International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2014-11-24 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2014-11-24) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2014-11-24 to 2014-12-05

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Results:24 total items.
Contributions  [ Source: China Mobile Communications Corporation ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1081 ]  
 
Discussion on specifying pilot tone related parameters at reference point SS     ADVA Optical Networking , China Mobile Communications Corporation , China Unicom , Huawei Technologies Co. Ltd.   Q6/15   2014-11-11
[ 1080 ]  
 
Proposal for proceeding with the revision on G.697     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q6/15   2014-11-11
[ 1013 ]  
 
Requirement of one to one and bidirectional switching protection of optical layer     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Q9/15   2014-11-11
[ 952 ]  
 
Measurement accuracy of PRTC     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-11-10
[ 951 ]  
 
High-Level Time Synchronization Functional Model based on Media-Independent and Media-Dependent Layers     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2014-11-10
[ 946 ]  
 
Proposal for studying node elements in optical fibre infrastructure management systems     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q16/15   2014-11-10
[ 930 ]  
 
B100g OTN interface considerations     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2014-11-10
[ 927 ]  
 
Proposal on Sync Management and OAM     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q14/15, Q13/15, Q10/15   2014-11-10
[ 926 ]  
 
Proposal for OTN synchronization     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2014-11-10
[ 925 ]  
 
Experiments and analysis on automatic asymmetry compensation     China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation   Q13/15   2014-11-10
[ 924 ]  
 
Fronthual synchronization requirements     China Mobile Communications Corporation   Q13/15   2014-11-10
[ 923 ]  
 
Proposal on defining the sync layer functions of OTN and extending G.781     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-11-10
[ 922 ]  
 
CPRI clients high efficiency mapping considerations     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd.   Q11/15   2014-11-10
[ 921 ]  
 
Proposal of updates to G.8152     China Mobile Communications Corporation   Q14/15   2014-11-10
[ 920 ]  
 
Proposal of Configuration Management for G.8131     China Mobile Communications Corporation   Q9/15, Q14/15   2014-11-10
[ 919 ]  
 
Clock Management and Information Model     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q14/15, Q13/15   2014-11-10
[ 918 ]  
 
Intelligent Clock Use Case and Requirements     China Mobile Communications Corporation   Q14/15, Q13/15, Q12/15   2014-11-10
[ 917 ]  
 
Requirements of centralized call and connection management for the ASDTN     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q14/15   2014-11-10
[ 911 ]  
 
Reducing complexity of B100G IrDI     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2014-11-10
[ 868 ]  
 
The proposal about adding an note to the 15.7.2.4 of G.709     Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd.   Q11/15   2014-11-09
[ 867 ]  
 
Appendix of G.709 - considerations of phase/time synchronization over OTN     Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd.   Q11/15   2014-11-09
[ 834 ]  
 
Proposal of new sub section 12.3 of G.asdtn and correspond texts     China Mobile Communications Corporation , FiberHome Technologies Group   Q14/15, Q12/15   2014-11-07
[ 833 ]  
 
Proposal of basic functions separation principle between NMS/EMS and SDN controller     China Mobile Communications Corporation , FiberHome Technologies Group   Q14/15, Q12/15   2014-11-07
[ 813 ]  
(Rev.1) 
Test of frequency delivery over aerial-optical-cable-based network     China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT)   Q13/15   2014-11-05
Results:24 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-30