Temporary Documents
(WP1)
|
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 405-WP1 ]
(Rev.1) |
G.hnem: Issues list
|
Editor G.hnem
|
Q15/15
|
2014-10-09 |
|
[ 404-WP1 ]
(Rev.1-2) |
G.nb-psd: Issues list
|
Editor G.nb-psd
|
Q15/15
|
2014-10-09 |
|
[ 403-WP1 ]
|
LS/i on Smart Grids security [from ITU-T SG17]
|
ITU-T SG17
|
Q15/15
|
2014-10-07 |
|
[ 402-WP1 ]
|
Report of the Q15/15 meeting (teleconference, 9 October 2014)
|
Rapporteur Q15/15
|
Q15/15
|
2014-10-02 |
|
[ 401-WP1 ]
(Rev.1) |
Report of the Q15/15 meeting (teleconference, 10 July 2014)
|
Rapporteur Q15/15
|
Q15/15
|
2014-10-02 |
|
[ 400-WP1 ]
|
LS/i on publication of TS 101 548 V 1.1.1 [from ETSI TC ATTM TM6]
|
ETSI TC ATTM TM6
|
Q4/15, Q1/15
|
2014-10-01 |
|
[ 399-WP1 ]
|
LS/i on AAP Consent of draft new Recommendations ITU-T J.195.2 and J.195.3 [from ITU-T SG9]
|
ITU-T SG9
|
Q4/15, Q2/15, Q18/15, Q15/15, Q1/15
|
2014-09-30 |
|
[ 398-WP1 ]
|
LS/i/r on new versions of the Access Network Transport (ANT) standardization overview and work plan (reply to SG15 LS122) [from ITU-T SG9]
|
ITU-T SG9
|
Q1/15
|
2014-09-30 |
|
[ 397-WP1 ]
|
LS/i/r on version 1 of the Home Network Transport (HNT) standardization overview and work plan (reply to SG15 LS123) [from ITU-T SG9]
|
ITU-T SG9
|
Q4/15, Q2/15, Q18/15, Q15/15, Q1/15
|
2014-09-30 |
|
[ 396-WP1 ]
|
LS/i/r on Overview and Work Plan on Smart Grids - request for feedback (reply to SG15 LS146) [from ITU-T SG9]
|
ITU-T SG9
|
Q15/15, Q1/15
|
2014-09-30 |
|
[ 395-WP1 ]
|
LS/i/r on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ) (reply to ITU-R WP 5B - 5B/TEMP/295 & ITU-R WP 1A - LS 19) [From ITU-T SG9]
|
ITU-T SG9
|
Q4/15, Q2/15, Q18/15, Q15/15, Q1/15
|
2014-09-30 |
|
[ 394-WP1 ]
|
LS/i on the Draft APT report on Smart Grid [from APT ASTAP]
|
APT ASTAP
|
Q15/15
|
2014-09-18 |
|
[ 393-WP1 ]
|
LS/i/r on new versions of the Access Network Transport (ANT) standardization overview and work plan (reply to SG15-LS122) [from ITU-T SG12]
|
ITU-T SG12
|
Q1/15
|
2014-09-17 |
|
[ 392-WP1 ]
|
LS/i on the IEEE 1905.1a Working Group draft (update) [IEEE P1905.1]
|
IEEE P1905.1
|
Q18/15
|
2014-09-15 |
|
[ 391-WP1 ]
|
LS/o/r on request for comments on 1st committee draft of ISO/IEC 27009, Sector specific applications of ISO/IEC 27001 (reply to ISO/IEC-JTC1/SC27 N13956) [to ISO/IEC JTC1/SC27/WG1]
|
Rapporteur Q1/15
|
Q4/15, Q2/15, Q18/15, Q15/15, Q1/15
|
2014-09-09 |
|
[ 390-WP1 ]
|
LS/i/r on ITU-T G.9801 implementers' guide (conformance and interoperability tests for OMCI-EPON) (reply to SG15-LS125) [from IEEE P1904.1 SIEPON WG]
|
IEEE P1904.1 SIEPON WG
|
Q2/15
|
2014-09-03 |
|
[ 389-WP1 ]
|
LS/o/r on Regional Band Plan(s) for China (reply to CCSA-LS003) [to CCSA TC6 WG2]
|
Rapporteur Q4/15
|
Q4/15
|
2014-09-01 |
|
[ 388-WP1 ]
|
LS/o on DSL CPE Common Mode Emissions [to CENELEC, CISPR and ETSI TC ERM EMC]
|
Rapporteur Q4/15
|
Q4/15
|
2014-09-01 |
|
[ 387-WP1 ]
|
LS/i on draft ISO/IEC 27009 [from ISO/IEC JTC1/SC 27]
|
ISO/IEC JTC1/SC27
|
Q4/15, Q2/15, Q18/15, Q15/15, Q1/15
|
2014-08-28 |
|
[ 386-WP1 ]
|
LS/i/r on new versions of the Access Network Transport (ANT) standardization overview (reply to SG15-LS122) [from ITU-R WP5A]
|
Liaison Rapporteur ITU-R WP5A
|
Q1/15
|
2014-08-28 |
|
[ 385-WP1 ]
|
LS/i on the RPF noise proposal [from ETSI TC ATTM TM6]
|
ETSI TC ATTM TM6
|
Q4/15
|
2014-08-28 |
|
[ 384-WP1 ]
|
LS/o on PLC transmit signal level [to CENELEC TC210]
|
Rapporteurs Q4, 18/15
|
Q4/15, Q18/15
|
2014-08-25 |
|
[ 383-WP1 ]
|
LS/i report on Access Network Transport (ANT) [from ISO/IEC JTC1/SC 25]
|
ISO/IEC JTC1/SC 25
|
Q1/15
|
2014-08-18 |
|
[ 382-WP1 ]
|
LS/i on the IEEE 1905.1a Working Group draft [from IEEE P1905.1]
|
IEEE P1905.1
|
Q18/15
|
2014-08-06 |
|
[ 381-WP1 ]
|
LS/i/r on Overview and Work Plan on Smart Grids (reply to SG15-LS146) [from ITU-T SG13]
|
ITU-T SG13
|
Q15/15, Q1/15
|
2014-07-28 |
|
[ 380-WP1 ]
|
LS/i/r on G.hn conformance testing pilot project (reply to COM15-LS147) [from ITU-T SG11]
|
ITU-T SG11
|
Q18/15
|
2014-07-23 |
|
[ 379-WP1 ]
|
LS/i/r on Overview and Work Plan on Smart Grids (reply to SG15 LS146) [from ITU-T SG11]
|
ITU-T SG11
|
Q15/15, Q1/15
|
2014-07-22 |
|
[ 378-WP1 ]
|
LS/i on G.fast Certification Program [from BBF]
|
BBF
|
Q4/15
|
2014-07-18 |
|
[ 377-WP1 ]
|
LS/i/r on Low Power Mode Control aspects (reply to SG15-LS095 ) [from BBF]
|
BBF
|
Q4/15
|
2014-07-18 |
|
[ 376-WP1 ]
|
LS/i on PSD used by LT-ME-PMD in G.996.2 [from BBF]
|
BBF
|
Q4/15
|
2014-07-18 |
|
[ 375-WP1 ]
|
LS/i/r on considerations on the G.9700 power spectral density (PSD) limit mask (reply to SG15-LS129) [from ITU-R WP4C]
|
ITU-R WP4C
|
Q4/15, Q1/15
|
2014-07-17 |
|
[ 374-WP1 ]
|
LS/i/r on New versions of the Access Network Transport (ANT) Standardization Overview and Work Plan (reply to SG15-LS122) [from ITU-R WP4B]
|
ITU-R WP4B
|
Q1/15
|
2014-07-17 |
|
[ 373-WP1 ]
|
LS/i/r on overview and work plan on Smart Grids (reply to COM15-LS146) [from SG16]
|
ITU-T SG16
|
Q15/15, Q1/15
|
2014-07-17 |
|
[ 372-WP1 ]
|
LS/i/r on new versions of the Access Network Transport (ANT) standardization overview and work plan (COM15-LS122) [from ITU-T SG16]
|
ITU-T SG16
|
Q1/15
|
2014-07-17 |
|
[ 371-WP1 ]
|
LS/i on the VDSL2 Regional Band Plan(s) [from CCSA]
|
CCSA
|
Q4/15
|
2014-07-15 |
|
[ 370-WP1 ]
|
LS/i/r on new versions of the Access Network Transport (ANT) standardization overview and work plan (reply to SG15-LS122) [from IEEE P1904.1]
|
IEEE P1904.5
|
Q1/15
|
2014-07-02 |
|
[ 369-WP1 ]
|
LS/i/r on new versions of the Access Network Transport (ANT) standardization overview and work plan (reply to SG15-LS122) [from ITU-R WP5D]
|
ITU-R WP5D
|
Q1/15
|
2014-07-01 |
|
[ 368-WP1 ]
|
LS/o on ITU-T G.9801 implementers' guide, "Conformance and interoperability tests for OMCI-EPON" [to IEEE 1904.1]
|
Rapporteur Q2/15
|
Q2/15
|
2014-06-26 |
|
[ 367-WP1 ]
|
LS/i on cooperation on the narrow-band PLT component of the Smart Grid project [from ITU-R WP1A]
|
ITU-R WP1A
|
Q18/15, Q15/15, Q1/15
|
2014-06-25 |
|
[ 366-WP1 ]
|
LS/i on excessive levels of radio frequency noise in the environment [from ITU-R WP1A]
|
ITU-R WP1A
|
Q4/15, Q18/15, Q15/15, Q1/15
|
2014-06-23 |
|
[ 365-WP1 ]
|
LS/i/r on specifications and performance of cabling intended for use with G.fast (reply to SG15-LS128) [from ITU-R WP1A]
|
ITU-R WP1A
|
Q4/15, Q1/15
|
2014-06-23 |
|
[ 364-WP1 ]
|
LS/i on considerations on the G.9700 power spectral density (PSD) limit mask [from ITU-R WP1A]
|
ITU-R WP1A
|
Q4/15, Q1/15
|
2014-06-23 |
|
[ 363-WP1 ]
|
LS/i on ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference [from ITU-R WP1A]
|
ITU-R WP1A
|
Q18/15, Q15/15, Q1/15
|
2014-06-23 |
|
[ 362-WP1 ]
|
LS/i/r on Overview and Work Plan on Smart Grids (reply to SG15-LS-146) [from ITU T SG2]
|
ITU-T SG2
|
Q15/15, Q1/15
|
2014-06-20 |
|
[ 361-WP1 ]
|
LS/i on the Approval of DTS 101 548 (European Requirements for Reverse Powering of Remote Access Equipment) [from ETSI TC ATTM TM6]
|
ETSI TC ATTM TM6
|
Q4/15
|
2014-06-17 |
|
[ 360-WP1 ]
|
LS/o on test noise definition for G.fast [to BBF]
|
Rapporteur Q4/15
|
Q4/15
|
2014-06-11 |
|
[ 359-WP1 ]
|
LS/i/r on overview and Work Plan on Smart Grids - request for feedback (reply to SG15-LS146) [from ITU-T SG3]
|
ITU-T SG3
|
Q15/15
|
2014-06-06 |
|
[ 358-WP1 ]
|
LS/i/r on new versions of the Access Network Transport (ANT) standardization overview and work plan (reply to SG15-LS123) [from ITU-R SG5]
|
ITU-R WP5A
|
Q1/15
|
2014-06-03 |
|
[ 357-WP1 ]
|
LS/i/r on version 1 of the Home Network Transport (HNT) standardization overview and work plan (reply to SG15-LS123) [from ITU-T SG5]
|
ITU-T SG5
|
Q18/15, Q1/15
|
2014-06-03 |
|
[ 356-WP1 ]
|
LS/i/r on Overview and Work Plan on Smart Grids (reply to SG15-LS146) [from ITU-T SG5]
|
ITU-T SG5
|
Q15/15
|
2014-06-03 |
Results:129 total items. Result page:
Previous -
1 -
2 -
3
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):