International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:2210 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 735 ]  
 
Proposal on Synchronization OAM in packet networks     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15, Q10/15   2014-03-11
[ 734 ]  
 
Proposal for clockClass definition     China   Q13/15   2014-03-11
[ 733 ]  
 
SDN requirements in carrier's transport networks     China Mobile Communications Corporation   Q12/15   2014-03-11
[ 732 ]  
 
Discussions of Proposed draft text for G.8131     China Mobile Communications Corporation   Q9/15   2014-03-11
[ 731 ]  
 
Update of the table listing the ITU-T Recommendations suitable for conformity/interoperability testing     Iometrix, Inc.   Q13/15   2014-03-11
[ 730 ]  
 
C&I pilot project for Synchronous Ethernet technology     Iometrix, Inc.   Q13/15   2014-03-11
[ 729 ]  
 
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - request for unicast transmission of multiple types of PTP messages using Signaling messages     Iometrix, Inc.   Q13/15   2014-03-11
[ 728 ]  
 
Guidance on the usage of the methods for PDV tolerance testing in G.8263     Iometrix, Inc. , Orange   Q13/15   2014-03-11
[ 727 ]  
 
PTP GM performance specification in ITU-T     Iometrix, Inc. , Orange   Q13/15   2014-03-11
[ 726 ]  
 
Notion of Quality Level of local clock in G.8265.1 during master selection     Iometrix, Inc.   Q13/15   2014-03-11
[ 725 ]  
 
Review of G.8275.1 Latest Draft     Iometrix, Inc.   Q13/15   2014-03-11
[ 724 ]  
 
Use of G.8265.1 telecom profile for Assisted Partial Timing Support     Iometrix, Inc.   Q13/15   2014-03-11
[ 723 ]  
 
Considerations on independence of each single protection switching in G.MDSP     China Unicom   Q9/15   2014-03-11
[ 722 ]  
 
Clarification of PTP unicast communication for G.8275.1, G.8275.2 and G.8265.1 - modification of frequencyTraceable flag, timeTraceable flag, and clockClass     Iometrix, Inc.   Q13/15   2014-03-11
[ 721 ]  
 
Comments on methods 1 and 2 for PDV tolerance testing in G.8263     Iometrix, Inc.   Q13/15   2014-03-11
[ 720 ]  
 
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - use of all 1's for targetPortIdentity     Iometrix, Inc.   Q13/15   2014-03-11
[ 719 ]  
 
Proposal to update the definition of terms for submarine cable system in G.972     China Unicom , Ministry of Industry and Information Technology (MIIT)   Q8/15   2014-03-11
[ 718 ]  
 
Proposal to update G.977 considering ROADM and 100G application     China Unicom , Ministry of Industry and Information Technology (MIIT)   Q8/15   2014-03-11
[ 717 ]  
 
Proposal to update G.973.1 considering 100G application     China Unicom , Ministry of Industry and Information Technology (MIIT)   Q8/15   2014-03-11
[ 716 ]  
 
Proposal to add XPolM effect in G.697     China Unicom , ZTE Corporation   Q6/15   2014-03-11
[ 715 ]  
 
MFD distribution of G.652 fibre in China Unicom     China Unicom   Q5/15   2014-03-11
[ 714 ]  
(Rev.1) 
ONU power levelling for NG-PON2: TC layer issues     Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG , SK Telecom   Q2/15   2014-03-11
[ 713 ]  
 
Proposed parameters for WDM1r in G.984.5     China Telecommunications Corporation , ZTE Corporation   Q2/15   2014-03-11
[ 712 ]  
 
Experimental results of EVM related parameters of QPSK transmitter     China Unicom , ZTE Corporation   Q6/15   2014-03-11
[ 711 ]  
 
Proposal for Preconfigured Backup Channel Attributes     China Telecommunications Corporation , ZTE Corporation   Q2/15   2014-03-11
[ 710 ]  
 
Considerations about Addition of the Generic DSP Demodulation Flow in G.sup39     China Unicom , ZTE Corporation   Q6/15   2014-03-11
[ 709 ]  
 
Comments on Clause 13 of G.989.3     China Telecommunications Corporation , Futurewei Technologies US R&D Center , Verizon Communication Corporation , ZTE Corporation   Q2/15   2014-03-11
[ 708 ]  
 
Proposal of starting a new work item or modify the existing recommendations on optical layer protection     China Unicom , FiberHome Technologies Group   Q9/15   2014-03-11
[ 707 ]  
 
G.hn: Text Proposal for low power mechanism     China Telecommunications Corporation , ZTE Corporation   Q18/15   2014-03-11
[ 706 ]  
 
NG-PON2 Type B Protection     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2014-03-11
[ 705 ]  
 
1588 PTP into OTUk overhead via GFP     ZTE Corporation , China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT)   Q11/15   2014-03-11
[ 704 ]  
 
Withdrawn by submitter     N/A     2014-03-11
[ 703 ]  
 
Withdrawn by submitter     N/A     2014-03-11
[ 702 ]  
 
Boundary Clock and Transparent Clock functional model of 1588 over OTN     ZTE Corporation , Ministry of Industry and Information Technology (MIIT)   Q11/15   2014-03-11
[ 701 ]  
 
Transparent clock model of 1588 over OTN     ZTE Corporation , Ministry of Industry and Information Technology (MIIT)   Q13/15, Q11/15   2014-03-11
[ 700 ]  
 
Requirement of 1588 Transparent Clock function in OTN     China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15, Q11/15   2014-03-11
[ 699 ]  
 
Withdrawn by submitter     N/A   Q13/15   2014-03-11
[ 698 ]  
(Rev.1) 
Components interaction for virtualization in Transport SDN     China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q14/15, Q12/15   2014-03-11
[ 697 ]  
 
G.hn: Discussion on method for creating a secure G.hn domain     China Telecommunications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q18/15   2014-03-11
[ 696 ]  
 
Self-configuration requirement of CCN in Transport SDN     China Mobile Communications Corporation , China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q14/15, Q12/15   2014-03-11
[ 695 ]  
 
Withdrawn by submitter     N/A     2014-03-11
[ 694 ]  
 
Withdrawn by submitter     N/A   Q14/15   2014-03-11
[ 693 ]  
 
Hierarchy architecture of Transport SDN based on G.8080 components     ZTE Corporation   Q14/15, Q12/15   2014-03-11
[ 692 ]  
 
Interworking requirement of CCN in Transport SDN     China Mobile Communications Corporation , China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q14/15, Q12/15   2014-03-11
[ 691 ]  
 
proposal for TWDM PON Protection in G.989.1     China Telecommunications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q2/15   2014-03-11
[ 690 ]  
(Rev.1) 
G.hn: New Power Saving Mechanism     China Telecommunications Corporation , ZTE Corporation   Q18/15   2014-03-11
[ 689 ]  
 
Proposed new content for L.53     China Telecommunications Corporation   Q17/15   2014-03-11
[ 688 ]  
 
Optical layer protection requirement of Metro DWDM system     China Unicom , Ericsson Canada, Inc.   Q9/15   2014-03-11
[ 687 ]  
 
Consideration for 1588 over OTN by ESC     Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-03-11
[ 686 ]  
 
Suggestions for time interface connection between OTN and Package Switching / Transport Network     Calnex Solutions Limited , China Unicom   Q13/15, Q11/15   2014-03-11
Results:2210 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-09-28