/15, Q10/15  
[ 2091 ]  
 
2016-09-06 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   The suggestion about adding some new characteristics of optical transport network equipment     Q11/15  
[ 2053 ]  
 
2016-09-05 China Unicom   Requirement of define a detailed OSC frame format for use case of Open ROADM     Q11/15  
[ 2022 ]  
 
2016-09-05 Fujitsu Limited   Consideration of similar concept of OTUkV frame structure for OTUC     Q11/15  
[ 2010 ]  
 
2016-09-05 Intel Corporation   Protection switching performance     Q9/15, Q11/15  
[ 2009 ]  
 
2016-09-05 Intel Corporation   Removal of ODUkP-X virtual concatenation functions     Q11/15, Q10/15  
[ 1985 ]  
 
2016-09-05 Ministry of Industry and Information Technology (MIIT)   Considerations on metro 100Gb/s interoperability     Q11/15  
[ 1973 ]  
 
2016-09-04 IP Light   5G IEEE 1914 presentation and OTN impact     Q11/15  
[ 1966 ]  
 
2016-09-03 Microsemi Corporation   Proposed modifications to draft G.709.1 for PTP over FlexO OSMC     Q13/15, Q11/15  
[ 1965 ]  
 
2016-09-03 Microsemi Corporation   Considerations for 200G and 400G FlexO PHYs     Q11/15  
[ 1964 ]  
 
2016-09-03 Microsemi Corporation   Layer considerations with FlexO     Q12/15, Q11/15  
[ 1963 ]  
 
2016-09-03 Microsemi Corporation   Proposed modifications to draft G.709.1 for the modified frame format     Q11/15  
[ 1962 ]  
 
2016-09-03 Microsemi Corporation   Complexity Comparison of FlexO Frame Formats     Q11/15  
[ 1961 ]  
 
2016-09-03 Microsemi Corporation   Proposed modified FlexO frame format     Q11/15  
[ 1959 ]  
 
2016-09-02 Alcatel-Lucent USA Inc.   FlexE and future Ethernet Nomenclature and Modeling     Q11/15, Q10/15  
[ 1958 ]  
 
2016-09-02 Alcatel-Lucent USA Inc.   FlexE Aware sub-group mapping into OPUflex     Q11/15  
[ 1950 ]  
 
2016-09-02 ZTE Corporation   Proposal to add an appendix to G.872 to describe FlexE     Q12/15, Q11/15  
[ 1948 ]  
 
2016-09-02 ZTE Corporation   Proposal to update clause 11 "OTN survivability techniques" in G.872     Q9/15, Q12/15, Q11/15  
[ 1946 ]  
 
2016-09-02 ZTE Corporation   Proposal to add a description of the use of FlexO in G.872     Q12/15, Q11/15  
[ 1927 ]  
 
2016-09-02 Fujitsu Limited   IaDI/IrDI in PTN (G.8012 and G.8112)     Q3/15, Q11/15, Q10/15  
[ 1926 ]  
 
2016-09-02 Fujitsu Limited   Interface definition for OTN     Q12/15, Q11/15  
[ 1923 ]  
 
2016-09-02 KDDI Corporation   Consideration on IaDI FlexO     Q11/15  
[ 1918 ]  
 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Proposal to start a new project to specify CPRI over OTN phase 2     Q11/15  
[ 1917 ]  
(Rev.1-2) 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd. , Intel Corporation , IP Light , Xilinx Incorporation   CPRI over OTN phase II extension     Q11/15  
[ 1915 ]  
 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   100G/B100G multi-vendor FlexO based SOTUm interface family     Q11/15  
[ 1914 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Proposed corrections to Table 8-1/G.874 and 7-1/G.806     Q14/15, Q11/15  
[ 1913 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   OTN connections and protected connections     Q9/15, Q12/15, Q11/15  
[ 1912 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Atomic function specification text proposal of FlexE     Q11/15, Q10/15  
[ 1911 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   FlexE and xGE interoperability update     Q11/15  
[ 1910 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Atomic function specification text proposal of the interworking between ETCx and ETCflex     Q11/15  
[ 1909 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Atomic function specification text proposal of mapping a 64b/66b PCS coded signal into OPUflex     Q11/15  
[ 1908 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   ETC Naming Proposal     Q11/15, Q10/15  
[ 1907 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Comments on the open issues with the ETY_TT description in G.8021     Q11/15, Q10/15  
[ 1903 ]  
 
2016-08-31 Coriant GmbH & Co. KG   Proposed appendix to G.798 related to media layer protection     Q11/15  
[ 1901 ]  
 
2016-08-31 Coriant GmbH & Co. KG   Modelling media layer protection using the new G.872 model     Q9/15, Q12/15, Q11/15  
[ 1877 ]  
 
2016-08-30 Ciena Canada   FlexO IaDI and G.709.2     Q12/15, Q11/15  
[ 1876 ]  
 
2016-08-30 Ciena Canada   CPRI over OTN start of new recommendation     Q11/15  
[ 1875 ]  
 
2016-08-30 Ciena Canada   OTUCn/ODUCn GCC considerations for parallel implementations     Q11/15  
[ 1862 ]  
 
2016-02-02 Microsemi Corporation   Comment on the packet mapping text in draft G.709 clause 17.10     Q11/15  
[ 1860 ]  
 
2016-02-02 Inphi Corporation   FlexE Aware mapping justification encoding for method 6B     Q11/15  
[ 1837 ]  
 
2016-02-02 Microsemi Corporation   Proposed definition and text for ODUCn GMP ?CnD CRC-9 overhead in G.709     Q11/15  
[ 1826 ]  
 
2016-02-02 Huawei Technologies Co., Ltd. , China Mobile Communications Corporation , Orange   Extended SSM message of OTN     Q13/15, Q11/15  
[ 1823 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   New Simulation Results for RMS Frequency Offset for Transport of a CPRI Client over OTN     Q13/15, Q11/15  
[ 1822 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN - Computational Considerations     Q13/15, Q11/15  
[ 1821 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   Consideration of CPRI clock transport over OTN     Q13/15, Q11/15  
Results:301 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-9-29